ML20092K374
| ML20092K374 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 06/04/1984 |
| From: | Foster D GEORGIA POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| GN-370, NUDOCS 8406280305 | |
| Download: ML20092K374 (2) | |
Text
Georg:a Powe' Ccccaay p Q f.
Routa 2. Box 299A 4
0FFgciAL COPY Wayn;scoro. Georgia 3C830 Tvecrone 404 554 9961. Est 3360 404 724 811J Ext 3360 Georgia Power
- o. o. mi-r, ih,* ] {
- ag;a;o Protect i 's soavve.
June 4, 1984 United States Nuclear Regulatory Commission File:
Office of Inspection and Enforcement Log:
GN-370 Region II - Suite 3100 101 Marietta Street Atlanta, Georgia 30303
Reference:
VogtleElectricGeneratingPlant-Units 1and2,50424),50-425; Nuclear Service Coaling Water Supply and Return Pip Attention: Mr. James P. O'Reilly
~
Gentlemen:
On May 3,1984, Mr. R. E. Folker of Georgia Power Company notified Mr. John Rogge of the USNRC of a potentially reportable condition involving g
a suspected difference in the settlement of foundations of nuclear service cooling water tower and nearby valve houses. This suspected settlement difference may lead to an overstressed condition in the piping systems connecting the nuclear service cooling water towers.
At this time, the evaluation for the reportability of this subject is continuing.
Based upon information and schedules supplied by our archi-tect engineers, Georgia Power Company expects to submit a final report to the NRC on this subject by September 14, 1984.
This response contains no proprietary information and may be placed in the NRC Public Document Room upon receipt.
Yours,truly,'
5 D. OT Fo,s e#
r REF/DOF/tdm xc:
U. S. Nuclear Regulatory Comission Document Control Desk Washington, D. C.
20555 R. J. Kelly D. E. Dutton J. A. Bailey L. T. Gucwa R. E. Conway W. F. Sanders
- 0. Batum M. Malcom G. F. Head R. H. Pinson G. Bockhold H. H. Gregory. III C. W. Hayes P. D. Rice B. M. Guthrie J. T. Beckham, Jr.
D. N. MacLemore R. A. Thomas E. D. Groover J. L. Vota OV@cthb 840628039 840604 PDR ADOCl 05000424 g'2 S
PDR i 0
h Georg a Powe Company Route 2. Box 299A PRP OCL7?OWAN si mo 0FFICIAL COPY 404 724 8114. Ext 3360 i
All : 03 Georgia Power
- o. o.ro.i.,
$n*e$IINnSc^*'
ce souven e;ecinc saem Vogtle Pr0;ect June 4, 1984 United States Nuclear Regulatory Commission File:
X78G03-M63 Office of Inspection and Enforcement Region II - Suite 3100 101 Marietta Street Atlanta, Georgia 30303
Reference:
Vogtle Electric Generating Plant-Units 1 and 2, 50-m-e0-425; Nuclear Service Cooling Water Supply and Return Piping Attention: Mr. James P. O'Reilly Gentlemen:
On May 3,1984, Mr. R. E. Folker of Georgia Power Company notified Mr. John Rogge of the USNRC of a potentially reportable condition involving a suspected difference in the settlement of foundations of nuclear service cooling water tower and nearby valve houses. This suspected settlement difference may lead to an overstressed condition in the piping systems connecting the nuclear ss,1ce cooling water towers.
At this time, the evaluation for the reportability of this subject is continuing. Based upon information and schedules supplied by our archi-tect engineers, Georgia Power Company expects to submit a final report to the NRC on this subject by September 14, 1984.
This response contains no proprietary information and may be placed in the NRC Public Document Room upon receipt.
Your truly,, '
/(
,A j
/
D.O.iste'r REF/00F/tdm xc:
U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C.
20555 R. J. Kelly D. E. Dutton J. A. Bailey L. T. Gucwa R. E. Conway W. F. Sanders
- 0. Batum M. Malcom G. F. Head R. H. Pinson G. Bockhold H. H. Gregory, III C. W. Hayes P. D. Rice B. M. Guthrie J. T. Beckham, Jr.
D. N. MacLemore R. A. Thomas E. D. Groover, J. L. Vota CO
- %4.lo
-