ML20094B534

From kanterella
Jump to navigation Jump to search
Withdraws Relief Request RI-17 Re Integrally Welded Shear Lugs on Piping
ML20094B534
Person / Time
Site: Cooper Entergy icon.png
Issue date: 10/26/1995
From: Mueller J
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NLS950208, NUDOCS 9511010118
Download: ML20094B534 (3)


Text

-

6

. y-Ml Nebraska Public Power District.

P.O. BOX 6632t

"%2lllE""

NLS950208 October 26,1995 l

U.S. Nuclear Regulatory Commission Attention: Document Control Desk l

Washington, D.C. 20555 l

Subject:

Withdrawal of Relief Request RI-17, Integrally Welded Shear Lugs on Piping Cooper Nuclear Station, Docket No. 50-298, License No. DPR-46

References:

1)

Letter (No. NLS950119) to USNRC Document Control Desk from Jolm II. Mueller (NPPD) dated June 21,1995, "Second Ten-Year Interval Inservice Inspection Relief Requests" 2)

Letter (No. NLS950139) to USNRC Document Control Desk from John H. Mueller (NPPD) dated July 14,1995, "Second Ten-Year Interval 1: service Inspection Program" Gentlemen:

i Nebraska Public Power District (District) hereby withdraws Relief Request RI-17 for the Second Ten-Year Interval Inservice Inspection (ISI) program. At the time this relief request was submitted (Reference 1), the District anticipated examining a certain number ofintegrally welded shear lugs on piping that would require disassembly of the associated pipe clamp. Based on subsequent review of the examination data and Revision 4 of the Second Ten Year Interval ISI program (Reference 2), the shear lugs that require disassembly of the associated support have been examined. Thaefore, the proposed relief from ASME Section XI requirements is no longer l

needed for this inte rval.

If you have any questions or require additional information regarding this relief request, please call.

7 i

Sincerely,

)

hm J'ohn H. Mueller Site Manager

/dnm.

...9511010118 951026

/

12 PDR.ADOCK 03000298 fy Q.

.PDR V

.I

- _ me _ m

g:, 3 t fiL

';W 9 _L

j

.A.

U. S. Nucfear Regulatory Commission.

V

< October 26,1995 '

' Page 2 of 7; LRegional Administrator

cc:

USNRC Region IV Arlington, TX NRC Resident inspector t

Cooper Nuclear Station NRC NRR Project Manager Rockville, MD NPG Distribution 5

t a.

. ~ +..y;

};i

e

. i 6 f

LIST OF NRC COMMITMENTS l ATTACHMENT-3

]

(-

Correspondence No NLS950208 The.following table identifies those actions committed to by the District in this document. Any other actions i.!scussed in the submittal. represent' intended or planned actions by the District. They are described to the NRC for the NRC's information and are not regulatory commitments.

Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.'

COMMITTED DATE-COMMITMENT OR OUTAGE Upon Notification-Amend the:2nd Ten-Year Interval ISI program to note the from NRC withdrawal of RI-17.

Acknowledging Withdrawal i

i l

a

' PROCEDURE NUMBER 0.42 REVISION NUMBER 0.2 PAGE 10 OF 16 l

t.

=

.