ML20092L684

From kanterella
Jump to navigation Jump to search
Forwards PINGP Unit 2 ISI Summary Rept for Refueling Outage 17 for Third Period of Second 10-yr Interval & First Period of Third 10-yr Interval
ML20092L684
Person / Time
Site: Prairie Island Xcel Energy icon.png
Issue date: 09/25/1995
From: Wadley M
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20092L686 List:
References
NUDOCS 9509280139
Download: ML20092L684 (2)


Text

,.,,, _

Northem States Power Company Prairie island Nuclear Generating Pier t 1717 Wakonade Dr. East Welch, Minnesota 55089 September 25, 1995

.S.,S Nuc' lear R,egulatory Commission pgtesi

[ Control?Deskyppmww Washington, DC'205$5"*Mi+LP PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket No. 50-306 License No. DPR-60 Unit 2 Inservice Inspection Summary Report Kafuelino Outace No. 17 During the 1995 Prairie Island Unit 2 refueling outage (Refueling Outage No.

17), an inservice inspection (ISI) examination for the third period of the second 10-year interval and for th= first period of the third 10-year interval was conducted. Attached for yot

. formation are four copies of the ISI examination Summary Report for t, period.

The report identifies components examined, the examination methods used, the examination number, and summarizes the results. All anomalies were either corrected or an engineering evaluation was performed to accept "as is" conditions. A description of the corrective work and the corresponding work request numbers are provided in the ASME Section XI Repair / Replacement portion of the report.

This Summary Report is being submitted in accordance with the Prairie Island ASME Code Section XI Inservice Inspection and Testing Program and ic intended to satisfy the inspection reporting requirements contained in IWA-6220 of the ASME Boiler and Pressure Vessel Code.

Sincerely, b ('

G%

G)

Michael D wadley Plant Manager Prairie Island Nuclear' Generating Plant c: (see next page) f

}

t y

..c.*.,,,,.

s>rs 9509290139 950925 I

PDR ADOCK 05000306 l

.Q.

PDR

q 'l 1

S NRC-

September ~ 25,.1995

]

Page.2c-c:l Regional Administrator'III, NRC (2 copies of attachment)

NRR Project Manager,'NRC (1 copy of attachment)

Senior Resident-Inspector, NRC (w\\o attachment)

-.J E Silberg.(w\\o' attachment) i Chief l Boiler Inspector, State of MN'(1 copy of attachment)

! Paul Fisher,' Hartford Ins. (1. copy of attachment)

Attachment:

Unit 2 ISI Summary Report, dated September.21, 1995 k

1 1

e

.r i -

h.

g, 7'

gL

- - -