Submits Clarification of Control Rod Mobility Testing Methodology Contained in Startup Physics Testing Summary Submittals
ML20093L878
Person / Time
Site: Cooper Entergy icon.png
Issue date: 10/18/1995
From: Mueller J
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NLS950099, NUDOCS 9510260105
Download: ML20093L878 (3)


Text

_ _ _

y a

M Nebraska Public Power District P.O. BOX B

A 68321 "W4Ei.. " ".

NLS950099 October 18,1995 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Subject:

Clarification of Control Rod Mobility Testing Methodology Contained in Startup Physics Testing Summary Submittals

References:

1.

Letter from G. R. Horn to Document Control Desk, dated September 20, 1993, regarding the completion of Startup Physics Testing 2.

Letter from T. A. Ippolito to J. M. Pilant dated March 13,1979, regarding a request for additional information concerning the Cooper Nuclear Station (CNS) Cycle 5 reload

Dear Sir,

In keeping with its objective of providing clear and consistent information to the NRC, the Nebraska Public Power District (the District) has identified an example of submitted information that could potentially be misconstrued. In compliance with reference 2, CNS has been performing control rod withdrawal and insedion mobility checks as part of Startup Physics Testing. Since Reload 4, Cycle 5 in 1979, the District has submitted a Startup Physics Testing letter to the NRC which typically has included a discussion describing CNS compliance with the control rod mobility checks (see reference 1 as an example). The wording in the submittals leaves the impression that a mobility check will be performed prior to loading the next fuel bundle. In fact, it is only after the entire core is loaded that the control rod mobility checks are performed. This methodology is in keeping with the standard industry practice of performing this testing following core verification.

This issue was verbally communicated to Messrs. Phil Harrell and Terry Reis of NRC Region IV on April 4,1995, by the CNS Nuclear Licensing and Safety Manager. Investigations have revealed that Sections 1,2, and 3 of the associated attachments were recopied from submittal to submittal without critical review, most likely because the information regarding the Purpose, Description, and Criteria and Actions do not change between tests. A validation was performed for the remaining information, which was determined to be accurate and clear.

In reviewing this matter, it does not appear to have been the NRC's intent that Startup Physics Testing completion letters be submitted on a routine basis. Accordingly, the District intends to discontinue the submittal. The NRC should consider the Startup Physics Testing process to be

,, a,

9510260105 951018 PDR ADOCK 05000298 hn v

P PDR k

  • NSWbrdech=hte:358@nW*N2snid ^

mnuard

" dec='

mat =:a:rs=sr_

.a Tj; NLS950099 October 18,1995 Page 2 of 2 identical from cycle to cycle. However, the District will provide a Startup Physics Testing completion letter for any future refueling cycle where there is a change in the information that has been included in the previous submittal.

The District apologizes for any confusion this may have caused. Should you have any questions concerning this matter, please contact my office.'

Sincerely yours, h

k (H. Mueller J.

Site Manager cc:

Regional Administrator USNRC - Region IV NRC N~RR Project Manager USNRC NRC Resident Inspector Cooper Nuclear Station

- NPG Distribution 1

i l

i F

l 1

e e

LIST OF NRC COMMITMENTS ATTACHMENT 3 Correspondence No:NLS950099 The following table identifies those actions committed to by the District in this document.

Any other actions discussed in the submittal represent intended or planned actions by the District. They are described to the NRC for the NRC's information and are not regulatory commitments.

Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.

COMMITMENT COMMITTED DATE OR OUTAGE The District will provide a Startup Physics Testing NONE completion letter for any future refueling cycle where there is a change in the information that has been included in the previous submittal.

I l

PROCEDURE NUMBER 0.42 REVISION NUMBER 0 PAGE 12 OF 16 l.