ML20093C423

From kanterella
Jump to navigation Jump to search
Modifies Commitments Made During 841001 Telcon Re SER Confirmatory Issue 22.Util Will Implement Augmented Inservice Insp Program for Outboard Feedwater Check Valves at First Refueling Outage
ML20093C423
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 10/04/1984
From: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Schwencer A
Office of Nuclear Reactor Regulation
References
CON-#484-480 OL, NUDOCS 8410100533
Download: ML20093C423 (3)


Text

e a

g PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101 JOHN 5.KEMPER VIC E-PR ESID E NT Q NGINER RONG AND NESS ANCM Mr. A. Schwencer, Chief Docket No.:

50-352 Licensing Branch No. 2 U. S. Nuclear Regulatory Ccmnission Washington, D.C. 20555

Subject:

Limerick Generating Station, Unit 1 Request for Additional Infonnation frcun NRC Materials Engineering Branch (MrEB)

SER Confirmatory Issue No. 22

References:

(1) Ietter, J. S. Kmper to A. Schwencer, dated 9/7/84.

(2) 10/1/84 Telecon between W. Hazelton (NRC/MTEB),

R. E. Martin (NBC/DC), and H. D. Honan and T. C. Hinkle (PECO).

(3)

Letter, J. S. Kertper to A. Schwencer dated September 6, 1984.

File:

GOVT l-1 (NBC)

Dear Mr. Schwencer:

This letter modifies our reference (1) letter in order to confirm cxmnitments made during the reference (2) telecon.

PECO will provide an augmented inservice inspection program for the Limerick Unit 1 outboard feedwater check valves (1F074A and 1F074B valves). This inspection program will be implemented at the first refueling outage. It will include inspection of the entire surface of the valve bodies, both internal and external, by surface or other examination technique acceptable to the staff. The inspection program will, after appropriate surface preparation, be of sufficient sensitivity to detect a mininum crack length of 315 inches. This is equivalent to the conservative crack size assured in the fracture mechanics analysis provided via the reference (3) letter. Inspections subsequent to the first refueling outage will be in accordance with the Unit 1 ISI program.

8410100533 841004 mT PDR ADOCK 05000352 OTf PDR E

N

I' 2-i The atxynented inspection program will be further described in the ISI program for Limerick Unit 1.

'1he ISI program will be sutnitted ~

for NRC evaluation 6 months after ccanercial operation as required by SER confirmatory issue 12.

We trust this information is sufficient to close confirmatory issue no. 22.

Sincerely, EOh JHA/gra/10028402 cc: See Attached Service List

____.__m.-

s-cc: Judge Helen F. Hoyt Judge Jerry Harbour Judge Richard F. Cole Judge Christine N. Kohl Judge Gary J. Edles Judge Reginald L. Gotchy Troy B. Conner, Jr., Esq.

. Ann P. Hodgdon, Esq.

-Mr. Frank R. Romano Mr. Robert L. Anthony Ms.-Phyllis.Zitzer Charles W. Elliot, Esq.

Zort G. Ferkin, Esq.

Mr. Thomas Gerusky Director, Penna. Emergency Management Agency

' Angus R. Love, Esq.

David Wersan, Esq.

Robert J. Sugarman, Esq.

l Martha W. Bush, Esq.

l Spence W.' Perry, Esq.

i Jay M. Gutierrez, Esq.

Atomic Safety & Licensing Appeal Board Atomic Safety-S Licensing Board Panel Docket & Service Section Mr. James Wiggins Mr. Timothy R. S. Campbell

- - _ _ - _ _ - - _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _.