Informs That Util Will Implement Recommendations Outlined in GL Consistent W/Requested Actions Actions to Be Completed within 90 Days & 180 from Date of GL
ML20093K713
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/13/1995
From: Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-95-07, GL-95-7, LCV-0681, LCV-681, NUDOCS 9510240348
Download: ML20093K713 (2)


Text

,

d e%

5 Georgia Powei Company.

- 40 loverness Center Parkway r

Post Off.ce Box 1295

. Ditmingharn Alabarna 35201 Telephone 205.F7472

C.K.McCoy.

Georgia Power Nudear -

October 13,.1995

ge Presd

, p

,3

,,,,,m,,,,,

LCV-0681 I

Docket Nos. 50-424 50-425 1

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D C. 20555 Gentlemen:

t VOGTLE ELECTRIC GENERATING PLANT GENERIC LETTER 95-07 PRESSURE LOCKING AND THERMAL BINDING On August 17,1995, the NRC issued Generic Letter 95-07, " Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves." The generic letter a

contains a number of recommendations to ensure that pressure locking and thermal binding will not prevent safety-related gate valves from performing their design-basis functions. The generic letter requires licensees to respond within 60 days regarding their intentions relative to the implementation of the following requested actions outlined in the

. letter:

Within 90 days:

)

1. Perform a preliminary screening to identify valves which may be susceptible to pressure locking and/or thermal binding.
2. Document a basis for operability of potentially susceptible valves, or take appropriate actions in accordance with Technical Specifications.

Within 180 days:

1. Perform a detailed evaluation to identify valves which may be susceptible to pressure locking and/or thermal binding.
2. Perform additional analysis, and identify corrective actions, as required, to ensure that

. susceptible valves will be capable of performing their design-basis function.

r 240000 i 9510240348 951013 I g PDR ADOCK 05000424 A E-

_m. PDR,

._m W

ll'R. :..

GeorgiabherI U, S. Nuclear Regulatory Commission Page 2

Georgia Power Company (GPC) will implement the recommendations outlined in the
generic letter consistent with the requested actions to be completed within 90 days and

~

180 days respectively from the date of the generic letter. Georgia Power Company will also provide'a schedule for implementing any modifications that may be required in the

'180 day response.

In addition, GPC is participating in the Westinghouse Owners Group (WOG) Pressure Locking and Thermal Binding Task Team. -The WOG is working to develop a

. standardized methodology to address this issue and the results of this effort will be.

factored in Vogtle Electric Generating Plant program as deemed appropriate.

Mr. C. K. McCoy states that he is a Vice President of Georgia Power Company and is authorized to execute this oath on behalf of Georgia Power Company and that, to the best

' of his knowledge and belief, the facts set forth in this letter are true.

GEORGIA POWER COMPANY By:

' C. K. McCoy Sworn to a'nd subscribed before me this ay of OCMo

.1995.

WY*

Notary Ptiblic

~

CKM/IIET cc: Georgia Power Comoany Mr. J. B. Beasley, Jr.

Mr. M. Sheibani NORMS

. U S. Nuclear Regulatory Commission

' Mr. S. D. Ebneter, Regional Administrator Mr. L. L. Wheeler, Licensing Project Manager, NRR Mr. C. R. Ogle, Senior Resident Inspector, Vogtle LCV-0681

-