Advises of Substantial Slippage in Schedule for Filing of Emergency Plans.Applicant Expects to File Onsite Emergency Plans in Dec 1984 Together W/Description of Arrangements. Related Correspondence
ML20093D233
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/05/1984
From: Trowbridge G
GEORGIA POWER CO., SHAW, PITTMAN, POTTS & TROWBRIDGE
To: Linenberger G, Margulies M, Paris O
Atomic Safety and Licensing Board Panel
References
CON-#484-337 OL, NUDOCS 8410110163
Download: ML20093D233 (2)


Text

ehN REL ATED CCORESPONDENCE SHAW, PITTMAN, Poys & TROWBRIDGE A PARTNERSHIP OF p OFESSIONAL CORPORATIONS 1800 M STR E ET, N . W.

WA N h Njh C h h TELECOpitR GFFICE CF SELFt.iL ..-a 3 [s.' wuw . s.

DOCKET!NG & SEPW - Caser-swa* taw-BRANCH -

GEORGE F. TROWBRIDGE, P.C. I a eaa ao October 5, 1984 Morton B. Margulies, Chairman Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. Gustave A. Linenberger Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Dr. Oscar H. Paris Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D.C. 20555 In the Matter of GEORGIA POWER COMPANY, ET AL (Vogtle Electric Generating Plant, Units 1 and 2)

(Docket Nos. 50-424 and 50-424 (OL)

So-%5L9 Ad So t].29 (od

Dear Administrative Judges:

This is to advise the Board of a substantial slippage in the schedule for the filing of emergency plans for Plant Vogtle. At the May 30, 1984, prehearing conference Applicants estimated that emergency plans would be provided to NRC and the parties in October, 1984. As presently scheduled, Applicants expect to file on-site emergency plans in December, 1984, to-gether with a description of the arrangements which Applicants have made with the DOE Savannah River facility concerning the latter's response within the Savannah River site to an emergen-cy at Vogtle. The December filing will include a general de-scription of the interface between the plant and State and 8410110163 841005 PDR ADOCK 05000424 G PDR 3SDS _

n

-i I . SHAw, PITTMAN, PoTTs & TROWBRIDGE

. A PARTNERSHIR Or PROFEsseONAL CORPORATIONS Administrative Judges Margulies, Linenberger and Paris October 5, 1984 Page 2 county officials. Official State and county emergency plans are expected to be filed in May, 1985,'although it is possible that a reasonable final draft of State and county plans can be furnished.to NRC and the parties before the plans are official-ly filed.

Applicants have advised CPG /GANE and the NRC Staff of this change in schedule. Counsel for the parties have agreed that contentions relating to on-site emergency plans or the arrange-ments with Savannah River should be filed within 30 days after filing of plans and arrangements on these subjects. Conten-tions related to the State and county emergency plans would be due within 30 days after filing of same, or if draft plans are provided, within 30 days after furnishing of the draft.

Respectfully submitted, SHAW, ITTMAN, PO & TROWBRIDGE ,

& L /l4 JJ GWorge/F. TroWbridge, f. C .

Counsel for Licensee cc: Service List n