ML20094D232

From kanterella
Jump to navigation Jump to search
Forwards Addl TS Page Changes Affecting Plant TS Definitions Section Pages,Per 950914 Submittal of TS Change Request 95-15-0 Re Removal of Secondary Containment Isolation Valve Tables
ML20094D232
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 10/27/1995
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20094D237 List:
References
NUDOCS 9511030224
Download: ML20094D232 (2)


Text

St:tlin Suy4rt Orgttmsnt 8%

= y

PEco Energy Company Nuclear oroup Headquarters 96$ Chesterbrook Boulevard Wayne, PA 19087 5691 October 27,1995 Docket Nos. 50-352 50-353 Ucense Nos. NPF 39 NPF-85  ;

U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Limetick Generating Station, Units 1 and 2 Technical Specifications Change Request No. 95-15-0 Additional Affected Technical Specifications Pages Gentlemen:

By letter dated September 14,1995, PECO Energy Company submitted Technical Specifications (TS) Change Request No. 9515-0, ' Removal of Secondary Containment Isolation Valve Tables,' in accordance with 10 CFR 50.90.

Subsequent to the September 14,1995 submittal, it has been Identified that two other TS l pages (per unit) are affected by TS Change Request No. 9515 0 and need to be revised. i Specifically, Unit 1 and Unit 2 TS Definition 1.33 ' Reactor Enclosure Secondary Containment Integrity' and TS Definition 1.35 ' Refueling Floor Secondary Containment integrity

  • reference the valve tables proposed to be removed from TS.

Therefore, attachment i to this letter contains additional TS page changes affecting the Unit 1 and Unit 2 TS Definitions Section pages. These additional changes are consistent with the odginal request, do not alter the Information Supporting a Finding of No Significant Hazards Consideration and do not change the conclusion that the removal of the valve tables from TS does not involve an unreviewed safety question, and will not endanger the health and safety of the public. These TS pages are being submitted under affirmation, and the associated affidavit is enclosed, if you have any questions, please do not hesitate to contact us.

Very tnaly yours, G. A. Hunger, Jr.,

ft ,

Director. Licensing Enclosure, Attachments I cc: T, T. Martin, Administrator, Region I, USNRC (w/ enclosure, attachments)

N. S. Peny, USNRC Senior Resident inspector, LGS (w/enciowre, attachments) {

R. R. Janati, PA Bureau of Radiation Protection (w/ enclosure, attachments) g\

9511030224 951027 PDR ADDCK 05000352 P PDR

. l t

1 1

COMMONWEALTH OF PENNSYLVANIA  :

I

ss. I
  • l COUNTY OF CHESTER  :

D. B. Fetters, being first duly sworn, deposes and says: That he !s Vice President of PECO Energy I l

Company, the Applicant herein; that he has read the enclosed changes supporting Technical Specifications Change Request tJo. 95-15-0 ' Removal of Secondary Containment isolation Valve Tables,' for Umerick Generating Station, Unit 1 and Unit 2, Facility Operating Ucense Nos. NPF-39 and NPF-85, and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.'

i k . wQ 4

Vice President Subscribed and sworn to J before me this 27^ day of b 1995.

t I n Notary Public Notarir seal Mary Lou Skrr Notary Public Tredyffnn Tw Ghester County My Comm ssion opues May 17,1999

. P w.< , 8 nu F .s.,,,n s :n i ,

1 I

i 1

1