ML20093C829
| ML20093C829 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 09/30/1995 |
| From: | Koudelka M, Maxfield G WISCONSIN ELECTRIC POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| PBL-95-0242, PBL-95-242, NUDOCS 9510130037 | |
| Download: ML20093C829 (9) | |
Text
1
<a Wisconsin v Electnc POWER COMPANY Point Beach Nuclear Plant 6610 Nuclear Rd, Two R;>ers.WI 54241 (414) 755-2321
.I PBL 95-0242 October 5, 1995 Document Control Desk U. S. NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, DC 20555 Gentlemen DOCKETS 50-266 AND 50-301 MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of September 1995.
Sincerely, G. J.
field PBNP Manager amb Attachments cc L. L. Smith, PSCW NRC Regional Administrator, Region III NRC Resident.' inspector i
.onuuo02 9510130037 950930
/ I h6 PDR ADOCK 05000266
/
R PDR.
/
l A wkman7afMuwunEmgCmentkw
. - -. ~
OPERATING DATA REPORT DOCKET NO. 50-266 DATE:
10/05/95 COMPLETED BY:
M. B. Koudelka TELEPHONE:
414 755-6480-OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1 NOTES
- 2. REPORTING PERIOD: September - 19a5
- 3. LICENSED THERMAL POWER (MNT) :
1D C 5
- 4. NAMEPLATE RATING (GROSS MWE) : SE. 3
- 5. DESIGN ELECTRICAL RATING (NET MWE):
497.0
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) :
509.0
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
485.0
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) - NA
- 10. REASONS FOR RESTRICTIONS, (IF ANY) :
NA THIS MONTH YB7't T3 DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 720.0 6,551.h 218,279.0
- 12. NUMBER *0F HOURS REACTOR WAS CRITICAL 720.0 5,605.8 182,445.4
- 13. REACTOR RESERVE SHUTDOWN HOURS O.0 0.0 667.3
- 14. HOU'S GENERATOR ON LINE 720.0 5,560.0 179,272.4
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 84 ti. 9
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1093282.0 8319709.0 253864706.0
- 17. GROSS ELECTRICAL ENERGY GENERATED 370350.0 2824900.0 85763550.0
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 354034.0 2698202.0 81758853.0
- 19. UNIT SERVICE FACTOR 100.0%
84.9%
82.1%
- 20. UNIT AVAILABILITY FACTOR 100.0%
84.9%
82.5%
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 101.4%
84.9%
76.9%
- 22. UNIT CAPACITY FACTOR (USING DER NET) 98.9%
82.9%
75.4%
- 23. UNIT FORCED OUTAGE RATE 0.0%
0.0%
1.5%
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Refueling, G3/30/96, 34 days
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP.
i NA DATA REPORTED AND FAC'IORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
(!
l POINT BEACH NUCLEAR M. ANT DOCKET NO.
50-266 1
AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach, Unit 1
)
l l
MONTH SEPTEMBER -
1995 DATE 10/5/95' COMPLETED BY M. B. Koudelka l
TELEPHONE (414)755-6480 AVERAGE AVERAGE AVERAGE DAR.Y DAILY DAILY.
POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1
484 11 488 21 493 2
488 12 491 22 493 3
489 13 488 23 493 0
489 14 490 24 495 t
5 489 15 488 25 494 6
491 16 492 26 495 7
494 17 494 27 495 i
8 492 18 493 28 496 I
9 488 19 492 29 497 1
10 489 20 493 30 497 l
e b
[
POINT BEACH NUCLEAR PLANT Docket No.
50-266 Unit Name Point Beach. Unit 1 UNIT SHUTDOWNS AND POWER nmUCTIONS Date October 5.1995 O_ -- *- 1 -J By M.B.Km Mkm REPORT MONTH SEPTEMBER - 1995 Telephone No.
414n55-6480 Method of h *F No.
Deer Type' Duratmo Reason 8 Down Lxensee Event Syseeni Consponent Cause and Correceve Action NA NA NA NA NA NA NA NA NA NA
'F: Forced
-2Reason:
'Mc: hod:
- Exhibit G - Irmu A S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG4161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training &
Previous Shutdown Licensing Exam 5 - Reduced Imd F - Ad...:..:-anive 6 - Other (explain) 5 Exhibit I-Same Source G - Operational Error (explain)
H - Other (explain)
I (03-90)
- m..
DOCKET No.
50-266 UNIT NAME-Point Beach Unit 1 DATE-October.5, 1995 COMPLETED BY M. B. Koudelka-TELEPHONE-414/755-6480 Unit 1 operated at an average of 492 MWe net for the report period.
2 Licensee Event Report 50-266/95-SO4-00, Uncompensated PA Alarm Zone, was submitted.
Safety-related maintenance included:
1.
P10 residual heat removal pump rotating assembly pump seal and bearing replacement.
1 l
i l
i I
i i
=
i OPERATING DATA REPORT DOCKET NO. 50-301 DATE: 10/05/95 COMPLETED BY:
M. B. Koudelka TELEPHONE: 414 755-6480 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2
. NOTES
- 2. REPORTING PERIOD: September - 1995
- 3. LICENSED THERMAL POWER (MWT) :
1518.5
- 4. NAMEPLATE RATING (GROSS MWE) :
523.8
- 5. DESIGN ELECTRICAL RATING (NET MWE):
497.0
- 6. MAXIMIM DEPENDABLE CAPACITY (GROSS MWE) :
509.0.
- 7. MAXIMtM DEPENDABLE CAPACITY (NET MWE) :
485.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCF LAST REPORT, GIVE REASONS:
NA
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) : NA
- 10. REASONS'FOR RESTRICTIONS, (IF ANY) :
NA THIS MONTH YEAR-TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 720.0 6,551.0 203,064.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 6,405.4 178,457.0
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9
- 14. HOURS GENERA 70R ON LINE 720.0-6,324.3 176,019.0
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1087911.0 9442473.0 253424398.0
- 17. GROSS ELECTRICAL ENERGY GENERATED 365070.0 3178670.0 86129780.0
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 348433.0 3032747.0 82113262.0
- 19. UNIT SERVICE FACTOR 100.0%
96.5%
86.7%
- 20. UNIT AVAILABILITY FACTOR 100.0%
96.5%
86.8%
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 99.8%
95.5%
02.8%
- 22. UNIT CAPACITY FACTOR (USING DER NET) 97.4%
93.1%
81.4%
- 23. UNIT FORCED OUTAGE RATE 0.0%
0.0%
0.9%
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Refueling, 10/07/95, 36 days
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
NA DATA REPORTED AND FAC70RS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 l
)
POINT BEACH NUCLEAR PLANT DOCKET NO.
50-301 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach, Unit 2 MONTH SEPTEMBER -
1995 DATE 10/5/95 COMPLETED BY M. B. Koudeiks TELEPHONE (414) 755-6480' AVERf_GE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe DET 1
472 11 482 21 491 2
476 12 484 22
-483 3
477 13 483 23 487 4
478 14 485 24 488 i
5 479 15 484 25 487 6
480 16 491 26 489 7
483 17 484 27 488 8
481 18 491 28 489 9
477 19 483 29 495 10 478 20 487 30 486 I
I
l ~~ ~
~
~
~
POINT BEACH NUCLEAR PLANT Decket No.
50-301 Unit Name Point bach. Unit 2 UNIT SHUrDOWNS AND POWE3t REDUCTIONS Date -
_ October 5.1995 Completed By M. B. Kowleika REPORT MONTH SEPTEMBER - 1995 Telephone No.
414r755-6480 Method of Shutung Duranon Ixensee Event System Component Cause and Corrective Action l
No.
Dese Type' Olaurs)
Reason' nw Report No.
Code' Code' To r.i.. i n- -- -
NA NA NA NA NA NA NA NA NA NA
'F: Forced 2Reason:
' Method:
- Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for yiv ion of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG4)l61)
D - Regulatory Restriction 4 - Contmuation of E - Operator Trammg &
Previous Shutdown Licensing Exam 5 - Reduced Load F - Administrative 6 - Other (explain)
' Exhibit I - Same Source G - Operational Error (explain)
H - Other (explain)
PaF m 28b (0190)
,3^
DOCKET NO.-
50-301 UNIT NAME Point Beach Unit 2'-
DATE
- September 7, 1995 COMPLETED BY M. B.'Koudelka TELEPHONE 414/755-6480 4
Unit 2 operated at an average of 484 MWe net for the report period.
J Safety-related maintenance. included:
- 1..
2T70B P2B charging pump discharge accumulator bladder replacement.
b I
l l
i 4
e 1
~
4