Responds to NRC Re Violations Noted in IE Insp Repts 50-373/84-12 & 50-374/84-16.Corrective Actions: Retraining on Current Notification Procedures Begun W/ Completion Expected by 840801
ML20092P413
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 06/26/1984
From: Farrar D
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20092P411 List:
References
8828N, NUDOCS 8407060267
Download: ML20092P413 (3)


Text

y

/'N Commonwealth Edison f

) one First National Plaza, Chicago, Ilknors O "J Address Reply to: Post Office Box 767 3

/ Chicago. Illinois 60690 June 26, 1984 Mr. James G. Keppler Regional Administrator U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137

Subject:

LaSalle County Station Units 1 and 2 Response to Inspection Report Nos.

50-373/84-12 and 50-374/84-16 NRC Docket Nos. 50-373 and 50-374 Reference (a):

C. J. Paperiello letter to Cordell Reed dated May 29, 1984.

Dear Mr. Keppler:

This letter is in response to the inspection conducted by Mr. T. Plaski and Ms. G. Christoffer on May 7-11, 1984, of activities at LaSalle County Station.

Reference (a) indicated that certain activities appeared to be in noncompliance with NRC requirements.

The Commonwealth Edison Company response to the Notice of Violation is.provided in the enclosure.

If you have any further questions on this matter, please direct them to this office.

Very truly yours,

= -l _ ;

. L. Farrar Director of Nuclear Licensing 1m Attachment cc:

NRC Resident Inspector - LSCS G407060267 040702 gDRADOCK 05000373 PDR 8828N 1

JUN 9 719@E

-. =

7 v '.,

a ATTACHMENT COMMONWEALTH EDISON COMPANY t

RESPONSE TO NOTICE OF VIOLATION i

The item of noncompliance identified in Appendix A of the NRC letter dated May'29, 1984 is responded to in the following paragraphs:

10 CFR 50.54(q) requires in part that a-licensee authorized to possess and/or operate a nuclear power reactor shall follow and maintain in effect emergency plans which meet the standards in 10 CFR 50.47(b) of this part and.the requirements in Appendix E to this part.

10 CFR.50, Appendix E, Section IV.D.3 states in part that a licensee shall have the capability to notify responsible State and local governmental agencies within 15 minutes after declaring a emergency.

Contrary to.the above, the licensee did not have the capabi-lity to notify off-site agencies within 15 minutes as demonstrated during the period from April 9, 1983 through April 29, 1984, when on all seven occasions the licensee did not initially notify the responsible State agency-of an emergency at the LaSalle County Station within 15 minutes from the time of emergency declaration.

. Corrective Action Taken and Results Achieved.

I On May 21, 1984, LaSalle Station Training Department commenced i

retrainir.g on current notification procedures.

This training will be completed by August-1, 1984.

In addition, a review of the notification procedure was conducted by Corporate Emergency l

Planning and the recommended changes are provided below.

Corrective Action-Taken to Avoid Further Non-Compliance a

Corporate Emergency Planning shall issue a letter to all Station.

t Superintendents reiterating the importance of the 15 minute requirement. - The letter shall contain instructions to Station Directors / Acting Station Directors to ensure the requirement is.

met.

These instructions shall indicate that.the NARS call on the appropriate NARS Code shall be made without contacting System Power Supply Office (SPS0) if insufficient time remains to meet the. requirement.

A subsequent call shall be made to

.SPSO.

This letter shall require that personnel log the. time the

State of Illinois and, as applicable, Iowa or Wisconsin was l-notified.

T w

"w we T1 T

t' 9 W = 4 F

i-w*O t

.=-wm-Y re V'*

W W

WtM'$'-

t""W

Y T* CWT'-'*"

  • 7 W
  • r

. A letter shall be written to the SPS0 reiterating the importance of the 15 minute notification requirement.

This letter shall indicate when the 15 minute clock starts.

Instructions to SPS0 shall indicate that the NARS call shall be made without contacting the Nuclear Duty Officer if insufficient time remains to meet the requirement.

~A subsequent call by the SPS0 shall be made to the Nuclear Duty Officer.

The letter shall also require that the following log entries be made:

a)

The time the NARS message was received from the station, b) the time the State of Illinois and, if applicable, Iowa or Wisconsin was notified, and c) the time the Nuclear Duty Officer was notified.

Finally, as an additional enhancement, it is Commonwealth Edison's intent to establish new NARS codes which will allow the Shift Engineer to notify the State of Illinois and, if applicable, Iowa or Wisconsin and the SPS0 with a single phone call.

However, NARS is operated and maintained by the State of Illinois and requires its concurrence 'or any change.

Full compliance is considered achieved upon issuance of guidance by the corporate GSEP Staff and subsequent training at each plant.

Date of Full Compliance Full compliance will be achieved by August 1, 1984.