ML20093C227
| ML20093C227 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 10/01/1984 |
| From: | Counsil W, Sears C NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES |
| To: | Murley T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML20093C230 | List: |
| References | |
| REF-QA-99900509 F0568A, F568A, NUDOCS 8410100439 | |
| Download: ML20093C227 (2) | |
Text
-
General Offices
- Seiden Street, Berlin, Connecticut q
P.O. BOX 270 HARTFORD. CONNECTICUT 06141-0270 (203) 666-6911
[
g as u ures aw.,
October 1,1984
?
Docket No. 50-423 F0568A L
Dr. Thomas E. Murley l
Regional Administrator
[
Region I
}
U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406
References:
(1)
W. G. Counsil to T. E. Murley, " Final Rule, Reporting of f.
Changes to the Quality Assurance Program", A03039, dated l
June 9,1983.
f (2)
W. G. Counsil to T. E. Murley, " Submittal of Principal Contractor's Quality Assurance Program", B10911, dated September 30,1983.
Dear Dr. Murley:
Annual Reporting of Changes to the Quality Assurance Program Submittal of Principal Contractor's Quality Assurance Program Millstone Nuclear Power Station, Unit No. 3 In accordance with 10CFR50.55(f)(2), transmitted herewith are three (3) copies of the current Stone & Webster Engineering Corporation (SWEC) Quality Assurance Program Manual for Millstone Nuclear Power Station, Unit 3, Table of Contents, Revision G, dated July 12,1984 (Attachment 1). For your convenience, a summarized listing of the changes contained in Revision G is also provided (Attachment II). SWEC is the only principal contractor whose quality assurance program is utilized by Northeast Utilities for Millstone Unit 3.
If you have any questions regarding this submittal, please contact Mr. Donald O.
Nordquist t. (203) 665-5447.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY W.b.b W. G. Counsil Senior Vice President By: C. F. Sears Vice President h
8410100439 841001
/1(30 PDR ADOCK 05000423 IX a
A PDR 1
r.
- cc:
U. S. NRC Document' Control Desk (15 copies)
NRC Region IV Vendor Program Branch (1 copy)
- 3. Shediosky - NRC Senior Resident inspector - Millstone Station (1 copy)
' T. Rebelowski - NRC Resident Inspector - Millstone Unit 3 (1 copy)
G. Napuda - NRC Region 1 (3 copies) 0 J
+
1
+
t i.
j 7
L&