r puhtic servlee company *e cdlende Va 16805 WCR 19 1/2, Platteville, Colorado 80651 October 2, 1984 Fort St. Vrain Unit #1 P-84394 T @20W2 %
3 Regional Administrator OCT - 5 s84 N lear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000
-- y Arlington, Texas 76011 ATTN: Mr. E. H. Johnson
SUBJECT:
PSC Response to Generic Letter 83-28
REFERENCE:
PSC Letter, Lee to Eisenhut, dated 11/4/83(P-83359)
Dear Mr. Collins:
In the above referenced letter, Public Service Company of Colorado (PSC) indicated that if the Nuclear Regulatory Commission (NRC) approved the Institute of Nuclear Power Operations sponsored Nuclear Utility Task Action Committee (NUTAC) position regarding Section 2.2.2 of Generic Letter 83-28 (vendor interface), the results of the NUTAC would be implemented, as applicable, at Fort St. Vrain.
PSC is currently preparing to implement many of the recommendations resulting from the NUTAC, but being unsure of the NRC final position with respect to the vendor interface issue, we are reluctant to proceed further until we can establish that additional efforts are justified.
On this basis, we are requesting information as to the status of this issue within the NRC and the likelihood of the NUTAC's position being approved.
i l
h
' 841016 0
27 y
$ gGAl l-P d
'? #
Y
l PSC feels.that the NUTAC position provides an effective and practical
-means forLaddressing the vendor. interface issue and ~that.
if
-previously, implemented,.could have pre'ented-the Salem ATWS event of v
1983. We would appreciate a statement, however' preliminary, as to.
the NRC's feeling about this subject.
-Sincerely, J. W. Gahm Manger, Nuclear Production Fort St. Vrain Nuclear-Generating Station