ML20093J356

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for June 1984
ML20093J356
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 06/30/1984
From: Musolf D, Myrabo A
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8407300058
Download: ML20093J356 (5)


Text

'

'ht:

N' NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-263______

DATE 7-5-84____

CQMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 MONTH ______ JUNE 6-1-84 to Continuation of 1984 refueling outage.

6-30-84 A

a i

I 4

Note: Power operation defined av essentially 100% of rated power except for weekend load drops for specified surveillance testing.

8407300058 840630 PDR ADCCK 05000263 R

PDR i

Lk

-t, ry t (l

1 I

AVERAGE DAILY UNIT POWER LEVEL

. DOCKET NO.

50-263______

UNIT MonticeLLo__

DATE 7-5-84____

COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 MONTH ______ JUNE DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL

~ ~ ~

(MWe-Net)

(MWe-Net) 1 17 9____.

9

_i______ ____

i8 3

_n 19

_2___

4

______ __ -i____________

o0

_a______

5

_______o_____.__

o1

_o

~

6

_o___

on

_o__

7

_o __ _ ___ _

,3

_i_ -

8

-1____________

24

-2____________

9

, e>

_o_____

io

_1__.___

o6

_o_

~

11

_o____________

o ~t

~____________

_n go

_o__________.

og

_o 13

_a_______.

9

_n o

14

-9_

30

~

15

-2____________

31 16

_ -1..______

INSTRUCTIONS On this f or rea t, List the average daily unit power level in MWe-Net for each day in the reporting inonth.

Ccapute to the nearest whole toeqawatt.

~

E04 hh.

OPERATING DATA REPORT DOCKET NO.

50-263______

DATE 7-5-84____

COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 OPERATING STATUS INotes i

1. Unit Name - ________________________Monticelto l

l

2. Reporting period: ___________________ JUNE I

I

3. Licensed Thermal Power (MWt);

____________1670 l

1

4. Nameplate Rating (Gross MWe):

_____________569 l

1

5. Design Electrical Rating (Net NWe):

_____545.4 l

l

'6.

Maximum Dependable Capacity (Gross MWe): __553 l

~l

7. Maximum Dependable Capacity (Net MWe).

____525 l_________________,________l

8. If Changes ' Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: __N/A_____________________________________________
9. Power Level To Which Restricted, If Any (Net MWe).

___N/A___________________

10. Reasons For Restrictions, If Any:

__N/A_____________________________________

This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period

_____720

_____4367

____113976

12. Number Of Hours Reactor Was Critical 0.0

___ 810.5

__ 89915.4

13. Reactor Reserve Shutdown Hours

_____0.0

______0.0

_____940.7

14. Hours Generator On-Line 0.0

___ 808.8

__ 88003.0

15. Unit Reserve Shutdown Hours

_____0.0

______0.0

_______0.0

16. Gross Thermal Energy Generated (MUH) 0 897898

_141233814

17. Gross Electrical Energy Generated (MWH) __

0

__ 296117

__45185053

18. Net Electrical Energy Generated (MWH)

__ -1164

__ 274357

__43186121

19. Unit Service Factor 0.0%

___ 18.5%

____ 77.2%

20. Unit Availability Factor 0.0%'

___ 18.5%

____ 77.2%

21. Unit Capacity Factor (Usinq MDC Net)

__ -0.3%

___ 12.0%

____ 72.2%

22. Unit Capacity Factor (Using DER Net)

__ -0.3%

___ 11.3%

____ 70.9%

23. Unit Forced Outage Rate 0.0%

0.0%

5.3%

24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and D'uration of Each)

__ February 3, 1984 - Refuelinq Outage - 264 days ___________._____________

25. If Shut Down At End Of Report Period. Estimated Date Of Startup:__iO-24-84__
26. Units In Test Status (Prior to Commercial Operation)- N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

50-263 DOCKET NO.

1-UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N AME

' ~ ' " ' " " "

DATE COMPLETED BY

'A.

la Myrabo REPORT MONTH JUNE TELEPHONE 612/295-5151 "k

=

5; 3

3 Yk Licensee gn, h

Cause & Corrective 4

5-I: 3 Esent a7 g?

Action to s' "'

gjaie E

i5 j5 j

]j;s Repors =

m0

.E '

Prevent Recurrence w

a d

2 2-3-84 S

720.0 C

1 N/A ZZZZ ZZZZZZ Continuation of 1984 Refueling i

Outage i

4 4

I

8 e

3 4

I 2

Method:

Exlubit G-Instructions F
Forced Reason.

1-Manual for Preparation of Data 2

S: Scheduled A Equipment Failure (Explain)

Bataintenance oi Tes:

2-Manu21 Scram.

Entr> Sheets for Licensee

3. Automatic Ssram.

Event Report tLER) File tNUREG.

C. Refueling D. Regulator) Restriction 4.Oiher ( E xplain) 0161)

E-Operator Training & License E.samination 5

F-Administrative Exhibit I-Same Source G. Operational Er ror (Explaint tu!77)

II.Other (E xplain I m

O e

Northern States Power Company 414 fecollet Mall Minneapons. Minnesota 55401 Telephone (612) 330-5500 July 11, 1984 Director, Office of Resource Mar agement U S Nuclear Reguintory Commission Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLATE Dc;ket No. 50-263 License No. DPR-22 Monthly Operating Report June, 1984 Attached are twelve copies of the Monthly Operating Report for June, 1984 for the Monticello Nuclear Generating Plant.

d David Musoif Manager of Nuclear Support Services DMM/ dab cc: h gional Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector MPCA Attn: J W Ferman Attachment g$cgsbY CcTt d

4