ML20093J356
| ML20093J356 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 06/30/1984 |
| From: | Musolf D, Myrabo A NORTHERN STATES POWER CO. |
| To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| NUDOCS 8407300058 | |
| Download: ML20093J356 (5) | |
Text
'
'ht:
N' NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-263______
DATE 7-5-84____
CQMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 MONTH ______ JUNE 6-1-84 to Continuation of 1984 refueling outage.
6-30-84 A
a i
I 4
Note: Power operation defined av essentially 100% of rated power except for weekend load drops for specified surveillance testing.
8407300058 840630 PDR ADCCK 05000263 R
PDR i
Lk
-t, ry t (l
1 I
AVERAGE DAILY UNIT POWER LEVEL
. DOCKET NO.
50-263______
UNIT MonticeLLo__
DATE 7-5-84____
COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 MONTH ______ JUNE DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
~ ~ ~
(MWe-Net)
(MWe-Net) 1 17 9____.
9
_i______ ____
i8 3
_n 19
_2___
4
______ __ -i____________
o0
_a______
5
_______o_____.__
o1
_o
~
6
_o___
on
_o__
7
_o __ _ ___ _
,3
_i_ -
8
-1____________
24
-2____________
9
, e>
_o_____
io
_1__.___
o6
_o_
~
11
_o____________
o ~t
~____________
_n go
_o__________.
og
_o 13
_a_______.
9
_n o
14
-9_
30
~
15
-2____________
31 16
_ -1..______
INSTRUCTIONS On this f or rea t, List the average daily unit power level in MWe-Net for each day in the reporting inonth.
Ccapute to the nearest whole toeqawatt.
~
E04 hh.
OPERATING DATA REPORT DOCKET NO.
50-263______
DATE 7-5-84____
COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 OPERATING STATUS INotes i
- 1. Unit Name - ________________________Monticelto l
l
- 2. Reporting period: ___________________ JUNE I
I
- 3. Licensed Thermal Power (MWt);
____________1670 l
1
- 4. Nameplate Rating (Gross MWe):
_____________569 l
1
- 5. Design Electrical Rating (Net NWe):
_____545.4 l
l
'6.
Maximum Dependable Capacity (Gross MWe): __553 l
~l
- 7. Maximum Dependable Capacity (Net MWe).
____525 l_________________,________l
- 8. If Changes ' Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: __N/A_____________________________________________
- 9. Power Level To Which Restricted, If Any (Net MWe).
___N/A___________________
- 10. Reasons For Restrictions, If Any:
__N/A_____________________________________
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period
_____720
_____4367
____113976
- 12. Number Of Hours Reactor Was Critical 0.0
___ 810.5
__ 89915.4
- 13. Reactor Reserve Shutdown Hours
_____0.0
______0.0
_____940.7
- 14. Hours Generator On-Line 0.0
___ 808.8
__ 88003.0
- 15. Unit Reserve Shutdown Hours
_____0.0
______0.0
_______0.0
- 16. Gross Thermal Energy Generated (MUH) 0 897898
_141233814
- 17. Gross Electrical Energy Generated (MWH) __
0
__ 296117
__45185053
- 18. Net Electrical Energy Generated (MWH)
__ -1164
__ 274357
__43186121
- 19. Unit Service Factor 0.0%
___ 18.5%
____ 77.2%
- 20. Unit Availability Factor 0.0%'
___ 18.5%
____ 77.2%
21. Unit Capacity Factor (Usinq MDC Net)
__ -0.3%
___ 12.0%
____ 72.2%
- 22. Unit Capacity Factor (Using DER Net)
__ -0.3%
___ 11.3%
____ 70.9%
- 23. Unit Forced Outage Rate 0.0%
0.0%
5.3%
- 24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and D'uration of Each)
__ February 3, 1984 - Refuelinq Outage - 264 days ___________._____________
- 25. If Shut Down At End Of Report Period. Estimated Date Of Startup:__iO-24-84__
- 26. Units In Test Status (Prior to Commercial Operation)- N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
50-263 DOCKET NO.
1-UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N AME
' ~ ' " ' " " "
DATE COMPLETED BY
'A.
la Myrabo REPORT MONTH JUNE TELEPHONE 612/295-5151 "k
=
5; 3
3 Yk Licensee gn, h
Cause & Corrective 4
5-I: 3 Esent a7 g?
Action to s' "'
gjaie E
i5 j5 j
]j;s Repors =
m0
.E '
Prevent Recurrence w
a d
2 2-3-84 S
720.0 C
1 N/A ZZZZ ZZZZZZ Continuation of 1984 Refueling i
Outage i
4 4
I
- 8 e
3 4
I 2
Method:
- Exlubit G-Instructions F
- Forced Reason.
1-Manual for Preparation of Data 2
S: Scheduled A Equipment Failure (Explain)
Bataintenance oi Tes:
2-Manu21 Scram.
Entr> Sheets for Licensee
- 3. Automatic Ssram.
Event Report tLER) File tNUREG.
C. Refueling D. Regulator) Restriction 4.Oiher ( E xplain) 0161)
E-Operator Training & License E.samination 5
F-Administrative Exhibit I-Same Source G. Operational Er ror (Explaint tu!77)
II.Other (E xplain I m
O e
Northern States Power Company 414 fecollet Mall Minneapons. Minnesota 55401 Telephone (612) 330-5500 July 11, 1984 Director, Office of Resource Mar agement U S Nuclear Reguintory Commission Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLATE Dc;ket No. 50-263 License No. DPR-22 Monthly Operating Report June, 1984 Attached are twelve copies of the Monthly Operating Report for June, 1984 for the Monticello Nuclear Generating Plant.
d David Musoif Manager of Nuclear Support Services DMM/ dab cc: h gional Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector MPCA Attn: J W Ferman Attachment g$cgsbY CcTt d
4