7 __
b.60-C/
o i
g General Offices
- Selden Street, Berlin, Connect; cut J
.37Cy,7,"c c"c"o,,"
P.O. BOX 270 HARTFORD. CONNECTICUT 06141-0270 at,og u,
,o co,
= Ast uvu sE= cxn,-
(203) 666-6911 g
=s0RbtEALT eluCLEA. E*EAGYConem L
g e
June 20,1984 Docket No. 50-423 F0529A Dr. Thomas E. Murley Regional Administrator Region I U. S. Nuclear Regulatory Commission 631 Park Street King of Prussia, PA 19406
Reference:
(1)
W. G. Counsil to T. E. Murley, F0467A, dated Feburary 15, 1984.
(2)
W. G. Counsil to T. E. Murley, F0493A, dated March 23,1984.
Millstone Nuclear Power Station, Unit No. 3 Reporting of Potential Significant Deficiencies In Design and Construction:
Phase-to-Phase Electric Fault in a Motor Control Center (SD-50)
In a January 16, 1984 telephone conversation between the NRC Resident inspector, Mr. T. Rebelowski and our Mr. D. B. Vail, Northeast Nuclear Energy Company (NNECO) reported a potential significant deficiency in ~ the construction of Millstone Unit No. 3 as required by 10CFR50.55(e).
Subsequently, this was followed up with another telephone conversation with your Mr.T. Elsasser on Janaury 17, 1984. The potential significant deficiency involves a phase-to-phase electrical fault which occurred in a motor control center (MCC) supplied by Gould, Inc. while a technician was testing with a clamp-on ammeter.
The fault occurred between adjacent phases of the uninsulated cable adapters used to terminate oversized cables to MCC circuit breakers and starters.
We have received the seismic qualification data from Gould, Inc. regarding the uninsulated cable adapters which were used to terminate oversized cables to the MCC circuit breakers and starters. This information is presently being reviewed by our architect-engineer, Stone & Webster Engineering Corporation.
8407020324 840620 I'
PDR ADOCK 05000423 S
PDR I O e
A km 5
W
\\
yt r-1.q.
\\'
QL Y
y.
.;.s si.
t Q.
xWe are not able to provide you with a final report at this time. Our next report
~
+
~ will be provided to you by August 2,'1934.
"*s.
- Very truly yours, s.
&jp gy S
U
.NORTHEA T N CLEAR ENERGY COMPANY
'y i, I
J.
Aum j'Q S
W. G.'Counsil ~
- ,'y a Senior Vice President 3
t
. L k
l} ~ ~
c. i _'
- cch #Mr. P, C. DeYoung, Director -
Division of Inspection and Enforcement
. sjg U. S. Nuclear Regulatory Commission Phillips Building dp i
7920 Norfolk Avenue t
S Bethesda, MD 20014 t--
M '~
t f
I a
,. (.,
4s i
i*
5.
4 i
T
. g.-
l! l}'
e
,m,o g,
ad i r -
4
(, C 3.
+
i. ;,'.
. j -*
T I
J' h
_