ARKANSAS POWER & LIGHT COMPANY A Arkansas Nuclear 0ne ,

UEfRECb'RDOFCHANCESANDREVISIONS / FOM NO. 1000.06A EMEPGENCY PLAh tROCEDURE i iREV. f12 FC f

( Ag*' l Safety Related YES N NO O 4 DUTIES OF THE EMERGENCY EVACUATION It.id!

@.4 1903.40. ev. ,4 5 N PAGE REV PC#

llN nantmliet 5AbE REV PC# PAGE REV PC#

@RPAGE EV PC#

  1. /o7 PAGE REV PC#

1 4 2 4 3 4 4 4 O .

8407240374 030620 '

fDRADOCK 00000333 PDR I i APPROVED BY:

APPROVAL DATE J

M'Ykr od, A M/. 4 ' ,

t

{- 2] *(2 REQUIRED EFFECTIVE DATE:

(GenerafManager) e.r '

i PLANT MANUAL SECTCN: PROCEDURE / WORK PLAN TITLE: NO:

EMERGENCY PLAN )UTIES OF THE EMERGENCY PROCEDURE EVACUATION TEAM 1903.40

,s PAGE 1 of 4

\_ /

i ARKANSAS NUCLEAR ONE aEvision 4 CHANGE o*TE os/27es, DATE 1.0 PURPOSE The purpose of this procedure is to provide guidance on the responsibilities ano duties of the Emergency Evacuation Team for emergency situations.

2.0 SCOPE This procedure is applicable to emergency situations involving Unit one and/or Unit Two.

3.0 REFERENCES

3.1 References Used in Procedure Preparation:

3.1.1 Arkansas Nuclear One Emergency Plan 3.2 References Used in Conjuction with this Procedure:

3.2.1 1903.10, " Emergency Action Level Response" 3.2.2 1903.30, " Plant Evacuation" 3.2.3 1903.31. " Exclusion Area Evacuation" 3.3 Related ANO Proce.dures:

3.3.1 1903.71, " Pope County Sheriff's Department" 4.0 DEFINITIONS 4.1 Exclusion Area Evacue' on - The orderly withdrawal of personnel from that portion cf u.e Exclusion Area that could receive 0.5 Rem whole body dose or 1.0 Rem child thyroid dose over a period of twelve months as a result of the incident.

4.2 Plant Evacuation - The orderly withdrawal of all personnel from the protected area except those personnel required to respond to the situation.

4.3 operational Support Center (OSC) - The ANO Administration Building the Emergency Evacuation Team (Materials Managtment) assembly area should be the old guard houso [the Training personnel may asse,mble ct the secondary OSC (Emergency Control Center)].

,3, .

t

PLANT M ANUAL SECTION: PROCEDURE, WORK PLAN TITLE: NO:

EMERGENCY PLAN DUTIES OF THE EMERGENCY PROCEDURE EVACUATION TEAM 1903.40 3

PAGE 2 of 4 i\> ARKANSAS NUCLEAR ONE aEvisioN 4 CHANGE oAre Os/27/83 DATE 5.0 RESPONSIBILITIES 5.1 The Emervency Evacuation Team Leader is responsible for coordinating the evacuation of plant personnel in the event of an Exclusion Area Evacuation and directing the Emergency Evacuation Team in assisting security personnel during other emergencies such as a Plant Evacuation.

5.1.1 The Evacuation Team Leader is responsible for the initial and continued accountability of team members.

5.1.2 The Emergency Evacuation Team Leader is also responsible for performing quarterly phone number verifications of team members per Form 1072.004B (to be provided by the Emergency Planning Coordinators).

5.2 The Emergency Evacuation Alternate Team Leader is responsible for as-sisting in coordinating the evacuation of personnel as directed by the Emergency Evacuation Team Leader. If the designated Team Leader is not available to respond, then an Alternate Team Leader should assume the responsibilities of the Team Leader.

5.3 The Emergency Evacuation Team is responsible for assisting Security

/~' personnel in the evacuation of personnel as requested by the Duty Guard

( )T , Ser eant/ Security Coordinator and responding to Emergency Action Levels as described in this procedure.

NOTE: The first Emergency Evacuation Team member to respond shall assume the dutiet of the Emergency Evacuation Team Leader until relieved by the designated team leader or alternate. -

6.0 NOTIFICATIONS 6.1 During routine work hours, the Emergency Evacuation Team personnel on-site should be contacted by the most expedient means available.

6.2 After routine work hours, Evacuation Team personnel may be contacted as follows:

6.2.1 Refer to the roster / call list contained in Attachment 2, 1903.10, " Emergency Action Level Response."

6.2.2 Contact a Team Leader / Alternate Team Leader.

6.2.3 Provide the individual contacted with appropriate informa-tion and request them to ensure that contact is attempted with the remaining team personnel, as needed.

PROCEDURElWORK PLAN TITLE: NO:

PLANT M ANUAL SEC'lON:

EMERGENCY PLAN DUTIES OF THE EMERGENCY PROCEDURE EVACUATION TEAM 1903.40 PAGE 3 of 4 aatE Os/27,83 9 ARKANSAS NUCLEAR ONE aEvisioN 4 CHANGE DATE 6.3 The following information should be provided to the notified p'ersonnel as indicated:

6.3.1 If team personnel are to respond to an Emergency Action

. Level (EAL) that may or may not involve an evacuation, they should be provided the following information, as known:

A. Affected unit.

B. EAL declared.

C. Immediate response required.

D. Other information, as the situation dictates.

7.0 EVACUATION INSTRUCTIONS 7.1 If an immediate response is required, the Emergency Evacuation Team should take the following actions:

7.1.1 The Emergency Evacuation Team shall report to the appro-priate assembly area. The Team Leader shall expeditiously account for his team member and provide the results to the l Technical Support Center *(Ext. EqlERf giving names and badge numbers of all accounted for team members.

7.1.2 The Emergency Evacuation Team should respond as requested by the Duty Guard Sergeant / Site Security coordinator.

7.1.3 Evacuation activities should be performed in accordance with the following procedures:

A. 1903.30, " Plant Evacuation" B. 1903.31, " Exclusion Area Evacuation" 7.1.5 After the initial team response, the Emergency Evacuation Team should report as directed by the Duty Emergency Co-ordinator/ Site Security Coordinator.

8.0 EMERGENCY ACTION LEVEL (EAL) RESPONSE GUIDELINES 8.1 Unusual Event No action is required by the Emergency Evacuation Team unless the situation dictates the need for an evacuation. In that case, refer to Section 7.0 of this procedure.

lThematerialcontainedwithinthesymbols(*)isproprietaryorprivateinfor-O~ mation.

, -, .. - .. -- . . . . . . . . . ., .. -- . - . -. - - , . - .- m. .- - . . _ -

e PLANT MANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

E!!ERGENCY PLAN DUTIES OF THE E!!ERGENCY PROCEDURE EVACUATION TEAff 1903.40

,-~s PAGE 4 of 4 N-'

1 ARKANSAS NUCLEAR ONE aevision 4 CHANGE oATE os/27/83 DATE 8.2 Alert If the emergency situation does not require an evacuation, the Evacuation Team personnel shall be placed on " standby status" as long as the Alert EAL is effective.

8.2.1 Notifications should be made in accordance with Section 6.0 of this procedure.

8.2.2 When on-site, the team leader should report to the Duty Emergency coordinator to obtain further instructions, as necessary.

8.3 Site Emergency / General Emergency NOTE: The transition from an Alert to a Site / General Emergency acti-vates the long-term Emergency Response Organization. Upca ar-rival onsite and an appropriate turnover from the Duty Emergency Coordinator, the site Security coordinator will coordinate the activities of the security / Emergency Evacuation Team personnel.

If the emergency situation does not involve an evacuation, the following

/) actions should be taken:

V 8.3.1 Notificatioas should be made in accordance with Section 6.0 of this procedure.

8.3.2 The Emergency Evacuation Team personnel shall report to their respective assembly area, provide team accountability -

results to the Site Security Coordinator and avait further instructions.

9.0 ATTACH!!E!!TS AND FORf!S None

,, ~~ .

I i 1 -'

I .

ARKANSAS POWER & LIGHT COMPANY q

b

h2CORDOFCHANGESANDREVISIONS 1000.06A EMERGEllCY'PLAlfsPROCEDURE REV. I12 PC f f N ()# Safety Related YES VNO O DUTIES OF THE EMERGEt1CY FIRE TE m

  • .A 1903.41- REV.4

.) ] i 4

l$,,, fbj .i bibb d YfkCE REV PC# M5kV PC# PAGE REV PC0 PAGE REV PC# PAGE REV PC#

1 4 2 4 3 4 4 4 l

- '!M@m-el,2#xu

~

3 REaufx,~ottfEC1?vEorE 1Gpneralganager)

)

l

t s . .

PLANT M ANUAL SECTION: PnOCE0unEMonK PLAN TITLE: NO; E!!ERGE!1CY Pt.AN DUTIES OF THE EftERGENCY FIRE TEAM 1902.41

.m PAGE 1 of 4 ARKANSAS NUCLEAR ONE Esion CHANGE 4 oAre os/27/s, oATE 1.0 PURPOSE The purpose of this procedure is to provide guidance on the responsibilites and duties of the Emergency Fire Team for emergency situations.

2.0 SCOPE This procedure is applicable to emergency situations involving Unit one and/or Unit Two.

3.0 REFEREllCES 3.1 References Used in Procedure Preparation:

3.1.1 Arkansas fluelear One Emergency Plan 3.2 References to be Used in conjunction with this Procedurei 1.2.1 1903.10. " Emergency Action Lever Response" 3.2.2 1903.22. " Fire or Explosion" p 3.2.3 1903.70, "Russellville Fire Department" r  !

3.3 Related Allo Proceduress l

tione 4.0 DEFIllIT!0fl3 4.1 Operational Suppor cinter (OSC) - The Allo Administration Du11 dings the Emergency Fire Team assembly area should be the 2r.J floor con-ference room.

4.2 Fire Locker - A compilation of fire-fighting equi,went located in the genet.nl vicinity of thee (1) Fire Locker As Unit 1 Titrbine fluilding.

Ele /a th.: 354', south ends (2) Fire Locker he hit 2 Turbine Duilding.

Elevation 354'. florth ends (3) Fire Locker Cs Unit 1 Turbine Building.

Elevation 386', naar the Control Rooms.

5.0 RESPO!!3!DILITIES 5.1 The Errergency Fire Team Leader is responsible for coordinating fire fighting efforts required to control and extinguish the fire once he arrives on site.

5.1.1 The Fire Team Leader is responsible for the initial and continued accountability of team personnel. .

i

  • PLANT M ANUAL SECTION. PROCEDURE / WORK PLAN TITLE: NO:

EMERGEllCY PLAN ?UTIES OF THE Ft1EROF!!CY FIRE TEAtt 1403.41 PAoE 2 of 4

_.,/

ARKANSAS NUCLEAR ONE :aivision 4 CHANot oar = Os/27/83 DATE 5.1.2 The Fire Team Leader is also responsible for performing quarterly phone number verifications of team members per Form 1072.004D (to be provided by the Emergency Planning Coordinators).

5.2 The Emergency Fire Alternate Team Lesder is responsible for assist-ing in coordinating fire fighting efforts. as necessary. If the des-ignated Team Leader is not available then an Alternate Team Leader should assume the responsibilites of the Team Leader.

5.3 The Emergency Fire Team is responsible for fighting fires within the plant boundary and responding to Emergency Action Levels as described in this procedure.

NOTE: The first Fire Team member at the scene of the fire shall assume the dutias or the Emergency Fire Team Leader until relieved by the designated team leader or alternate.

6.0 NOTIFICAT10!13 6.1 During routine work hours. the Emergency Fire Team personnel sn site should be contacted by the most expedient means available, g) i 6.2 After routine work hours, the Emergency Fire Team personnel may be contact 1d as follows:

6.2.1 Refer to one of the following roster / call list contained in the indicateo procedures as necessary.

A. Attachment 3, 1903.10, " Emergency Action Level Response"

8. Attachment 1, 1903.22, " Fire or Explosion" 6.2.2 Contact a Team Leader / Alternate Team Leader.

6.2.3 Prsvide the individual contacted with appropriate informa-tion and request them to ensure that contact is attempted with the remaining team personnel, as needed.

6.3 The following information should be provided to the notified Emergency Fire Team personnel as indicated 6.3.1 If team personnel are to respond to a fire that does not involve an Emergency Action Level, they should be pro 0Tded with the locstion and type of the fire, as known.

6.3.2 If team personnel are to respond to an Emergency Action Level that may or may not involve a fire, they should be .

provided the following information, as knowns

PLANT MANUAL SECTION: PROCEDURE 1 WORK PLAN TITLE: NO:

EMERGENCY PLAN 3UTIES OF THE EMERGENCY FIRE TEAM 1903.41 PAGE 3 of +

C; ARKANSAS NUCLEAR ONE -aEvision 4 oATE Os/27/83

\ s/ CHANGE DATE A. Affected unit.

B. TAL declared.

.C. Immediate response required.

D. Othe.r information, as the situation dictates.

7.0 FIRE FIGHTING INSTRUCTIONS 7.1 If an immediate response is required, the Emergency Fire Team should take the following actions:

NOTE: Emergency hand-held radies may be obtained from the Main Guard Station upon request.

7.1.1 Equipment should be obtained from the appropriate fire locker, if necessary.

7.1.2 Fire Team personnel should then respond to the scene of the emergency, unless otherwise instructed.

)

s ,/

7.1.3 The Emergency Fire Team Leader should take over the duties of the Fire Brigade Leader and coordinate the fire fighting efforts of the Emergency Fire Team.

7.1.4 The Emergency Fire Team should respond to fires in accord-ance with the following procedures:

A. 1903.22, " Fire or Explosion" B. 1903.70, "Russellville Fire Department" 7.1.5 The team leader should provide an assessment of the situa-tion to the Shift Supervisor / Duty Emergency Coordinator.

7.1.6 After the initial team response, the Emergency Fire Team should report as directed by the Shift Supervisor / Duty Emergency Coordinator. ,

8.0 EMERGENCY ACTION LEVEL (EAL) RESPONSE GUIDELINES 8.1 Unusual Event No action is required by the Emergency Fire Team unless the unusual event is declared as a result of a fire. In that case, refer to l Section 7.0 of this procedure.

r"'S N

1

PLANT MANUAL SECTION: PROCEDURE / WORK PLAN TITLE: ND:

EMERGENCY PLAN DUTIES OF THE EMERGENCY FIRE TEAM 1903.41 PAGE 4 of 4 r

j C

ARKANSAS NUCLEAR ONE ae-a 4 CHANGE o^ra Os/27783 DATE 8.2 Alert If the emergency situation does not involve a fire, the Emergency Fire Team personnel shall be placed on a " standby status" as long as the Alert EAL is in effect.

8.2.1 Notifications shculd be made in accordance with Section 6.0 of this procedure.

8.2.2 When on-site, the team leader should report to the Duty Emergency Coordinator to obtain further instructions, as necessary.

8.3 Site Emergency / General Emergency NOTE: The transition from an Alert to a Site / General Emergency acti-vates the long-term Emergency Response Organization. Upon ar-rival on-site and an appropriate turnover from the Duty Emergency Coordinator, the Emergency Services Coordinator will coordinate the actions of the on-site fire response personnel.

If the emergency situation does not involve a fire, the following m actions should be taken:

8.3.1 Notifications should be made in accordance with Section 6.0 of this procedure.

8.3.2 The Emergency Fire Team personnel shall report to the as-signed assembly area. The Team Leader shall expeditiously account for the team members and report the results to the Technical Support Center *(Ext. M)* giving the names and l badge numbers of all accounted for team members. The team shall then await further instructions.

9.0 ATTACHMENTS AND FORMS None l

The information contained within the symbols (*) is proprietary or private in-formation.

C'\

V i

1

ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One FOW NO. 1000.06A N RECOR'D OF CHANGES AND REVISIONS EMERGENCY PLAN-ERDCEDURE REV. #12_ PC f

.  %' Safety Related YES JKNO O DUTIES OF THE EMERGENCY MEDICAL T:.idt I 1903.42 REV. 5 .."

    • g -]

, , 1, .ej l'h

- M

. ,i h . .. '

t

. ',] '. ] ,-

1

'PA REV PC# PAGE REV PC# PAGE REV PC# PAGE 'REV PC# PAGE REV PC#

1 5 2 5 3 5 4 5 5 5 O

l l

l APPROVED BY: APPROVAL DATE l w 0 h ] " T 3 pm 2//df REQUIRED EFFECTIVE DATE:

O . Gbaarfl' Manager)

(  ;

I

l PLANT MANUAL SECTION: PROCEDURElWORK PLAN TITLE: NO:

DUTIES OF THE EMERGENCY FMFRCFMcV DT.AM MFDTPAT TP Asf inn 3_,g

()fs PAGE i mr c N-ARKANSAS NUCLEAR ONE aavision ~ <~ o^re CHANGE ~ DATE

<,,,,e, 1

l l

1.0 PURPOSE The purpose of this procedure is to provide guidance on the responsibili-ties and duties of the Emergency Medical Team for emergency situations.

2.0 SCOPE This procedure is applicable to personnel emergency situations involving Unit One and/or Unit Two.

3.0 REFERENCES

3.1 References Used in Procedure Preparation:

3.1.1 Arkansas Nuclear One Emergency Plan 3.2 References Used in Conjunction with this Procedure:

3.2.1 1903.10, " Emergency Action Level Response" 3.2.2 1903.23, " Personnel Emergency" 3.2.3 1903.72, "St. Mary's Hospital"

{u J'h 3.2.4 1903.73, "Millard-Henry Clinic" 3.2.5 1903.74, " Pope County Ambulance Service" 3.3 Related ANO Procedures:

3.3.1 1903.22, " Fire and Explosion" 3.3.2 1903.60, " Emergency Supplies and Equipment" 3.4 Regulatory correspondence containing NRC commitments which are imple-mented in this procedure include:

3.4.1 Letter 0CAN108213, Appendix A, Item 1 A. Section 5.4 4.0 DEFINITIbNS 4.1 Operational Support Center (OSC) - The ANO Administration Building; the Emergency Medical Team assembly area should be the First Aid Room (Admin. Bldg. - 2nd floor) and the 2nd floor breakroom.

7s 4.2 Medical Kits - A compilation of first aid supplies located in the

(

\~') four following places: (1) First Aid Room, (2) Fire Locker A (Unit 1 Turbine Building, Elev. 354', South end), (3) Fire Locker B (Unit 2 Turbine B.uilding, Elev. 354', North End), and (4) Fire Locker C (Unit 1/2 Turbine Building, Elev. 386', Near the Control Rooms).

l PtANT MANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

. DUTIES OF THE EMERGENCY )'

FMFRr,rMcV PTAM MFDTCAT TFAM 1901.47 PAGE 2 nf 5 O

(j ARKANSAS NUCLEAR ONE aavimoa CHANGE a care DATE sme 5.0 RESPONSIBILITIES 5.1 The Emergency Medical Team Leader is responsible for coordinating l emergency medical response efforts, as necessary, once he arrives on site and for responding to Emergency Action Levels as described in this procedure.

5.1.1 The Medical Team Leader is responsible for the initial and con-tinued accountability of team personnel.

5.1.2 The Emergency Medical Team Leader is also responsible for per-forming quarterly phone number verifications of team members per Form 1072.004B (to be provided by the Emergency Planning Coordi-nators).

5.2 The Emergency Medical Alternate Team Leader is responsible for as-sisting in coordinating emergency medical response efforts. If the designated Team .eader is not available then an Alternate Team Leader should assume the responsibilities of the Team Leader.

5.3 The Emergency Medical Team is responsible for performing the follow-ing functions under the direction of the Emergency Medical Team Leader and for responding to Emergency Action Levels as described in O, this procedure:

NOTE: The first Eme:gency Medical Team member at the scene of a medical emergency shall assume the cuties wf the Emergency Medical Team Leader until relieved by the designated team leader or alternate.

5.3.1 Providing emergency first aid and decontamination of injured persons.

5.3.2 Performing, in conjunction with the Emergency Radiation Team, onsite rescue operations.

5.4 The Shift Maintenance Medical Team shall assume the responsibilities of the Emergency Medical Team during non-routine work hours. They will not respond to medical emergencies during routine work hours unless specifically requested to do so.

~~., 1 t ) l

\J l

~

PLANT MANUAL SECTION: PROCEDURElWORK PLAN TITLE: NO:

DUTIES OF THE EMERGENCY EMERGENCY PLAN MEDICAL TEAM 1903.42 PAGE 3 of 5

(,,,') ARKANSAS NUCLEAR ONE aevisioa s o^te s/27/83 N/ CHANGE DATE 6.0 NOTIFICATIONS 6.1 During routine work hours, the Emergency Medical Team personnel on-site should be contacted by the most expedient means available.

6.2 After routine work hours, the Shift Maintenance Medical Team may be contacted by the most expedient means available, i.e. ext. 3142/3411

~

and plant paging system. In the event that additional support is needed by the Shift Maintenance Medical Team, the Emergency Medical Team may be contacted as follows:

6.2.1 Refer to the roster / call list contained in Attachment 4, 1903.10, " Emergency Action Level Response".

6.2.2 Contact a Team Leader / Alternate Team Leader.

6.2.3 Provide the individual contacted with appropriate informa-tion and request them t.' ensure that contact is attempted with the remaining team personnel, as needed.

6.3 The following information should be provided to the notified Emergency Medical Team personnel as indicated:

()

( ,/ 6.3.1 If team personnel are to respond to a medical emergency that does not involve an Emergency Action Level, they should be provided with the location and type of the medi-cal emergency, as known.

6.3.2 If team personnel are to respond to an Emergency Action level that may or may not involve a medical emergency, they should be provided the following information, as known:

A. Affected unit.

B. EAL declared.

C. Immediate response required.

D. Other information, as the situation dictates.

7.0 MEDICAL RESPONSE INSTRUCTIONS 7.1 If an immediate response is required, the Emergency Medical Team should take the following actions:

NOTE: Emergency hond-held radios may be obtained from the Main Guard Station upon request. .

I v

PLANT MANUAL SECTION: PROCEDUREN/ORK PLAN TITLE: NO:

DUTIES OF THE EMERGENCY EMERGENCY PLAN '!EDICAL TEAM 1903.42 PAGE 4 of s

()

C ARKANSAS NUCLEAR ONE aavisiON s CHANGE oaTE DATE s/27/83 1 7.1.1 Equipment should be obtained from the appropriate medical kit, if necessary.

7.1.2 Medical Team personnel should then respond to the scene of the emergency, unless otherwise instructed.

NOTE: If necessary, directions to the scene of the emergency (or an escort) may be obtained from the appropriate control room (preferably contact the control room which was re-sponsible for making the emergency announcement over the PA system).

Unit 1 Control Room 3101, 3102 Unit 2 Control Room 3201, 3202 7.1.3 The Emergency Medical Team should respond to emergencies in accordance with the following procedures.

A. 1903.23, " Personnel Emergency" B. 1903.72, "St. Mary's Hospital" C. 1903.73, "Millard-Henry Clinic" D. 1903.74, " Pope County Ambulance Service" 7.1.4 The team leader should provide an assessment of the situa-tion to the Shift Supervisor / Duty Emergency Coordinator.

7.1.5 After the initial team response, the Emergency Medical Team should report as directed by the Shift Supervisor / Duty Emergency Coordinator.

8.0 EMERGENCY ACTION LEVEL (EAL) RESPONSE GUIDELINES 8.1 Unusual Event No action is required by the Emergency Medical Team unless the un-usual event is declared as a result of a medical emergency. In that case, refer to Section 7.0 of this procedure.

8.2 Alert If the emergency situation does not involve a medical emergency, the Emergency Medical Team personnel shall be placed on a " standby sta-tus" as long as the Alert EAL is in effect.

8.2.1 Notifications should be made in accordance with Section 6.0 O

of this procedure.

L._,'

4

b PLANT MANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

DUfIES OF THE EMERGENCY EMERGENCY PLAN b!EDICAL TEAM 1903.42

()

'V ARKANSAS NUCLEAR ONE PAGE CHANGE 5 of 5 aEvisioN s DArE DATE s/27/83 8.2.2 When on-site, the team leader should report to the Duty Emergency Coordinator to obtain further instre-tions, as necessary.

8.3 Site Emergency / General Emergency NOTE: The transition from an Alert to a Site / General Emergency acti-vates the long-term Emergency Response Organization. Upon ar-rival on-site and an appropriate turnover from the Duty Emer-gency Coordinator, the Emergency Services Coordinator will co-ordinate the actions of the on-site medical response personnel.

If the emergency situation does not involve a medical emergency, the Emergency Medical Team personnel shall report to the First Aid Room /

Break Room Area (2nd floor - Admin. Bldg.) unless otherwise directed.

The Team Leader shall expeditiously account for the team members and report the results to the Technical Support Center * (Ext.1EEElb

  • giving the names and badge numbers of all accounted for team members.

The team shall then await further instructions.

9.0 ATTACHMENTS AND FORMS None

{s The information contained within the symbols (*) is proprietary or private infor-mation.

I'

(-,

i

%J

ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One N RECO D OF CHANGES AND REVISIONS 1000. 6A EMERGENCY PLAN

  • PROCEDURE REV. #12 PC #

Safety Related YES W NO O

' ' MY ' - #

C -

DUTIES OF THE EMERGENCY RADIATION :.tidi

\ s PAGE REV PC# EAGE REV PC# PAGE REV PC# PAGE REV PC# PAGE REV PC#

1 6 2 6 3 6 4 6 5 6 6 6 7 6 8 6 9 6 i

APPROVED BY: APPROVAL DATE g _g g[ ,{ REQUIRE E FECT DTTE:

, / (Genera Manager)

PLANT MANUAL SE CTION: PROCEDURElWORK PLAN TITLE: NO:

EMERGENCY PLAN DUTIES OF THE EMERGENCY PROCEDURE RADIATION TEAM 1903.43 PAGE 1 of 9 (7

(_) ARKANSAS NUCLEAR ONE aevision s CHANGE oare s/27esa DATE 1.0 PURPOSE The purpose of this procedure is to provide guidance on the responsibili-ties and duties of the Emergency Radiation Team for emergency situations.

2.0 SCOPE This procedure is applicable to emergency situations involving Unit one and/or Unit Two.

3.0 REFERENCES

3.1 References Used in Procedure Preparation:

3.1.1 Arkansas Nuclear One Emergency Plan 3.2 References Used in conjunction with this Procedure:

3.2.1 1903.10, " Emergency Action Level Response" 3.3 Related ANO Procedures:

w 3.3.1 1903.30, " Plant Evacuation"

\

(O 3.3.2 1903.60, " Emergency Supplies and Equipment" 3.3.3 1904.02, "Offsite Dose Projection Procedures" 3.3.4 1904.03, " Aux. Bldg. Ventilation Exhaust Emergency Radia-tion Monitor" 4.0 DEFINITIONS 4.1 Operational Support Center (OSC) - The ANO Administration Building; the Emergency Radiation Team assembly area should initially be the First Floor Maintenance Coordinator office area. [Upon team assign-ments being made, the On-site Radiological Monitoring Section should continue to operate from this location (unless otherwise instructed);

the Offsite Radiological Monitoring Section should operate from the Emergency Control Center (Technical Analysis Classroom)).

4.2 Emergency Kit - A compilation of supplies and equipment for deter-mination of radiological hazards; these kits are located in the general vicinity of the (1) Unit 1 Control Room, (2) Maintenance Coordinator Office Area (First Floor, Admin. Bldg.) (3) Emergency Control Center (1st Floor), and (4) St. Mary's Hospital (Emergency Room).

/

v]

s l

s l

  • l PLANT MANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

EMERGENCY PLAN DUTIES OF THE EMERGENCY PROCEDURE RADIATION TEAM 1903.43 PAGE 2 of 9

(,_') ARKANSAS NUCLEAR ONE aEvision s o*TE s/27/82

'u CHANGE DATE 5.0 RESPONSIBILITIES 5.1 The Emergency Radiation Team Leader is responsible for coordinating {

the efforts to determine radiological hazards and for responding to )

Emergency. Action Levels as described in this procedure. j 1

5.1.1 The Radiation Team Leader is responsible for the initial

~

and continued accountability of team personnel.

5.1.2 The Emergency Radiation Team Leader is also responsible for performing quarterly phone number verifications of team members per Form 1072.004B (to be provided by the Emergency Planning Coordinators).

5.2 The Emergency Radiation Alternate Team Leaders are responsible for assisting in coordinating the efforts to determine radiological hazards. If the designated Team Leader is not available, then an Alternate Team Leader should assume the responsibilities of the Team Leader.

5.3 The Emergency Radiation Team is responsible for the following areas, as indicated:

b) g, NOTE: The first Emergency Radiation Team member that responds shall assume the duties of the Emergency Radiation Team Leader until relieved by the designated team leader or alternate.

5.3.1 The Onsite Radiological Monitoring Section is responsible for:

A. Determining onsite radiological hazards, conducting radiological surveys, monitoring and sampling.

B. Performing, in conjunction with the Emergency Medical Team, onsite rescue operations.

C. Making initial and subsequent re-entries into plant areas that present a radiological hazard, as required.

5.3.2 The Offsite Radiological Monitoring Section is responsible for:

A. Determining off-site radiological hazards.

B. Conducting required off-site surveys, monitoring, and i sampling.

r <

k.

PLANT MANUAL SECTION: PROCEDURETWORK PLAN TITLE: NO:

EMERGENCY PLAN DUTIES OF THE EMERGENCY PROCEDURE RADIATION TEAM 1903.43

~_ PAGE 3 of 9 l

/ i ARKANSAS NUCLEAR ONE aevisiOn 6 o*TE s/27783 CHANGE DATE 6.0 NOTIFICATIONS 6.1 During routine work hours, the Emergency Radiation Team personnel on-site should be contacted by the most expedient means available.

6.2 After routine work hours, the Emergency Radiation Team personnel may be contacted as follows:

6.2.1 Refer to the roster / call list contained in Attachment 5 -

1903.10, " Emergency Action Level Response" as necessary.

6.2.2 Contact a Team Leader / Alternate Team Leader.

6.2.3 Provide the individual contacted with appropriate informa-tion and request them to ensure that contact is attempted with the reaaining team personnel, as needed.

6.3 The fol}owing information should be provided to the notified Radia-tion Tet. personnel as indicated:

6.3.1 If team personnel are to respond to an Emergency Action Level that may or may not involve a radiological emergency,

~~N they should be provided the following information, as known:

(d A. Affected unit.

B. EAL declared.

C. Immediate response required.

D. Other information, as the situation dictates.

7.0 RADIOLOGICAL RESPONSE INSTRUCTIONS 7.1 If an immediate response is required, the Emergency Radiation Team should take the following actions:

7.1.1 Notified team personnel should report to their designated initial assembly area in the operational Support Center.

7.1.2 The team leader shall ascign personnel to the following sections (including designation of section leaders, as needed) to perform the indicated actions:

A. Onsite Radiological Monitoring Section (performs ini-tial surveys, sampling, and posting of applicable on-site areas and accompanies other emergency response teams during initial entry and subsequent re-entries, ,

as required).

[/)

x_,

e .

1 W  !

PLANT MANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

EMERGENCY PLAN DUTIES OF THE EMERGENCY PROCEDURE RADIAT10N TEAM 1903.43 PAGE 4 of 9 1

(_/')

N-ARKANSAS NUCLEAR ONE aevision e CHANGE oATE DATE s/27/83 l B. Offsite Radiological Monitoring Section (performs ini- )

tial surveys, sampling, and posting of applicable off-site areas, assists in collection of appropriate en-vironmental samples and assists, as directed, the Arkansas Department of Health Radiological Response Team).

NOTE: Emergency hand-held radios may be obtained from the Main Guard Station upon request.

NOTE: The following vehicles are available for use by the Offsite Radiological Monitoring Section (keys are available at the Main Guard Station as neces-sary):

1. Dedicated One vehicle is dedicated for initial offsite response. (It is normally restricted to being within 15 minutes of site and can be recalled by radio (or other means). This may include

~w but is not necessarily limited to a four-wheel drive vehicle.

(b s

2. Available Any AP&L vehicle .. site is available for use.

(Hand-held radios are available for the ve-hicles which are not radio-equipped.)

7.1.3 Each section should then report to their designated assem-bly area (as indicated in Section 4.0) to make ready the appropriate emergency kit equipment, as necessary.

7.1.4 If not previously done, the team leader should contact the apptapriate person in the current chain of command, per Attachment 1, to determine the current radiological re-sponse needs.

7.1.5 The Emergency Radiation Team should respond, as directed, to radiological incidents in accordance with the following emergency procedures, as cppropriate:

NOTE: Activation of the Emergency Plan does not supercede the use of routine Eealth Physics procedures unless it is speci-fically stated so. Therefore, the guidance contained in the 1600/2600 series Technical Analysis Procedures should n be followed. .

U

I PLANT MANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

EMERGENCY PLAN DUTIES OF THE EMERGENCY PROCEDURE . RADIATION TEAM 1903.43 PAGE 5 of 9 (N-- '

,m ARKANSAS NUCLEAR ONE aevision e CHANGE o*Ts DATE s/27f83 A. 1903.30, " Plant Evacuation" B. 1903.33, "Re-entry Guidelines" C. 1903.76, " Arkansas Department of Health" D. 1904.02, "Offsite Dose Prcjection" 7.1.6 The team leader should provide a periodic update of the team's status to the appropriate individual, per Attach-ment 1.

7.1.7 After the initial team response, the Emergency Radiation Team should report as directed by the appropriate indi-vidual, per Attachment 1.

8.0 EMERGENCY ACTION LEVEL (EAL) RESPONSE GUr.ELINES 8.1 Unusual Event No action is required by the Emergency Radiation Team unless the Un-usual Event is declared as a result of a radiological incident. In

N that case, refer to Section 7.0.

(G 8.2 Alert If the emergency does not involve a radiological incident, the Emer-gency Radiation Team personnel shall be placed on " standby status" as long as the Alert EAL is in effect.

8.2.1 Notifications should be made in accordance with Section 6.0 of this procedure.

8.2.2 When onsite, the team leader should report to the Duty Emergency Coordinator to obtain further instructions, as necessary.

1 3.3 Site Emergency / General Emergency NOTE: The transition from an Alert to a Site / General Emergency acti-vates the long-term Emergency Response Organization. Upon cr-rival on-site and an appropriate turnover from the Duty Emer-gency coordinator, the following individuals will coordinate the actions of the indicrted sections of the Emergency Radiation Team A. Onsite Monitoring & HP Supervisor (Onsite Radiological Monitoring Section) .

9 ,

e PLANT MANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

EMERGENCY PLAN DUTIES OF THE EMERGENCY PROCEDURE RADIATION TEAM 1903.43 PAGE 6 of 9

(_ ARKANSAS NUCLEAR ONE aEvisioN 6 oATE s/27/83

\~- CHANGE DATE B. Offsite Monitoring Supervisor (Offsite Radiological Moni-toring Section) 8.3.1 Notifications should be made in accordance with Section 6.0 of this procedure.

8.3.2 If the emergency situation does not involve a radiological incident, the notified Emergency Radiation Team personnel shall report to their designated assembly area. The Team Leader shall expediticusly account for the team members and report the results to the Technical Support Center *(Ext.

M

  • giving the names and badge numbers of the accounted for team members.

9.0 ATIACHMENTS AND FORMS 9.1 Attachment 1 - EAL Organizational Structure 9.2 Attachment 2 - Checklist (Team Leader)

G f )

\_/

The material contained within the symbols (*) is proprietary or private infor-mation.

[s__-)

1

+

PLANT MANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

EMERGENCY PLAN DUTIES OF THE EMERGENCY PROCEDURE RADIATION TEAM 1903.43 PAGE 7 of 9

7) ARKANSAS NUCLEAR ONE aevision e CHANGE o^re DATE s/27/83 ATTACHMENT 1 EAL ORGANIZATIONAL STRUCTURE A. Initial Response Organization (Unusual Event, Alert EAL's, unless otherwise indicated).

l DEC l l

l I l Shift l l Emer. l l Supervisor l l Radiation l l l Team l l l Leader I l Operations l l l Staff l l l l l Onsite l l Offsite  !

l Rad. Monit.l l Rad. Monit.l

" l Sect. l l Sect. l (s%

, B. Emergency Response Organization (Site / General Emergency EAL's, unless other-wise indicated).

l Incident l l Response l l Director l l

I l Recoveryl l Technical l l Manager l l Support l l l Manager l l HP l l l Supt l l Dose Assess. l l

l Supv. l l Onsite Monit. l l

& HP Supv l l l Offsite Monit.l l

l Supv. l l Onsite Rad l l l Monit Sect ~l l Offsite Rad l l Monit Sect l

/

O]

s

,8 PLANT MANUAL SECTION: PROCEDURE! WORK PLAN TITLE: NO:

EMERGENCY PLAN DUTIES OF THE EMERGENCY PROCEDURE RADIATION TEAM 1903.43

-s PAGE 8 of 9 (l

\i /

-ARKANSAS NUCLEAR ONE aevisiON 6 oATE s/27/83 CHANGE DATE ATTACHMENT 2 Page 1 of 2 CHECKLIST (TEAM LEADER)

The following items should be considered by the Emergency Radiation Team Leader, and action should be taken, as necessary:

1.0 contact should be attempted with team members by the most expedient method available.

1.1 Arrangements should be made to re-initiate attempts to contact per-sonnel that were not able to be contacted initially.

2.0 Personnel should be assigned to the Onsite and Offsite Radiological Moni-toring Sections (This includes appointment of section leaders, as neces-sary).

3.0 Determine immediate response needs.

3.1 offsite sampling points.

r"'x 3.2 Onsite surveys, sample required.

b 3.3 Initial re-entries by other emergency teams (Obtain approval from the Duty Emergency Coordinator / Recovery Manager).

3.4 Equipment from routine stock that must be retrieved for use.

4.0 Monitor radiation levels, etc., in the activated Emergency Response Centers 4.1 Control Room 4.2 TSC/OSC 4.3 ECC 5.0 Establish contamination control points / measures for the appropriate re-sponse centers.

5.1 Control Room 5.2 TSC/OSC 5.3 ECC 6.0 Issue emergency dosimetry / respiratory equipment, as necessary.

,/ *%

  • J

r-i ., .'.. . .

PLANT M ANUAL SECTION: PROCEDURElWORK PLAN TITLE: NO:

EMERGENCY PLAN DUTIES OF THE EMERGENCY PROCEDURE RADIATION TEAM 1903.43 PAGE 9 of 9 -

(d^'s ARKANSAS NUCLEAR ONE aevision e CHANGE oATE DATE s/27/83 ATTACHMENT 2 Page 2 of 2 7.0 Be prepared to take the following actions, as necessary:

7.1 Personnel / vehicle monitoring / decontamination at the Emergency Control I Center (or as the situation dictates, including relocation of portal monitors, etc., as'necessary).

7.2 Relocate the TLD reader to the Emergency Control Center (or as the situation dictates).

7.3 Relocate the SCBA air compressor to the Emergency Control Center (or as the situation dictates).

7.4 Determine additional equipment needs and make appropriate recommenda-tions to management.

7.5 Set up a personnel shift schedule for an extended incident.

8.0 Provide periodic updates to the team personnel and management personnel.

r

(-

N g

\

a l*

l  :

ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One '

nTLE: TRANSMITTAL FORM NO. 1013.02H REV. # 12 PC #

Arkansas Nuclear One PAGE 1 of 2 Russellville, Arkansas Date June 23. 1983 , ,$$ )

(

MEMORAhTUM T0: /Od* Mdd/

FROM: ANO DOCUMENT CONTROL

SUBJECT:

ANO MASTER ELANT MANUAL UPDATE PROCEDURE NUMBER 1903.40 REV. # 4 PC # TC #

PROCEDURE TITLE DUTIES OF THE EMERGENCY EVACUATION TEAM PROCEDURE NUMBER 1901.41 REV. # 4 PC # TC #

PROCEDURE TITLE mrrIFS OF THE EMERGENCY FIRC TEAM PROCEDURE NUMBER lont 42 'REV. # s PC # TC #

PROCEDURE TITLE mrrTFs nF rHF FMFRCENCY MEDICAL TEAM The following pages of the indicated procedure (s) contains items which involve personal privacy or proprietary material. PLEASE REMOVE '

THE INDICATED MATERIAL PRIOR TO DISTRIBUTION TO PUBLIC DOCUMENT ROOMS, PROCEDURE (S) PAGE (S) 1903.40 3 1903.41 4 l

l PROCEDURE (S) HAS BEEN PLACED IN YOUR SET OF THE PLANT MANUAL.

I a/f PROCEDURE (S) SHOULD BE PLACED IN YOUR SET OF THE PLANT NOTE: PLEASE RETURN SIGNED TRANSMITTAL TO DOCUMENT CONTROL - 4TH FLOOR: ,

9 -

0 SIGNATURE- DATE N0 i UPDATED '

I O 5%+;;nr- g '\

^3 wr w

. . l I

r f

ARKANSAS POWER & LIGHT COMPANY '

Arkansas Nuclear One ~-

TITLE: TRANSMITTAL FORM NO. 1013.02H REV. # 12 PC #

Arkansas Nuclear One PAGE 1 of 2 Russellville, Arkansas Date June 23. 1983 MEMORANDUM To: l07- }l)Ab FROM: ANO DOCUMENT CONTROL

SUBJECT:

ANO MASTER PLANT MANUAL UPDATE PROCEDURE NUMBER 1903.40 REV. # 4 PC # TC #

PROCEDURE TITLE DUTIES OF THE EMERGENCY EVACUATION TEAM PROCEDURE NUMBER 1903.41 REV. # 4 PC # TC #

PROCEDURE TITLE DUTTER OF THE EMERGENCY FIRE TEAM PROCEDUR" NUMBER loot 49 REV. # 5 PC # TC #

PROCEDURE TITLE nnTTFR OF THE EMFRCENCY MEDICAL TEAM The following pages of the indicated procedure (s) contains items which involve personal privacy or proprietary material. PLEASE REMOVE '

THE INDICATED MATERIAL PRIOR TO DISTRIBUTION TO PUBLIC DOCUMENT ROOMS, PROCEDURE (S) PAGE (S) 1903.40 3 1903.41 4 l

l PROCEDURE (S) HAS BEEN PLACED IN YOUR SET OF THE PLANT MANUAL.

l g l PROCEDURE (S) SHOULD BE PLACED IN YOUR SET OF THE PLANT MANUAL.

NOTE: PLEASE RETURN SIGNED TRANSMITTAL TO DOCUMENT CONTROL - 4TH FLOOR:

t SIGNATURE DATE '

UPDATED 1

I

q ARKANSAS POWER & LIGHT COMPANY gf Arkansas Nuclear One -

TITLE: TRI.NSMITTAL FORM NO. 1013.0211 REV. # 12 PC #

Arkansas Nuclear One PAGE 2 of 2 Russellville, Arkansas Date June 23. 1983 MEMORANDUM TO: /d 7, M6 FROM: ANO DOCUMENT CONTROL

SUBJECT:

ANO MASTER PLANT MANUAL UPDATE PROCEDURE NUMBER 1903.43 REV. # 6 PC # TC #

PROCEDURE TITLE DUTIES OF THE EMERGENCY RADIATION TEAM PROCEDURE NUMBER REV. # PC # TC #

PROCEDURE TITLE 3

PROCEDURE NUMBER REV. # PC # TC #

PROCEDURE TITLE The following pages of the indicated procedure (s) contains items which involve personal privacy or proprietary material. PLEASE REMOVE THE INDICATED MATERIAL PRIOR TO DISTRIBUTION TO PUBLIC DOCUMENT ROOMS, PROCEDURE (S) PAGE (S) 1903.42 4 1903.43 6 l l PROCEDURE (S) liAS BEEN PLACED IN YOUR SET OF TIIE PLANT MANUAL.

ljPROCEDURE (S) S110ULD BE PLACED IN YOUR SET OF TIIE PLANT MANUAL.

NOTE: PLEASE RETURN SIGNED TRANSMITTAL TO DOCUMENT CONTROL - 4Til FLOOR:

SIGNATURE DATE ,

UPDATED

9 .

e,. ** UNITED STATES ,

!8 \ - -'

'N NUCLEAR REGULATORY COMMISSION .

G

js WASHINGTON. D. C. 20555
  • ..+

.. / July 17, 1984 50-313 Arkansas Nuclear One 4

- MEMORANDUM FOR: Chief, Document Management Branch, TIDC FROM: Director, Division of Rules and Records, ADM

SUBJECT:

REVIEW 0F UTILITY EMERGENCY PLAN DOCUMENTATION The Division of Rules and Records has reviewed the attached document and has determined that it may now bc .n.ade public1 available.

/

/f

/ d.E

> 1 J. M. Felton, Director. f Division of Rules and Recor s'

[ Office ~of Administration .

Attachment:

_As stated 4

9 4

  • 'u

'-- m_. _