Forwards Rev 0 to Third Ten-Yr Interval ISI Program for Cns. Relief Request RI-01 Submitted in Util to Allow for Presence of Fillet Weld on 10-inch Diameter Branch Connection on HPCI Turbine Exhaust Line Withdrawn
ML20093L185
Person / Time
Site: Cooper Entergy icon.png
Issue date: 10/18/1995
From: Mueller J
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20093L187 List:
References
NLS950157, NUDOCS 9510250234
Download: ML20093L185 (3)


Text

. ... . ..

e a M Nebraska Public Power District *MSTM""

NLS950157 October 18,1995 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Subjec. Third Ten-Year Interval Inservice Inspection Program Cooper Nuclear Station Docket No. 50-298, License No. DPR-46

Reference:

1) Letter (No. NLS950036) to U.S. NRC Document Control Desk from Nebraska Public Power District dated January 26,1995," Transmittal of Cooper 14uclear Station License Event Report No.94-032"
2) Letter (No.NLS950144) to U.S. NRC Document Control Desk from Nebraska Public Power District dated July 21,1995," Third Ten-Year Interval Inservice Inspection Relief Request"
3) Letter to G. R. Horn (NPPD) from James R. IIall (NRC NRR) dated September 20,1995," Withdrawal of Request for Relief from the Requirements of 10 CFR 50.55a; High Pressure Coolant Injection (IIPCI)

Turbine Exhaust Line Pressure Boundary,"(TAC No. M93037)

Gentlemen:

Enclosed is the initial revision of the Cooper Nuclear Station's (CNS's) Third Ten-Year Interval Inservice Inspection (ISI) program. This program is being submitted for Nuclear Regulatory Commission (NRC) review and approval per the requirements of 10 CFR 50.55a and has been prepared as part of the corrective actions and commitments stated in Reference 1. Please note

>hg that in Reference 2, the Nebraska Public Power District (District) submitted Relief Request RI-01 f to allow for the presence of a fillet weld on the 10-inch diameter branch connection to the Iligh kp Pressure Coolant injection (llPCI) turbine exhaust line at CNS. This relief request has been subsequently withdrawn, as documented in Reference 3 and noted in the enclosed submittal.

240.107 9510250234 951018 i

A PDR ADOCK 05000298 \\

6 PDR

\\

p,.---am-e. s I , ,, . g g g g

t U.S. Nuclear Regulatory Commission October 18,1995 Page 2 of 2 NRC approval of the relief requests contained in the enclosed submittal is requested by December 31,1995. The Third Ten-Year interval is scheduled to begin on January 1,1996, pending completion of the Fall 1995 refueling outage. If you have any questions, or need any additional infonnation, please contact me.

Sincerely, l). U W H. Mueller Site Manager l

/dnm j Enclosure cc: Regional Administrator USNRC Region IV Arlington, TX NRC Resident Inspector 1 Cooper Nuclear Station NRC NRR Project Manager Rockville, MD NPG Distribution i

l I

J u

LIST OF NRC COMMITMENTS l ATTACHMENT 3 l Correspondence No: NLS950157 The following table identifies those actions committed to by the District in this l document. Any other actions discussed in the submittal represent intended or j planned actions by the District. They are described to the NRC for the NRC's '

information and are not regulatory commitments. Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated )

regulatory commitments. l l

COMMITTED DATE COMMITMENT OR OUTAGE There are no new commitments contained in this N/A correspondence.