Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217D1261999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Monticello Nuclear Generating Plant.With ML20216E7031999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Monticello Nuclear Generating Plant.With ML20210Q6611999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Monticello Nuclear Generating Plant.With ML20209F7901999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Monticello Nuclear Generating Plant.With ML20195H0351999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Monticello Nuclear Generatintg Plant.With ML20206N1721999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Monticello Nuclear Generating Plant.With ML20205P5701999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Monticello Nuclear Generating Plant.With ML20205G7391999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Monticello Nuclear Generating Plant.With ML20199F6211998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Mngp.With ML20198B2531998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Monticello Nuclear Generating Plant.With ML20195D2381998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Monticello Nuclear Generating Plant.With ML20154L3471998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Monticello Nuclear Generating Plant.With ML20153B0861998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Monticello Nuclear Generating Plant.With ML20237B8461998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Monticello Nuclear Generating Plant ML20236R1941998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Monticello Nuclear Generating Plant ML20249A5861998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Monticello Nuclear Generating Plant ML20247K3971998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Monticello Nuclear Generating Plant ML20217F6431998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Monticello Nuclear Generating Plant ML20216H6481998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Monticello Nuclear Generating Plant ML20203B2821998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Monticello Nuclear Generating Station ML20198P2201997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Monticello Nuclear Generating Plant ML20203J7131997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Monticello Nuclear Generating Plant ML20199H8181997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Monticello Nuclear Generating Plant ML20217K2081997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Monticello Nuclear Generating Plant ML20216H7771997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Monticello Nuclear Generating Plant ML20217K2741997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Monticello Nuclear Generating Plant ML20149E2921997-06-30030 June 1997 Monthly Operating Rept for June 1997 for MNGP ML20141C2841997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Monticello Nuclear Generating Plant ML20137W2621997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Monticello Nuclear Generating Plant ML20136H1671997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Monticello Nuclear Generating Plant ML20134M7071997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Monticello Nuclear Generating Plant ML20133J1401996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Monticello Nuclear Generating Plant ML20132A8771996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Monticello Nuclear Generating Plant ML20134L2761996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Monticello Nuclear Generating Plant ML20128Q7831996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Monticello Nuclear Generating Plant ML20117M8161996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Monticello Nuclear Generating Plant ML20116M2991996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Monticello Nuclear Generating Plant ML20115H5651996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Monticello Nuclear Generating Plant ML20112J1921996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Monticello Nuclear Generating Plant ML20112A3121996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Monticello Nuclear Generating Plant ML20107E9831996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Monticello Nuclear Generating Plant ML20106H0591996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Monticello Nuclear Generating Plant ML20100G5031996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Monticello Nuclear Generating Plant ML20096C8061995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Monticello Nuclear Plant ML20095G0231995-11-30030 November 1995 Monthly Operating Rept for Nov 1997 for Monticello Nuclear Generating Plant ML20094L1921995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Monticello Nuclear Generating Plant ML20093E6241995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Monticello Nuclear Generating Plant ML20092F4121995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Monticello Nuclear Generating Plant ML20087H3011995-07-31031 July 1995 Monthly Operating Rept for Jul 1995 for Monticello Nuclear Generating Plant ML20086K1731995-06-30030 June 1995 Monthly Operating Rept for June 1995 for Monticello Nuclear Generating Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H2061999-10-12012 October 1999 Safety Evaluation Supporting Amend 106 to License DPR-22 ML20217D1261999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Monticello Nuclear Generating Plant.With ML20216E7031999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Monticello Nuclear Generating Plant.With ML20210Q0521999-08-0404 August 1999 Safety Evaluation Approving Relief Request 10 to License DPR-22 Per 10CFR50.55a(g)(6)(i).Inservice Exam for Relief Request 10,Parts A,B,C,D & E Impractical & Reasonable Assurance of Structural Integrity Provided ML20210Q6611999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Monticello Nuclear Generating Plant.With 05000263/LER-1999-007, :on 990610,HPCI Test Return Valve Was Unable to Close Against Max Expected Differential Pressure.Caused by Failure to Accurately Predict Valve Performance.Procedure Revised.With1999-07-0909 July 1999
- on 990610,HPCI Test Return Valve Was Unable to Close Against Max Expected Differential Pressure.Caused by Failure to Accurately Predict Valve Performance.Procedure Revised.With
05000263/LER-1999-006-01, :on 990602,during Quarterly Surveillance Hcpi Was Declared Inoperable.Caused by Drain Pot Alarm.Revised HPCI Surveillance Test Procedure.With1999-07-0202 July 1999
- on 990602,during Quarterly Surveillance Hcpi Was Declared Inoperable.Caused by Drain Pot Alarm.Revised HPCI Surveillance Test Procedure.With
ML20209F7901999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Monticello Nuclear Generating Plant.With 05000263/LER-1999-005, :on 990508,personnel Inserted Manual Scram When Pressure Transient Closed Air Ejector Suction Isolation Valves & Tripped off-gas Sys.Caused by Recombiner Catalyst Migration.Catalyst Was Removed.With1999-06-0707 June 1999
- on 990508,personnel Inserted Manual Scram When Pressure Transient Closed Air Ejector Suction Isolation Valves & Tripped off-gas Sys.Caused by Recombiner Catalyst Migration.Catalyst Was Removed.With
ML20195H0351999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Monticello Nuclear Generatintg Plant.With 05000263/LER-1999-004-01, :on 990422,low Reactor Water Level Scram,Group 2 & 3 Isolations & Subsequent HPCI Became Inoperable.Caused by Feedwater Controller Power Supply Failure.Three Power Supplies Replaced & Connections Cleaned.With1999-05-24024 May 1999
- on 990422,low Reactor Water Level Scram,Group 2 & 3 Isolations & Subsequent HPCI Became Inoperable.Caused by Feedwater Controller Power Supply Failure.Three Power Supplies Replaced & Connections Cleaned.With
05000263/LER-1999-003-01, :on 990412,HPCI & Division 1 ECCS Equipment Were Declared Inoperable Due to Svc Water Pump Failure.Pump Shaft Was Mechanically Freed,Check Valve Was Repaired & Pump Was Successfully Tested.With1999-05-12012 May 1999
- on 990412,HPCI & Division 1 ECCS Equipment Were Declared Inoperable Due to Svc Water Pump Failure.Pump Shaft Was Mechanically Freed,Check Valve Was Repaired & Pump Was Successfully Tested.With
05000263/LER-1999-002-01, :on 990329,event Sequence That Results in Available ECCS Being Reduced to Less than That Assumed in Current Safety Analysis.Caused by Failure of Edg.Plant Operating Procedures Revised.With1999-05-11011 May 1999
- on 990329,event Sequence That Results in Available ECCS Being Reduced to Less than That Assumed in Current Safety Analysis.Caused by Failure of Edg.Plant Operating Procedures Revised.With
ML20206N1721999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Monticello Nuclear Generating Plant.With ML20205N0861999-04-12012 April 1999 Safety Evaluation Re Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20205P5701999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Monticello Nuclear Generating Plant.With ML20205C1651999-03-19019 March 1999 Safety Evaluation Supporting Amend 105 to License DPR-22 ML20204H4951999-03-18018 March 1999 SER Concluding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Monticello.Therefore Staff Concludes Licensee Adequately Addressed Action Required in GL 96-05 05000263/LER-1999-001-02, :on 990215,HPCI High Steam Flow Isolation During Quarterly Surveillance Test Was Noted.Caused by Inadequate Surveillance Procedure.Revised Surveillance Procedure.With1999-03-17017 March 1999
- on 990215,HPCI High Steam Flow Isolation During Quarterly Surveillance Test Was Noted.Caused by Inadequate Surveillance Procedure.Revised Surveillance Procedure.With
ML20205G7391999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Monticello Nuclear Generating Plant.With ML20202F7901999-01-25025 January 1999 1999 Four Year Simulator Certification Rept for MNGP Simulation Facility ML20199E4871999-01-0606 January 1999 SER Accepting Licensee 951116,960214 & 0524 Responses to NRC Bulletin 95-002, Unexpected Clogging of Residual Heat Removal Pump Strainer While Operating in Suppression Pool Cooling Mode ML20205H0561998-12-31031 December 1998 Northern States Power Co 1998 Annual Rept. with ML20199F6211998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Mngp.With ML20198P0691998-12-28028 December 1998 Safety Evaluation Concluding That NSP Proposed Alternative to Paragraph III-3411 of App III to 1986 Edition of Section XI of ASME Code Provides Acceptable Level of Quality & Safety.Alternative Authorized ML20198M8221998-12-24024 December 1998 Safety Evaluation Supporting Amend 104 to License DPR-22 ML20198M6901998-12-23023 December 1998 Safety Evaluation Supporting Amend 103 to License DPR-22 ML20198D0751998-12-10010 December 1998 Safety Evaluation Supporting NSP Proposed Change to EOPs to Use 2/3 Core Height as Potential Entry Condition Into Containment Flooding ML20198B2531998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Monticello Nuclear Generating Plant.With ML20195E3691998-11-12012 November 1998 Safety Evaluation Concluding That Licensee USI A-46 Implementation Has Met Purpose & Intent of Criteria in GIP-2 & Staff Sser 2 for Resolution of USI A-46 ML20195D2381998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Monticello Nuclear Generating Plant.With ML20198J4451998-10-22022 October 1998 Rev 2 to SIR-97-003, Review of Test Results of Two Surveillance Capsules & Recommendations for Matls Properties & Pressure-Temp Curves to Be Used for Monticello Rpv 05000263/LER-1998-005-01, :on 980921,HPCI Was Removed from Service to Repair Steam Leak in Drain Trap by Pass.Caused by Localized Erosion of Valve Body.Valve Was Declared Inoperable & Was Replaced with Manual Valve1998-10-21021 October 1998
- on 980921,HPCI Was Removed from Service to Repair Steam Leak in Drain Trap by Pass.Caused by Localized Erosion of Valve Body.Valve Was Declared Inoperable & Was Replaced with Manual Valve
05000263/LER-1998-004-02, :on 980909,manual Scram Was Inserted Following Pressure Transient Closed Air Ejector Suction Isolation Valves & Trips Offgas Recombiners,Occurred.Caused by Seat Leakage.Leaking Valve Seat Was Reworked1998-10-0909 October 1998
- on 980909,manual Scram Was Inserted Following Pressure Transient Closed Air Ejector Suction Isolation Valves & Trips Offgas Recombiners,Occurred.Caused by Seat Leakage.Leaking Valve Seat Was Reworked
ML20154L3471998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Monticello Nuclear Generating Plant.With ML20153F0511998-09-21021 September 1998 Rev 2 to MNGP Colr,Cycle 19 ML20153E9361998-09-0808 September 1998 Rev 1 to MNGP Colr,Cycle 19 ML20153B0861998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Monticello Nuclear Generating Plant.With ML20151T0981998-08-28028 August 1998 Safety Evaluation Supporting Amend 101 to License DPR-22 ML20237B8461998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Monticello Nuclear Generating Plant ML20236W5041998-07-21021 July 1998 ISI Exam Summary Rept - Refueling Outage 19 ML20236R1941998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Monticello Nuclear Generating Plant ML20249A5861998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Monticello Nuclear Generating Plant 05000263/LER-1998-003-01, :on 980417,transgranular Stress Corrosion Cracking Was Identified in Control Rod Drive Lines.Caused by chloride-induced Transgranular stress-corrosion Cracking. Affected Sections of Two Lines Replaced1998-05-14014 May 1998
- on 980417,transgranular Stress Corrosion Cracking Was Identified in Control Rod Drive Lines.Caused by chloride-induced Transgranular stress-corrosion Cracking. Affected Sections of Two Lines Replaced
05000263/LER-1998-002-02, :on 980415,main Steam Isolation Valve Position Setpoint Outside Allowed Range,Was Found.Caused by Previous Testing Technique & Use of Particular Switch Model.Eight New Position Switches W/Less Deadband Installed1998-05-14014 May 1998
- on 980415,main Steam Isolation Valve Position Setpoint Outside Allowed Range,Was Found.Caused by Previous Testing Technique & Use of Particular Switch Model.Eight New Position Switches W/Less Deadband Installed
ML20247K3971998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Monticello Nuclear Generating Plant 05000263/LER-1998-001-02, :on 980323,discovered Containment Isolation Valve Leakage Exceeded TS Limit.Caused by Foreign Matl Found on Valve Seat.Repaired Subject Valves & Developed Process to Ensure Cleanliness of Testing Equipment1998-04-22022 April 1998
- on 980323,discovered Containment Isolation Valve Leakage Exceeded TS Limit.Caused by Foreign Matl Found on Valve Seat.Repaired Subject Valves & Developed Process to Ensure Cleanliness of Testing Equipment
ML20217E9611998-04-20020 April 1998 Safety Evaluation Supporting Amend 100 to License DPR-22 ML20217D8731998-04-13013 April 1998 Rev 0 to MNGP Colr,Cycle 19 ML20217F6431998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Monticello Nuclear Generating Plant 1999-09-30
[Table view] |
Text
-
e4Ai;R ATIVE.TUMriAR'. OF OPERATI.: ::"ER IENC E
., n..~,m,..
s, e n _,.n;, _ _ _ _ _, _
.. u
- r. we c, J '?____
w i1 e L a_..
., r, >w., e. c,LL w
4
..,l.
- y..Sa0 w.'.
- . L
[.
'1.'
rC L _ A
i m / n. Q. c.. C 4. r.'
i t
.eV *,":. I T..*.1
_. _ _ _ f'wi..i4.Y
~n 5-.i-84 to Continualion of 1791 refueling autage.
C
~*'(
G.A s
s> a vI I.
I.'.
MCta' P O W E i" op si' a t i G n de f i red E.5 essen*ia
.y i -.
0' rdiEd P O u.C r eXCGPi fCr W B C !. E i'.Cl
- l. 0 2 j G CF ~
. ~ >
.r p e c i f ! e d.r u r v e i i l a n c e :ssting.
B407020491 840531 PDR ADOCK 05000263 R
PDR k
i 1
w l^ _", -
-s AVERAGE DAILY' UNIT POWER LEVEL l'
>m e m,. _. _
n b, Cu,._ r, un.
.a
.w
- c..
, + u ~ -v '
h.;.,, A
, ! o,,,,,,,,
Urx.
4 s.1
,s
" r 4.. p a _. _. _ _
.n.As -
4_
COMPLETED B1 A.
L, H> robo c w n n. T Lc
'.x.< n.'
'v c A 54
+rt Il %r JD -/4 d
.4
/a a
I LL4 s 1
.~ t10N TH _._ _
_'M A Y
.. D AY -, AVERAGELDAILY. POWER LEVEL DAY-AVERAGE DAILY FGWER LEVEL
- (hWe-Net).
(Mue-Not) 1,>
>1
-_a______.___._
5o
_m_ _ _ _. _
o w
r m-
= _-_ _ _ _. _ _ _ _ _.
c__
.s-
_m-ia s4.
o_________._
o_g
_a.___.__.___
,4 4
.=
1________
u i_____._ ___
^
A.
_o___________
_a o
. _._________- ~
m.
7.
,a o
1____.________
_ _._ _._ _ _ _ _ = -
._N 6.
..;.o__
..7. 4 -
0 me o:
, _ o _ _ _._._.. _ _ _ _ _
.~
s:
e.
-i,s
,6.
__._.______H__.___._
+ 3,s.~.j e'.
4
._j__.__
qp
- 1 i;.-
o_
_n,
o_._.___._
b' '.
_ _ _. _ _ _ _ _ _. - si _._. _.___
^ a
- e. k.
_. ~. _ _ _. _ _. _
._.U~
_________.4.__________._
_t f.?
- _.______-g, a-
. _ _ _ _. ~ _. _ _. _.. _
x
_j__ __.__ ____
m.
l_
. j ;4 s
w
._o_1__________
1 a
.s
. -. 1 6:.-
+
INSTRUC'T IONS _ ;
l.
g 5
t.
T Ld a p'- i n't he ir ep o r t ilig aanth.
Compnte to the nearest whole,m.3aart.
2 2
'b..,.a
w-i i
'CPERATING DATA REPORT 3.
..s yU
- g m. e, pu.
- w. _, <. :
, v
(
DATE 6-
- -:3 4 _ _ _ _
a
- b. r;.x., e g.,
-y c '
.4.
t
... f5
<M A o t
r.,...,,
y-r.. :... r.c u Lw r
<. i. n.. ee ~ c r._ r 4. c,
..-n.
bg^.
OPERATING STATUS-
! Notes
- d. Unit Name Monticei.i.o
- 2. Reporting _ period:
___________________MAY
~
1 Licensed Therma L Power (MWt)
______1670 1
'4.' Nameplate-Rating-(Gross MWe)-
.________.__.___569 I
A Design Electrical Rating (Net MWe)
__._.__545.4
- 6. Meximum Depenoab'Le-Capacity (Gross MUe)
_553 7.LMaximum: Dependable Capacity (Net MWe)
___ 525 Sa If Changes ~0ccur in Capacity Ratings (Items Number 3 Through 7: E : nn Last Report, Give Reasons:
__N/A_____________________________________________
'?. Power Levet?To-Which Restricted, If Any (Net MWe'
__._N/A._
i0.-Reatons For Res,ricticns, If Any:
__N/A________
Tni Month
-to-Date Cu;. ult-ive fit Ihr s In Reporttag Period
_?44
_ _._ _. 3 W7
_1E6
- 12. Number Of Hours Reactor Was Critical 0.0
- 'O-
._ 3??15.4
- 13. heactor Reserve Shutdown Hours
_.____G.O
_ _ _. v. i 0 4 C '
incHours1 Generator On-Line 0.0
__ 006.3 39003.0
- 15. Unit Reserve. Shutdown-Hourr
_.__ G.9 9. ':
. _ _ _0.0
'id.
Grass-Thermal Energy Generated (MWH) 0 377998
_' h 2338i 4 i~. Gross Electrical Energy Generated ( riWH ). _ _
C 2?6.i~
_. _451250 L'3 iA Net ELectricaI, Ener9y Generated (MWH)
_ 27552'
.__ FJi97235 a _-
- y. Li n i i ~ -.,,ervice e, actor m
w yy av.
Unit Ava..,i. ability bactor s v.e u.. '
,.i
- 21. Unit Capacity Factor (USing MDC Net)
._ - 0. 3 "!
. _ _ _ 1 4. 2 ".
_ _. _ 72 U Capacity Factor (Using DER Net)
-0.3%
4.ia
_ _ _. _ ri.it
- h. Unit Unit" Forced Outage Rate G. G *!
0.0L 5d
$a.< Shutdowns Scheduled Over Next i2 Months (Type h t e:, a n c' Dura-Tuh
__ February 3, 1904 - Refueling Outage - 264 de' N If Shut Down At.End Of Report Period, Estima ad DatE Of JFr s.
- ' - J 1 "' t
$6..Ur,iis In Test Status (Prier to Commerc,e Gre. ticn:
N r-
- F : 1.; W i c TT INITIAL CRITICALITY L.t_c..s,r e,6 v + errr.,
e n
m 7,l.L i 1 L.,
1st ir
D,O C C ^ T.
e n u,.m r,.c.T h s M
Le i a5H L. w I al a>w J.
Ac u.
.=
3 19 UNITSilCIDOWNS AND POWER REDUCTIONS DOCKET NO.
50-263
, '. c i
UNIT NAME Monticello DATE 6-6-84 REPORTMONTij MAY COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151
-a E c:
=
r.
h Date j _g g
- 3j Le.gensee 57,,
g 9.,
Cause & Corrective 2=
t, y =:
Esen E-3 Auion to nb Prevent Recurrence
$E 5
ji Repur
~ *
=
2 2-3-84 S
744 C
1 N/A ZZZZ ZZZZZZ Continuatiion of 1984 t.+:ieling outage I
3 4
F: Fmced Reason.
Method:
Exlubit G Instructions S: Schedu!cd A. Equipment Failure (Explain)
! 41anual for Preparation of Data B-Maintenance of Test 241anual Seram.
Entry Sheets for Licensee C Refueling 3 Automatie S6 tam.
Event Report (LER) File tNUREG-D Regulatory Restriction 4-Ot her ( Explain) 0161)
E-Operator Trainmg & Licen>e Examination F-Administrati.e 5
G Operational Eiror (Explaial Exhibii 1 - Same Source es/77) 11 Other (Explain)
O Northem States Power Company 414 Nicollet Mall Minneapohs. Minnesota 55401 Telephone (612) 330-5500 June 13, 1984
/
Director, Of fice of Resource Management U S Nuclear Regulatory Commission Uashington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report Mav, 1984 Attached are twelve copies of the Monthly Operating Report for May, 1984 for the Monticello Nuclear Generating Plant.
D j M. _O David Musolf Manager of Nuclear Sup ort Services DMM/bd cc:
Regional Administrator-III NRC NRR Project Manager, NRC NRC Resident Inspector MPCA Attn: J W Ferman Attachment 11GW 8