OPERATING DATA REPORT DOCKET NO.
50 244 DATE June 25. 1984 COMPLETED BY 8Mf MM-
" Robert E. Dodge #'
TELEPHONE (315) 524-4446 Ext. 39G
. OPERATING STATUS Ginna Station
- 1. Unit Name:
GINNA STATION. UNIT #1 Notes
- 2. Reporting Period:
May, 1984 See Operating Summary
- 3. Licensed Thermal Power (MWr):
1520 Page 4.
- 4. Nameplate Rating (Gross MWe):
490
- 5. Design Electrical Rating (Net MWe):
470
- 6. Maximum Dependable Capacity (Gross MWe):
490
- 7. Maximum Dependable Capacity (Net MWe):
470
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Gite Reasons:
- 9. Power Level to Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Yr. to Date Cumulative
- 11. itours In Reporting Period 744 3.647 127.223
- 12. Number of Hours Reactor Was Critical 237.15 1.727.23 95.327.21
- 13. Reactor Reserve Shutdown Hours 40.73 40.73 1,672.05
- 14. Hours Generator On-Line 185.50 1.675.05 93.186.68
- 15. Unit Reserve Shutdown Hours 0.00 0.00 8.50
- 16. Gross Thermal Energy Generated (MWH) 160.440 2.367.864 128.625.233
- 17. Gross Electrical Energy Generated (MWH) 50,384 783.R72 41,948,242
- 18. Net Electrical Energy Generated (MWH) 46,105 743,735 39,769.980
- 19. Unit Service Factor 2 4. ') 3 %
45.939 73.25%
- 20. Unit Availability Factor 24.93fL 45.93%
73_25%
- 21. Unit Capacity Factor (Using MDC Net) 13.18" 43.39%
69.23%
- 22. Unit Capacity Factor (Using DER Net) 13.18%
43.39%
68.23%
23 Unic Forced Outage Rate 25.73%
3_, 6 9 %
7.94%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
- 25. If Shut Down At End Of Report. Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecas t Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION NOTE:
Items 13 and 15 Cummulative total commencing a"
'acv- 'm January 1, 1975.
8407050000 040531 PDR ADOCK 05000244
})
R PDR
7; f:
./
i AVERAGE DAILY UNIT POWER LEVEL D7CKET NO.
50-244
~~ (nna S,t,a_t_io_n [~~~
UNIT
- 1 G
DATE Ju_ne 25, 1984_
COMPLETED BY
(,
TELEPHONE 1 (315) 524-4446 Ext. 396 at Ginna MONTH May 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
'(MWe-Net)
(MWe-Net) 1.
-0_____.
=
0 17.
2.
0___
18.
_O_
3.
0 19.
0 4.
0 20.
O_
5.
0 21.
O _ -_____
6.
0 22.
0
=___.
7.
_0_ _
23.
- _, _ _1_2, _ __
8.
0 24.
-138
== -
==
9.
_0_
25.
216 10.
___0 26.
_,1,9_4_
- 11. _
_,0_ _
27.
_2_3_6 12.
_0_
28.
__ _,3,39_,_ _,_,
13.
0 29.
391 14, 14 30.
14 15.
_ _ _ _ _ _0_
31.
_ _ _ _ _ _0, _ _ _ _ _ _
16.
0 INSTRUCTIONS On this format, 11.st the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
L.
~ -.
DOCKET NO.
50-244
. UNIT NAME f1_,Ginna Station UNIT SHUTDOWN AND POWER REDUCTIONS DATE -__J e_25 1984 COMPLETED BY -
Robert E.
Dodge REPORT MONTil May 1984 TELEPilONE ( 315 ) 524-4446 Ext. 396 Ginna Ststion I
n fe
!q oE Licensee Cause & Corrective g,
I Event 1,* $
8 Action to No.
Det.
1 53 3
id Report #
((
10 jj j
Prevent Recurrence u
2 g
o 84-1 5-14-84 F
207.80 A
1 N/A HF 3 econ-Secondary chemistry out of dary specs, crevice cleaning and
- hemi-sludge lancing on S/G A&B.
stry Due to condenser tube leak.
84-2 5-23-84 S
6.67 B
1 N/A NA NA T-18C Overspeed Test.
84-3 5-30-84 F
57.28 A
3 N/A IIA 3xciter Air cooler gasket poor com-
?ailure pression.
Shimmed air cooler to provide proper alignment and sealant on both sides of gasket.
1 2
3 4
F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee 3-Automatic Scram.
Event Report (LER) File (NUREG-C-Refueling
~
4-Other (Explain) 0161)
D-Regulatory Restriction E-Operator Training & License Examination F-Administrative 5
u, G-Operational Error (Explain)
... in e v. in s.
II-Other (Explain)
Exhibit 1 - Same Source
'. 4. F,
- ..
- NARRATIVE SUtetARY OF OPERATING EXPERIENCE DOCKET NO.
50__244 UNIT Ginna _S_t_a_ tion, Unit #_1 DATE June 25p _1_984 COMPLETED BY
[
' Robert E.
Dodge TELEPHONE 1 (315_)_ 5_24-4,446 EXT. 396 at Ginna MONTH
_M a y l_9_8 4 On May-14, 1984 @ 0610 hours0.00706 days <br />0.169 hours <br />0.00101 weeks <br />2.32105e-4 months <br /> Ginna Station completed its 1984 Annual Refueling and Maintenance Shutdown.
On May 14, 1984 0 1618 hours0.0187 days <br />0.449 hours <br />0.00268 weeks <br />6.15649e-4 months <br /> the unit was shutdown due to Secondary System condensate chemistry problems.
May 23, 1984 the unit was restored to service @ 0806 hours0.00933 days <br />0.224 hours <br />0.00133 weeks <br />3.06683e-4 months <br />.
The unit was removed from service at 1615 hours0.0187 days <br />0.449 hours <br />0.00267 weeks <br />6.145075e-4 months <br /> for Procedure T-18C Turbine Overspeed Test and to repair leaky exciter cooler.
'At 2255 hours0.0261 days <br />0.626 hours <br />0.00373 weeks <br />8.580275e-4 months <br /> on May 23, 1984, the unit was restored to service until May 30, 1984 @ 2221 hours0.0257 days <br />0.617 hours <br />0.00367 weeks <br />8.450905e-4 months <br />, at which time exciter failure resulted in a Reactor Trip.
i i
e 4
4
-n, p.
---m w-
--m.,,--
-r,-
.,,,-e------~w
,-,,w-m-ww-n-e-
-,,,,--n,,,--v
--~.--.,-v-
-m
f
./
J
~.
n
,, 3 ss a s ROCHESTER GAS AND ELECTRIC CORPORATION
- 89 EAST AVENUE, ROCHESTER, N.Y.14649 Y#tEPHONE
.u a c c,0 c n 6 546 2700 GINNA STATION June 25, 1984 Director, Office of Management Information and Program Analysis U.S.
NUCLEAR REGULATORY COMMISSION Washington, DC 20555
Subject:
Monthly Report for May, 1984 Operating Status Information R.
E. Ginna Nuclear Power Plant Unit No. 1 Docket No. 50-244 Dear Sir Pursuant to our Technical Specification 6.9.1, attached herewith is.the monthly operating status report for Ginna Station for the month of May, 1984 Very truly yours, l
LL Bruce A.
Snow Plant Superintendent BAS /eeg Attachments cc:
Dr. Thomas E.
Murley NRC (1)