123 Main Street WNte Plains, New York 10601 914 681.6200 V
N E
b-cu ve esident
& Authority
""*o--*-
August 2, 1984 JPN-84-53 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Attention:
Mr. Domenic B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing
Subject:
James A. FitZPatrick Nuclear Power Plant Docket No. 50-333 Correction to Response to Request for Additional Information Regarding Containment Vent and Purge Valves
References:
1.
NRC letter, T.
A.
Ippolito to G. T.
Berry, dated July 18, 1980, " Containment Purging and venting During Normal Operation."
2.
PASNY letter, J.
P.
Bayne to T.
A.
- Ippolito, dated May 12, 1981 (JPN-81-3 4 ), " Containment Purging and Venting During Normal Operation."
Dear Sir:
In Reference 1, the NRC requested additional information regarding containment purging and venting during normal operation. The Authority responded to these questions via Reference 2.
As a result of this request for additional information and subsequent discussions with the NRC staff members, the Authority initiated an in-depth study of these valves and their operability during DBA conditions.
Detailed information and valve drawings were requested from the valve supplier, Fisher Controls, Inc.
W 0
D 00 3
P PDil I
r t
d' The purpose of this letter is to inform you of an incortect statement-contained in our response.
Recently, the Authority received.information from Fisher Controls that confirms that the valves in question have off-set discs.
Contrary to this fact, the' Authority erroneously stated in Reference 2 (response to. Question-4 on page 3) that these valves do not have off-set discs.
Th'e information included in our May 12, 1981 response was the best available at that time.
We are further investigating this issue with Fisher Controls.
- If.you-have any questions, please contact Mr. J. A. Gray, Jr.
of.my staff.