ML20092N739

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for May 1984
ML20092N739
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/31/1984
From: Dodge R, Snow B
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8407050008
Download: ML20092N739 (5)


Text

.

0'

.g.

OPERATING DATA REPORT DOCKET NO.

50 244 DATE June 25. 1984 COMPLETED BY 8Mf MM-

" Robert E. Dodge #'

TELEPHONE (315) 524-4446 Ext. 39G

. OPERATING STATUS Ginna Station

1. Unit Name:

GINNA STATION. UNIT #1 Notes

2. Reporting Period:

May, 1984 See Operating Summary

3. Licensed Thermal Power (MWr):

1520 Page 4.

4. Nameplate Rating (Gross MWe):

490

5. Design Electrical Rating (Net MWe):

470

6. Maximum Dependable Capacity (Gross MWe):

490

7. Maximum Dependable Capacity (Net MWe):

470

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Gite Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr. to Date Cumulative

11. itours In Reporting Period 744 3.647 127.223
12. Number of Hours Reactor Was Critical 237.15 1.727.23 95.327.21
13. Reactor Reserve Shutdown Hours 40.73 40.73 1,672.05
14. Hours Generator On-Line 185.50 1.675.05 93.186.68
15. Unit Reserve Shutdown Hours 0.00 0.00 8.50
16. Gross Thermal Energy Generated (MWH) 160.440 2.367.864 128.625.233
17. Gross Electrical Energy Generated (MWH) 50,384 783.R72 41,948,242
18. Net Electrical Energy Generated (MWH) 46,105 743,735 39,769.980
19. Unit Service Factor 2 4. ') 3 %

45.939 73.25%

20. Unit Availability Factor 24.93fL 45.93%

73_25%

21. Unit Capacity Factor (Using MDC Net) 13.18" 43.39%

69.23%

22. Unit Capacity Factor (Using DER Net) 13.18%

43.39%

68.23%

23 Unic Forced Outage Rate 25.73%

3_, 6 9 %

7.94%

24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
25. If Shut Down At End Of Report. Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecas t Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION NOTE:

Items 13 and 15 Cummulative total commencing a"

'acv- 'm January 1, 1975.

8407050000 040531 PDR ADOCK 05000244

})

R PDR

7; f:

./

i AVERAGE DAILY UNIT POWER LEVEL D7CKET NO.

50-244

~~ (nna S,t,a_t_io_n [~~~

UNIT

  1. 1 G

DATE Ju_ne 25, 1984_

COMPLETED BY

(,

TELEPHONE 1 (315) 524-4446 Ext. 396 at Ginna MONTH May 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL

'(MWe-Net)

(MWe-Net) 1.

-0_____.

=

0 17.

2.

0___

18.

_O_

3.

0 19.

0 4.

0 20.

O_

5.

0 21.

O _ -_____

6.

0 22.

0

=___.

7.

_0_ _

23.

- _, _ _1_2, _ __

8.

0 24.

-138

== -

==

9.

_0_

25.

216 10.

___0 26.

_,1,9_4_

11. _

_,0_ _

27.

_2_3_6 12.

_0_

28.

__ _,3,39_,_ _,_,

13.

0 29.

391 14, 14 30.

14 15.

_ _ _ _ _ _0_

31.

_ _ _ _ _ _0, _ _ _ _ _ _

16.

0 INSTRUCTIONS On this format, 11.st the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

L.

~ -.

DOCKET NO.

50-244

. UNIT NAME f1_,Ginna Station UNIT SHUTDOWN AND POWER REDUCTIONS DATE -__J e_25 1984 COMPLETED BY -

Robert E.

Dodge REPORT MONTil May 1984 TELEPilONE ( 315 ) 524-4446 Ext. 396 Ginna Ststion I

n fe

!q oE Licensee Cause & Corrective g,

I Event 1,* $

8 Action to No.

Det.

1 53 3

id Report #

((

10 jj j

Prevent Recurrence u

2 g

o 84-1 5-14-84 F

207.80 A

1 N/A HF 3 econ-Secondary chemistry out of dary specs, crevice cleaning and

hemi-sludge lancing on S/G A&B.

stry Due to condenser tube leak.

84-2 5-23-84 S

6.67 B

1 N/A NA NA T-18C Overspeed Test.

84-3 5-30-84 F

57.28 A

3 N/A IIA 3xciter Air cooler gasket poor com-

?ailure pression.

Shimmed air cooler to provide proper alignment and sealant on both sides of gasket.

1 2

3 4

F: Forced Reason:

Method:

Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee 3-Automatic Scram.

Event Report (LER) File (NUREG-C-Refueling

~

4-Other (Explain) 0161)

D-Regulatory Restriction E-Operator Training & License Examination F-Administrative 5

u, G-Operational Error (Explain)

... in e v. in s.

II-Other (Explain)

Exhibit 1 - Same Source

'. 4. F,

..
  • NARRATIVE SUtetARY OF OPERATING EXPERIENCE DOCKET NO.

50__244 UNIT Ginna _S_t_a_ tion, Unit #_1 DATE June 25p _1_984 COMPLETED BY

[

' Robert E.

Dodge TELEPHONE 1 (315_)_ 5_24-4,446 EXT. 396 at Ginna MONTH

_M a y l_9_8 4 On May-14, 1984 @ 0610 hours0.00706 days <br />0.169 hours <br />0.00101 weeks <br />2.32105e-4 months <br /> Ginna Station completed its 1984 Annual Refueling and Maintenance Shutdown.

On May 14, 1984 0 1618 hours0.0187 days <br />0.449 hours <br />0.00268 weeks <br />6.15649e-4 months <br /> the unit was shutdown due to Secondary System condensate chemistry problems.

May 23, 1984 the unit was restored to service @ 0806 hours0.00933 days <br />0.224 hours <br />0.00133 weeks <br />3.06683e-4 months <br />.

The unit was removed from service at 1615 hours0.0187 days <br />0.449 hours <br />0.00267 weeks <br />6.145075e-4 months <br /> for Procedure T-18C Turbine Overspeed Test and to repair leaky exciter cooler.

'At 2255 hours0.0261 days <br />0.626 hours <br />0.00373 weeks <br />8.580275e-4 months <br /> on May 23, 1984, the unit was restored to service until May 30, 1984 @ 2221 hours0.0257 days <br />0.617 hours <br />0.00367 weeks <br />8.450905e-4 months <br />, at which time exciter failure resulted in a Reactor Trip.

i i

e 4

4

-n, p.

---m w-

--m.,,--

-r,-

.,,,-e------~w

,-,,w-m-ww-n-e-

-,,,,--n,,,--v

--~.--.,-v-

-m

f

./

J

~.

n

,, 3 ss a s ROCHESTER GAS AND ELECTRIC CORPORATION

  • 89 EAST AVENUE, ROCHESTER, N.Y.14649 Y#tEPHONE

.u a c c,0 c n 6 546 2700 GINNA STATION June 25, 1984 Director, Office of Management Information and Program Analysis U.S.

NUCLEAR REGULATORY COMMISSION Washington, DC 20555

Subject:

Monthly Report for May, 1984 Operating Status Information R.

E. Ginna Nuclear Power Plant Unit No. 1 Docket No. 50-244 Dear Sir Pursuant to our Technical Specification 6.9.1, attached herewith is.the monthly operating status report for Ginna Station for the month of May, 1984 Very truly yours, l

LL Bruce A.

Snow Plant Superintendent BAS /eeg Attachments cc:

Dr. Thomas E.

Murley NRC (1)

II I i