Provides Response to GL 95-07, Pressure Locking & Thermal Binding Safety-Related Power-Operated Gate Valves
ML20093K758
Person / Time
Site: Peach Bottom, Limerick  
Issue date: 10/16/1995
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-95-07, GL-95-7, NUDOCS 9510240377
Download: ML20093K758 (2)


Text

l 3

Ctation Support Destrtmtnt e

G. L 95-07 PECO ENERGY 72 ma;;rne,..

965 Chesterbrook Boulevard Wayne, PA 19087 5691 October 16,1995 Docket Nos. 50-277 50-278 50-352 50-353 i

License Nos. DPR-44 DPR-56 NPF-39 i

4 NPF-85 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555

Subject:

Peach Bottom Atomic Power Station, Units 2 and 3 Limerick Generating Station, Units 1 and 2 60 Day Response to Generic Letter 95-07, " Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves."

Dear Sir:

The NRC issued Generic Letter (GL) 95-07, " Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves," on August 17,1995. In the GL, the NRC requested that addressees perform, or confirm that they previously performed, evaluations of operational configurations of safety-related, power operated gate valves for susceptibility to pressure locking and thermal binding. The GL also requested that addressees perform further analysis, and any needed corrective actions, to ensure that safety-related power operated gate valves that are susceptible to pressure locking or thermal binding are capable of performing their safety functions.

The NRC requested that all addresses submit, within 60 days of the date of the GL, a written response indicating whether or not they Intend to implement the action (s) requested in the GL.

If the addressee Intends to implement the requested action (s), the NRC requested that a schedule be provided for completing implementation of the requested actions. If an addressee chooses not to perform the requested action (s), they must provide a description of any proposed alternative course of action, the schedule for completing the attemative course of action (if applicable), and the safety basis for determining the acceptablilty of the planned alternative course of action. This letter provides PECO Energy Company's (PECO Energy) 60 day written response to GL 95-07 for Peach Bottom Atomic Power Station, Units 2 and 3, and Umerick Generating Station, Units 1 and 2.

nin-ns d d V U 6 4.1 951r/240377 951016 I

PDR ADOCK 05000277 0

P,

_ PDR.

i October 16,1996-i Page 2 i

PEC Energy will implement the actions as requested in the GL Our schedule for completing

" the implementation of these actions is in accordance with that stated in the GL; that is, the 90 day requested actions will be completed within 90 days, and the 180 day requested actions will be completed within 180 days of the date of the GL If you have any questions regarding this submittal, please contact us.

Sincerely, Y0YR G. A. Hunger, Jr.,