'N Georgia Institute of Technology
-:[
y NEELY NUCLEAR RESEARCH CENTER
[Mh/
k.
/-,-
900 ATLANTIC DRIVE
',, ' ' "" " /
ATLANTA, GEORGIA 30332-0425 (404)894-3600 USA September 27,1995 Mr. Charles J. Haughney, Chief Storage and Transport System Branch Mail Stop T-8F5 US Nuclear Regulatory Commission Washington, D.C. 20555 License No. R-97 Docket No. 50-160
Dear Mr. Haughney:
Pursuant to 10 CFR 73.771 request advance route approval for irradiated reactor fuel:
Carao
Description:
1)
Twenty-five (25) irradiated fuelelements from a D O moderated reactor. The fuel 2
is MTR type uranium in aluminum alloy.
2)
The cask to be used will either be BMI-1 (ID# USA /5957/B()F) or NAC-LWT (ID#
USA /9225/B(U)F]
Anticipated Schedule 1)
There will be three shipments from Atlanta (NNRC) to Savannah River Site (DOE) if the BMI-1 cask is used or one shipment if the NAC-LWT cask is used.
2)
The approximate duration of each shipment is less than one day.
Route Information 1)
Prospect route: See attachment 2)
Road miles by segment. See attachment 3)
Two urbanized areas are located on the proposed route, i.e. Atlanta, GA and Augusta, GA.
9510130061 950927 PDR ADOCK 05000160 P
PDR 1"GG21 h
l I
Telex: $42507 GTRIOCAATL Fax:404 853-9325 (Venty 404 894-3600)
A urut of the University System of Georgia An Equal Education and Employment Opportunity inst.tution
... ~. - - _..
0$000/60020)t j x..u 2.2d/1r4)
F Page Two
.Mr. Charles J. Haughney, Chief September 27,1995 '
e
.1 1
Physical Protection Plan I
R 1)
_ The transport vehicle will be guarded by armed Georgia Tech Police while'on the Georgia Institute of Technology campus.
2)
The Georgia Public Service Commission will a)
Inspect the loaded -truck for safety and compliance with Georgia regulations prior to leaving the Georgia Tech Campus.
b)
The Georgia Public Service Commission will provide armed, radiologically t
trained escort service from the Georgia Tech campus to the Georgia State line on 1-20.
c)
The Georgia Department of Natural Resources, Environmental Protection Division will provide radiologically trained and equipped escort service from the Georgia Tech campus to the Georgia State line on 1-20,
- d)
Escort service in the State of South Carolina (37 miles) is being negotiated with the South Carolina's govemor's designee in the South Carolina t
Department of Health and Environmental Control.
3)
Communication Plans include:
a.
Citizen's Band (CB) or local law enforcement agency radio communications between the trantport vehicle and escorts and from transport vehicle / escort to local law enforcement agencies.
b.
~ A radiotelephone in the transport vehicle or escort vehicle committeed to i;
travel the entire route will make calls to the communications center j
(Georgia Tech Police Department) at least every two hours.
If you should have any questions, please telephone me at 404-894-3600.
j Sincerely, hA w
~
l R. A. Karam, Ph.D.
Director, NNRC 1;
RAK/ars j
.1) Route Listing and Mileage s
d
+
FC -/ $O Route To Be' Approved:
Georgia:
Miles
- 1) Left onto Atlantic Drive 0
- 2) North on Atlantic Drive to Tenth Street
.1
- 3) East on Tenth Street to I 75
.4
- 4) South on I 75 to I 20 5
- 5) I 20 East to the South Carolina state line 148 Subtotal 153.5 South Carolina:
1)I 20 East to SC 19 18
- 2) South on SC 19 to Savannah River Site 19 Subtotal 37 4
Total 190.5 a