ML20094B076
| ML20094B076 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 07/31/1984 |
| From: | Mills L TENNESSEE VALLEY AUTHORITY |
| To: | Adensam E Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20094B080 | List: |
| References | |
| NUDOCS 8408060220 | |
| Download: ML20094B076 (2) | |
Text
_
e o
TENNESSEE VALLEY AUTHORITY CHATTANOOGA, TENNESSEE 37401 400 Chestnut Street Tower II July 31, 1984 Director of Nuclear Reactor Regulation Attention: Ms. E. Adensam, Chief Licensing Branch No. 4 Division of Licensing.
U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Ms. Adesam:
In the Matter of
)
Docket Nos. 50 -328 Tennessee Valley Authority
)
. Technical Specification (T/S) 4.4.9.1'.2 for unit 2 of our Sequoyah Nuclear Plant requires the reactor vessel material irradiation surveillance
.epecimen to be removed and examined at intervals required by 10 CFR 50, Appendix H in accordance with the schedule specified _by Table 4.4-5 of the unit 2 T/S. Enclosed is the final summary mport (WCAP-10509, " Analysis of Capsule T from Tennessee Valley Authority, Sequoyah Unit 2 Reactor Vessel Radiation Surveillance Program,") as mquired by 10 CFR 50, Appendix H, for the reactor vessel surveillance capsule T.
-We do not believe any change in the capsule withdrawal schedule in the technical specification, Table 4.4-5, is required at this time because the
_ schedule recommended in the technical report provides for capsule U to be removed at three effective full power years (EFPY) which is identical to
'that in our technical specification. - Also, based on the msults of the analysis of the surveillance capsule T, no changes in tae technical specification pressure temperature limit curves, figures 3.4-2 and 3.4-3 of the unit 2 T/S are required at this time because the curves in the summary are identical to the technical specification curves. The curves in the technical report mpresent an operational time period of 9 EFPY. Capsule U will be withdrawn at approximately 3 EFPY, and we will reassess the need for technical specification revisions when the results from the analysis of capsule U are available.
S400060220 840731 ~
/
fRADOCK 05000328 k) di PDR
\\
An Equal Opportunity Employer
=
y e
. Director of Nuclear Reactor Regulation July 31, 1984 If you have any questions concerning this matter, please get in touch with Jerry Wills at FTS 858-2683 Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, Manager Nuclear Licensing Sworn subs ib before me this day of 1984
$D Notary Public gg My Commission Expires e/"U/
Enclosure cc:
U.S. Nuclear Regulatory Commission Region II Attn:
Mr. James P. O'Reilly Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323