M:lling Addr:ss Alabama Power Company 600 North 18th Street Post Office Box 2641
. Birmingham Alabama 35291
~,
Telephone 205 783-6090 R. P. Mcdonald Senior Vice President Flintridge Building Mahama power t+ e 5 tr c'r' ev.T -
^ ^ ' '
October 10, 1984 Docket Nos. 50-348 50-364 Director, Nuclea-Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attention: Mr. S. A. Varga Joseph M. Farley Nuclear Plant (FNP) - Units 1 and 2 Licensing Items Requiring NRC Approval
' Gentlemen:
Attached for your information is an updated status of 1984 licensing items identified in Alabama Power Company's letter dated August 30, 1984. This attachment is tabulated chronologically by Alabama Power Company's requested NRC approval date. Alabama Power Company is ready to discuss modifications to this status to address all licensing issues.
During recent conversations with the NRC Project Manager, it was requested that critical outage-related licensing items be specifically identified in the attached licensing status.
Items 19, 21, 22, 23 and 29 have been so noted and the NRC staff is requested to act upon them by the date indicated, but no later than one month prior to the respective Unit's refueling outages which are scheduled to connence in January 1985 for Unit 2 and April 1985 for Unit 1.
Such scheduling provides sufficient time' for the procedural changes necessary to implement the approved License Amendments prior to each refueling outage.
It should be noted that the original intent of the licensing status letter mechanism was to identify, for NRC and Alabama Power Company scheduling purposes, the required approval dates. The above designated critical items have been submitted in accordance with the standard NRC review time requirements. During periodic discussions, Alabama Power Company has been advised that the NRC Staff has been working to meet the 8410160007 841010
\\
PDR ADOCK 05000348 p
PDR I1
Mr. S. A. Varga October 10, 1984 U. S. Nuclear Regulatory Commission Page 2
(
originally requested schedule.
Since several critical outage items have not been completed as requested, the licensing items have been re-prioritized in the attachment.
Originally, Item 27 of the attachment requested NRC approval of an
-administrative change to allow a portion of the auxiliary feedwater t
surveillance testing to be performed during power operation (vice during shutdown) by October 10, 1984. An unscheduled Unit 2 outage obviated the need for the October 10, 1984 approval date; however, approval is now required by January 17, 1985 to preclude a Unit 1 plant shutdown for
. the sole purpose of surveillance testing.
If you = have any questions, please advise.
Yours truly, ctg ?!
kl R. P. Mcdonald RPM /CJS:ddb-D16 Attachment-cc: Mr. L. B. Long Mr. J. P. O'Reilly Mr. E. A. Reeves Mr. W. H. Bradford n
4 j
,,4.,
y_,.
y>
..w m
_.y,,
...,-,-,,-n
,,y,,,w, r---
,.-f
,,,,,,cym,,,,,
,-o.,
r..,e~w
I ATTACHMENT PAGE 1 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SIEMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)
DATE DATE f
REMARKS 1.
Emergency 10-25-82 01-06-84 COMPLETE Preparedness Program Audit Onca Per 12 Months, FNP-1 and 2 2.
Administrative 04-06-83 01-09-84 COMPLETE Change to Footnote to T.S. Tabl e 3.3-3, FNP-1 and 2 3.
Administrative 12-10-82 01-10-84 COMPLETE Change to T.S.
Table 3.7-4a, FNP-2 4.
Change for 10-08-82 01-27-84 COMPLETE Turbine Valve Testing, FNP-1 and 2 5.
Correct Fire 08-26-83 02-09-84 COMPLETE Protection Technical Speci fications, FNP-1 and 2 6.
Admi nistrative 05-27-84 02-29-84 COMPLETE Change to Table 3.7-4a, FNP-1 7.
Correct Snubber 05-27-83 02-29-84 COMPLETE Listing, FNP-1 (T.S. Table 3.7-4) 8.
10CFR50.49 02-22-84 04-16-84 COMPLETE Environmental Qualification Schedule Extension Submittal, FNP-1
f ATTACMENT PAGE 2 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC StBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)
DATE DATE f
REMARKS 9.
License Condi-11-24-82 05-17-84 COMPLETE tion 2.C(17) 06-29-83 Containment 03-23-84 Mini-Purge, FNP-2 (T.S.
3.6.1.7) 10a. Mechanical 11-24-82 05-17-84 COMPLETE Snubber Listing, FNP-2 (T.S. Table 3.7-48) 10b. Containment 11-24-82 05-17-84 COMPLETE Penetration Overcurrent Protection, FNP-2 (T.S.
Table 3.8-1)
- 11. Movable Control 03-04-83 06-06-84 COMPLETE Rod Action 06-03-83 Statement, 07-28-83 FNP-1 and 2 10-10-83 (T.S. 3/4.1.3) 02-17-84 05-03-84 12a. River Water 12-30-82 06-07-84 COMPLETE System 06-20-83 Deletion, FNP 03-02-84 and 2 (T.S.
03-27-84 3/4.7.5 and 3/4.7.6) 12b. Diesel 08-03-82 06-07-84 COMPLETE Generator 12-30-82 Overload Test, 06-03-83 FNP-1 and 2 01-31-84 (T.S.
03-02-84 4.8.1.1.2.c.5) 03-27-84
- 13. Charcoal Filter 03-04-83 06-22-84 COMPLETE Surveillance, 03-01-84 FNP-1 and 2 (T.S. 4.7.7, 4.7.8 and 4.9.14)
I~
ATTACIMENT PAGE 3 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC StBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM _
DATE DATE(S)
DATE DATE f
REMARKS l
- 14. Reactor Head 12-12-83 09-12-84 COMPLETE Vent arid Other 0737 I". ems, G.L. 83-37, FNP-1 and 2 (Proposed T.S.
3/4.4.12 and existing T.S.
Table 3.3-6, 3.3-11 and 3/4.6.4) 15a. Change Monthly 03-01-84 09-21-84 COMPLETE Channel Calibration of Excore Neutron Detectors to Every 31 EFPD, FNP-1 and 2 (T.S. Tabl e 4.3-1) 15b. Correct 03-01-84 09-21-84 COMPLETE Facility Organization Chart, FNP-1 and 2 (T.S.
Figure 6.2-2) 15c. Correct Valve 03-01-84 09-21-84 COMPLETE Numbers Listed in T.S., FNP-1 and 2 (T.S.
Table 3.6-1)
- 16. Meteorological 03-02-84 07-08-84 54450 Tower 08-31-84 54451 Instrument 09-28-84 Surveillance, 10-19-84 FNP-1 and 2 (T.S. Tables 3.3-8 and 4.3-5)
I ATTACMENT PAGE 4 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC StBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)
DATE DATE f
REMARKS
- 17. Respirator 01-13-84 02-12-84 53468 Requested Iodine Filter 02-10-84 09-09-84 53469 prior to Exemption 02-13-84 09-14-84 next Request, FNP-1 03-05-84 10-30-84 outage and 2 05-08-84
- 18. Generic Letter 02-03-84 09-01-84 54235 83-43, 09-14-84 10-25-84 54236 Reporting 11-05-84 Requirements of 10CFR50.72 and 50.73, FNP-1 and 2 (T.S.
6.9.1.11,12,13) 19.
Increase Fuel 03-30-84 10-01-84 54672 Critical Enrichment 05-29-84 11-09-84 54673 outage Design Limit item for Reload Fuel and New Fuel Racks, FNP-1 and 2 (T.S.
5.3.1 and 5.6.1.2)
- 20. Administrative 05-14-84 11-12-84 55029 Change to 55030 Reflect Senior Vice President Change, FNP-1 and 2 (T.S.
6.1, 6.2, 6.5, 6.6, 6.7 and Figure 6.2.1)
- 21. RCS Pressure 04-10-84 10-06-84 48714 Critical
~---
Isolation Yalve 11-30-84 48715 outage Surveillance, item FNP-1 and 2 (T.S. 3/4.4.7.2 and 3/4.4.7.3) 22.
ISI Program 07-27-84 11-30-84 55496 Critical ASME XI outage Request, FNP-2 item
- 23. RWST and 06-01-84 11-30-84 55169 Critical Accumulator IST 55170 outage Justification, item FNP-1 and 2 (IST Program)
ATTACMENT PAGE 5 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SLBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)
DATE DATE REMARKS
- 24. Administrative 06-25-84 12-01-84 55412 Change to 09-24-84 55413 Reflect 2 Assistant Plant Managers, FNP 1 and 2 (T.S.
Figure 6.2-2)
- 25. Safety Related 05-03-83 11-03-83 51629 Battery 06-29-83 05-01-84 51631 Surveillance, 07-29-83 06-01-84 FNP-1 and 2 08-26-83 08-15-84 (T.S.3/4.8.2.3, 09-23-83 09-06-84 3/4.8.2.4 and 01-27-84 10-06-84 3/4.8.2.5) 09-06-84 12-07-84
- 26. Administrative 07-06-84 01-07-85 55409 Change to 55410 Remove Snubber Tables and Other Minor Changes, FNP-1 and 2 (T.S.
Tables 3.7-4a and b)
- 27. Admi nistrative 08-17-84 10-10-84 55609 Unit 1 Change to 01-17-85
- shutdown, Allow AFW for sole Surveillance purpose of to be surveillanc Performed
- testing, Ouring would be Operation, FNP required 19 1.and 2 (T.S.
no action is 4.7.1.2.2.b.1) taken.
-28.
Revised Heatup 04-20-84 03-01-85 54894 and Cooldown (FNP-1)
(FNP-1)
Curves Based on Reactor Vessel 02-10-84 02-10-85 54234 Material 06-18-84 (FNP-2)
Surveillance (FNP-2)
Program, FNP-1 and 2
f ATTACIMENT PAGE 6 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC StBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)
DATE DATE REMARKS 29.
ISI Program 08-16-84 03-01-85 Critical ASME XI outage Code Relief item Request, FNP-1
- 30. Schedular 06-18-82 To be Exemption to 07-27-82 deter-Appendix R 05-15-84 mined Al ternative 08-06-84 Shutdown Requirement, FNP-1 and 2
- 31. Technical 30 days To be Specification after deter-Optimization NRC mined Program, FNP-1 approval and 2 (T.S.
of 3/4.3) generic changes
- 32. Special Test Placed on Exception to hold by Eliminate APCo.
Excessive Flux Mapping During Startup After R.0., FNP-1 and 2 (T.S.--
3/4.10.2)
- 33. Chlorine Placed on Detection hold by Systems, FNP-1 APCo.
and 2 (T.S.
3.3.3.6)
- 34. RCP Breaker Placed on Position Trip hold by Deletion, FNP-1 APCo.
and 2 (T.S.
Table 3.3-1)