pskmh y e-

-A UNITED STATES s

j NUCLEAR REGULATORY COMMISSION

]

t WASHINGTON, D.C. 20066-0001

\\,...../

1 ENTERGY OPERATIONS. INC.

DOCKET NO. 50-368 ARKANSAS NUCLEAR ONE. UNIT NO. 2 1

AMENDMENT TO FACILITY OPERATING LICENSE i

Amendment No.168 License No. NPF-6 i

1.

The Nuclear Regulatory Commission (the Commission) has found that:

{

A.

The application for amendment by Entergy Operations, Inc. (the i

licensee) dated March 17, 1995, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the i

provisions of the Act, and the rules and regulations of the Commission; l

C.

There is reasonable assurance:

(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be l

conducted in compliance with the Commission's regulations; D.

The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the

{

public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 i

of the Commission's regulations and all applicable requirements have 1

been satisfied.

l 4

9510160128 951011 PDR ADOCK 05000368 P

PDR

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No. NPF-6 is hereby amended to read as follows:

2.

Technical Soecificationi The Technical Specifications contained in Appendix A, as revised through Amendment No.168, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

3.

The license amendment is effective as of the date of issuance, to be implemented within 30 days.

FOR THE NUCLEAR REGULATORY COMMISSION George Kalm ior Project Manager Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: October 11, 1995 J

1 e

ATTACHMENT TO LICENSE AMENDMENT NO.168 FACILITY OPERATING LICENSE NO. NPF-6 DOCKET NO. 50-368 Revise the following page of the Appendix "A" Technical Specifications with the attached page. The revised page is identified by Amendment number and contains vertical lines indicating the area of change.

l REMOVE PAGE INSERT PAGE 3/4 3-1 3/4 3-1 I

3/4.3 INSTRUMENTATION 3/4.3.1 REACTOR PROTECTIVE INSTRUMENTATICN LIMITING CONDITION FOR CPERATION 3.3.1.1 As a minimum, the reactor proteccive instrumentation channels and bypasses of Table 3.3-1 shall be OPERABLE with RESPONSE TIMES as shown in Table 3.3-2.

APPLICABILITY: As shown in Table 3.3-1.

ACTION:

As shown in Table 3.3-1.

SURVEILLANCE REQUIREMENTS 4.3.1.1.1 Each reactor protective instrumentation channel shall be demonstrated OPERABLE by the performance of the CHANNEL CHECK, CHANNEL CALIBRATION and CHANNEL FUNCTIONAL TEST operations for the MODES and at the frequencies shown in Table 4.3-1.

4.3.1.1.2 The logic for the bypasses shall be demonstrated OPERABLE prior to each reactor startup unless performed during the preceding 92 days.

The total bypass function shall be demonstrated OPERABLE at least once per 18 months during CHANNEL CALIBRATION testing of each channel affected by bypass operation.

4.3.1.1.3 The REACTOR TRIP SYSTEM RESPONSE TIME of each reactor trip function shall be demonstrated to be within its limit at least once per 18 months.

Each test shall include at least one channel per function such that all channels are tested at least once every N times 18 months where N is the total number of redundant channels in a specific reactor trip function as shown in the " Total No. of Channels" column of Table 3.3-1.

4.3.1.1.4 The Core Protection Calculator System shall be determined OPERABLE at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by verifying that less than three auto restarts have occurred on each calculator during the past 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

4 4.3.1.1.5 The affected Core Protection Calculator Channel shall be subjected to a CHANNEL FUNCTIONAL TEST to verify OPERABILITY within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> of receipt of a valid CPC Cabinet High Temperature alarm.

1 i

i i

d APJGdlSAS - UNIT 2 3/4 3-1 Amendment No. 24, M,168 l

f

. - -. -