Forwards Quad-Cities Nuclear Power Station Unit 2 Cycle 14 Startup Test Results Summary. Facility Cycle 14 Began Commercial Operation on 950720 Following Refueling Outage & Consists of 144 Fresh Fuel Bundles & 580 Reload Bundles
ML20093K762
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 10/12/1995
From: Pearce L
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20093K764 List:
References
LWP-95-094, LWP-95-94, NUDOCS 9510240379
Download: ML20093K762 (2)


Text

.

o O)mmonwealth Edium Company Quad Cities Generatin:t Station i

22710 2tMth Asenue North 03rdova, lL 61212 9?io

)

Tel 3(W4d i 22 il i

LWP-95-094 J

October 12, 1995 U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Attn:

Document Control Desk j

Subject:

Quad Cities Nuclear Power Station Unit Two Startup Test Report Summary NRC Docket No. 50-265 t

Enclosed for your information and use is the Quad Cities Station Unit Two Cycle 14 Startup Test Report Summary. This report is submitted in accordance with Technical Specification DPR-30, Section 6.6.A.1.

Quad Cities Unit Two Cycle 14 began commercial operation on July 20, 1995 following a refueling outage. The Unit Two Cycle 14 core loading consists of 144 fresh fuel bundles (8x8 GE10 fuel) and 580 reload bundles.

All test data taken to date has been reviewed in accordance with applicable station procedures.

Exceptions from any criteria were evaluated to verify compliance with Technical Specification limits to ensure the acceptability of subsequent test results.

Attached are summaries of the following test results:

j Shutdown Margin Determination and Control Rod Functional Checks Core Verification Initial Critical Prediction Core Power Distribution Symmetry Analysis i

IOGy h

9510240379 951012 PDR ADOCK 05000265

- P PDR

'}

STMoRW9495.LWP A Unicom Company

iD

^

LWR-95-094 P' age 2.

~

October 12, 1995 Please contact the Nuclear Engineering Group if there are any questions.

i Si ely JhlL L. W.

Pearce Station Manager i

LWP/MG/kjv Attachment cc:

H. J. Miller,-Regional Administrator-RIII C. G. Miller, Resident Inspector-Quad Cities R. M. Pulsifer, Project Manager-NRR Office of Nuclear Safety-IONS d

Ent0RM95.LWP

.