V.
4 Beaver Valley Power Station
- ="mt* *"-
(412) 643-8069 FAX
'GEORGES. THOMAS.
o,s. ion v,c. er...oent Uj'NNimion -
September 20,'1995 i
4
- U. S. Nuclear Regulatory Commission
. Attention: Document Control Desk Washington, DC 20555-0001
Subject:
Beaver Valley Power Station, Unit No. 2 Docket No. 50-412, License No. NPF-73 Boration Systems Technical Specification Bases Change Attached is a change to Technical Specification Bases 3/4.1.2, which involves replacing "EOL" and " equilibrium" with "BOL" and " peak", respectively, and is based on a change in methodology and assumptions used for calculating boration requirements.
The need for this change was identified during a conference call on this subject between the NRC staff members, Westinghouse and Beaver Valley staff, and is consistent with a similar change incorporated in the Unit 1 technical specifications, submitted by Duquesne Light Company on February 28,1995, and approved by the NRC on June 1, 1995. Additionally, the Unit 2 borated water volumes have been evaluated and it has been determined that the current volumes are conservative; therefore, no change to these
. volumes is required. Based on the above, it is requested that the Commission issue the enclosed revised Bases page B 3/41-3 for inclusion in the technical specifications.
Sincerely,
- /c wS s
George S. Thomas Enclosure c:
Mr. L. W.' Rossbach, Sr. Resident Inspector Mr. T. T. Martin, NRC Region I Administrator Mr. D. S. Brinkman, Sr. Project Manager NC CO[j -
9509290331 950920 DR ADOCK 05000412 lI ;