ML20093K532

From kanterella
Jump to navigation Jump to search
Informs That Fuel Load Schedule Revised to 841101 Fuel Load Date
ML20093K532
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 07/24/1984
From: Jens W
DETROIT EDISON CO.
To: James Keppler, Youngblood B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III), Office of Nuclear Reactor Regulation
References
EF2-72720, NUDOCS 8407310112
Download: ML20093K532 (1)


Text

e,

Cep6 H. Jm3 Vice Pravdert ikC1G87 CVVGU$

Detroi.t -

-2 i$$N$

July 24,-1984 EF2-72720 Go-3 4 /

-Mr. James G..Keppler Regional Administrator U.

S. Nuclear Regulatory Commission

_ Region III 799 Roosevelt Road Glen-Ellyn, Illinois 60137 h

Director of Nuclear Reactor Regulation Attention:

.Mr.

B. J.

Y ungblood, Chief o

Licensing ~ Branch No. 1 Division of Licensing U.

S.

Nuclear Regulatory Commission Washington, D.

C.

20555 Gentlemen:

Reference:

(1)

Fermi 2 NRC Docket No. 50-341 (2)

Detroit Edison to NRC Letter, " Fermi 2 Schedule", EF 2-682 70, April 24, 1984

Subject:

Fermi-2 Schedulo Reference 2 reported a potential delay in the schedule to load fuel and stated that a revised schedule would be announced after the mid-year review by the Board of Directors.

Following a meeting of the Board of Directors on July 23, 1984, a revised schedule to load fuel on November 1, 1984 was announced.

If you have any questions regarding this matter please call me.

Sincerely,

/

s/

M b

cca Mr.

P.

M.

Byron Mr. W.

R.

Butler Mr.

R.

C. Knop Mr. M.

D.

Lynch 8407310112 840724 00 PDR ADOCK 05000341 J

L A

PDR 0

s

. - - - -