ML20093C708

From kanterella
Jump to navigation Jump to search
Forwards Public & Central Files Versions of Revised Epips, Including Rev 33 to EPIP Index,Rev 27 to EPIP Form Index,Rev 14 to EPIP 3.2 & Rev 33 to EPIP Index,Rev 27 to EPIP Form Index & Rev 14 to EPIP 3.2.Central Files Version Withheld
ML20093C708
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/04/1995
From: Maxfield G
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19317C002 List:
References
PBL-95-0240, PBL-95-240, NUDOCS 9510120408
Download: ML20093C708 (1)


Text

.

4 i

Wisconsin L

' Electnc

\\

POWER COMPANY t

s l

Point Beach Nuclear Plant 6610 Nuclear Rd, Two Rivers, Wl 54241

]

(414) 755-2321 4

PBL 95-0240

- October. 4, 1995 5

Document Control Desk U.S. NUCLEAR REGULATORY COMMISSION i

Mail Station P1-137 Washington, DC 20555 4

Gentlemen:

DOCKET NOS. 50-266 & 50-301 EMERGENCY PLAN IMPLEMENTING PROCEDURES POINT BEACH NUCLEAR PLANT, UNITS 1 &2 Enclosed are copies of revised procedures to the Point Beach Nuclear Plant Emergency Plan Implementing Procedures Manual. The Procedures consist of changes which should be filed in your copies of the subject document in accordance with the attached instructions.

1 Please note that the procedures containing names and telephone numbers are stamped "NRC ONLY, NOT FOR PUBLIC DISCLOSURE." A copy of the affected procedures, with names and numbers deleted, are provided and stamped " NAMES AND TELEPHONE NUMBERS DELETED" to assure confidentiality and facilitate your distribution to the public documents rooms.

Sincerely, i

G. J.

field Manager j

kak Enclosure 4

cc:

NRC Resident Inspector (w/o/e) j Incident Response Center, Region III gh' r

i L

nw

~

^

bi~'

'O!'

vsto12o4os 951004 l

PDR ADOCK 0500o266 A/

n jflY

'J V I

F

.PDR.

~

$M /DL i

j)p

/

-,,m_

a, c

.