ML20093E166

From kanterella
Jump to navigation Jump to search

Application for Amend to License NPF-5,revising Tech Specs to Provide Addl Restriction on Plant Operation During Limiting Condition for Operation W/One Recirculation Loop Out of Svc
ML20093E166
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 07/12/1984
From: Beckham J
GEORGIA POWER CO.
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML20093E170 List:
References
NED-84-375, TAC-55530, NUDOCS 8407170397
Download: ML20093E166 (3)


Text

Gr%rq a Power Com;uny 333 P edmont Arnue Atlanta Geerta 303nd

. Te# e one 404 526 7020 Ma:hng Addren PoM O'hte Box 4545 AU.inta Georga 30302 Georgia Power J. T. Beckham, Jr. * "' *""""'*"

%ce Pruert and Genera! Wna+ r Nucinar Generation July 12,1984 Director of Maclear Peactor Replation Attention: Mr. Jolm F. Stolz, Chief Operating Reactors Branch No. 4 Division of Licensing U. S. Maclear Regulatory Ctanission Nishington, D. C. 20555 NRC DOCKEP 50-366 OPERATING LICENSE NPF-5 EININ I. HA'ICH NUCLEAR PIANP UNIT 2 REQUEST FOR TECHNICAL SPECIFICATION AMMMNP

_'TO SUPIORP OPERATION IN 'INE FJJJA REGION Gentlemen:

In accordance with the provisions of 10 CFR 50.90, Georgia Power Company (GPC) hereby proposes an amendment to the Edwin I. Hatch Unit 2 Technical Specifications (Appendix A to the Operating License) . These proposed changes would provide an additional restriction on plant operation daring the Limiting condition for Operation riith one recirculation loop out of service. 'the NRC staff has previously indicated to GPC that this proposed amendment would have to be added to the Hatch-2 Technical Specifications before operation in the Extended Load Line Limit Analysis (MJJA) Region of the Power / Flow operating map would be allowed.

GPC previously aabnitted proposed 'nx:hnical Specifications to allow operation in the mJJA region by letter dated February 6, 1984 (NED-84-030) . 'Ihis latest albmittal is provided to address NRC staff concerns regarding Reactor Power Invel stability daring plant operation at certain high power -

low flow conditions. This proposed change would regtire that the plant be operated below the limit shown in 'n!chnic'al Specification Figure 3.4.1.1-1, which corresponds to a load line leading to 80% reactor power at rated core flow, within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> after the loss of service of one recirctilation loop.

O l

  • f

GeorgiaIbwer A Director of Maclear Reactor Reg 11ation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4

.111y 12, 1984 Page 'IWo Both the Plant Review Board and the Safety Review Board have reviewed the proposed charges and have determined that they do not involve an unreviewed safety glestion. 'Ite probability of occurrence and the conseglences of an accident or malfunction of eglipment inportant to safety would not be increased above those analyzed in the ESAR die to this proposed change becalse the affected system will still be restricted to operational conditions bounded by those described in the FSAR. The possibility of an accident or malfunction of a different type than analyzed in the FSAR would not reallt from this proposed change beca1se no new operational or transient modes would be allowed by the new reglirements. 'Ite margin of safety as defined in the Technical Specifications would not be rediced due to this proposed change becalse it would reallt in a more conservative restriction on allo ed operational conditions.

R1rasant to the reglirements of 10 O'R 50.91, Mr. J. L. Iedbetter of the Environmental Protection Division of the Georgia Department of Natural Resairces will be sent a copy of this letter and all applicable attactments.

J. T. Beckham, Jr. states that he is Vice President of Georgia Power Conpany and is althorized to exeolte this oath on behalf of GeottJ a Power i Conpany, and that to the best of his knowledge and belief the facts set forth in this letter are true.

GEDRGIA POER COMPANY By: - -

// J. T. Beckham, Jr.

Sworn t and albscribed be, re me is 2) g g c of ,g ,y ,ty j ,8dec, jp g[ My Commason Expim Sept.18.1987 Notary Riblic CBS/mb Encloalte xc: H. C. Nix, Jr.

Senior Resident Inspector J. P. O'Reilly, (NRC-Region II)

J. L. Iedbetter rwirs

e'

  • ATTAC19Elff 1 ',

NRC DOCFET 50-366 f OPERATING LICENSE NPF-5 EIMIN I. HA'ICH NUCLEAR PIRff UNIT 2 i REQUEST FOR TECHNICAL SPECIFICATION AENDMENT  !

'IO SUPPORP OPERATION IN 'INE EIJA REGION f i

The . proposed changes to '14chnical Specifications (Appendix A to ;

Operating License NPF-5) would be incorporated as follows:

Remove Page Insert Page [

r 3/4 4-1 3/4 4-1  !

3/4 4-la [

i I

r s

9 e

4 i

4 ,

1

[

r t

r f

?

s 4 f

[ .

r

- _ _ _ _ _ _ _ _