.c -
, p@ uo u
[~
ft UNITED STATES E
NUCLEAR REGULATORY COMMISSION f
WASHINGTON, D.C. 2066H001
\\...../
PUBLIC SERVICE ELECTRIC & GAS COMPANY PHILADELPHIA ELECTRIC COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-272 SALEM NUCLEAR GENERATING STATION. UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.177 License No. DPR-70 1.
The Nuclear Regulatory Commission (the Commission or the NRC) has found that:
A.
The application for amendment filed by the Public Service Electric &
Gas Company, Philadelphia Electric Company, Delmarva Power and Light Company and Atlantic City Electric Company (the licensees) dated January 21, 394, as supplemented June 28 and September 13, 1994, and April 4, 1995, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance: (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of i.he public; and E.
The. issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-70 is hereby amended to read as follows:
9509220239 950919 ADOCK0500g2 PDR P
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 177, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
l 3.
This license amendment is effective as of its date of issuance, to be implemented within 60 days.
FOR THE NUCLEAR REGULATORY COMMISSION Jo F. Stolz, Director Pr fect Directorate l' ivision of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: September 19, 1995 i
ATTACHMENT TO LICENSE AMENDMENT NO.177 FACILITY OPERATING LICENSE NO. DPR-70 DOCKET NO. 50-272 Revise Appendix A as follows:
Remove Paaes Insert Paaes 3/4 8-8 3/4 8-8
[
3/4 8-9 3/4 8-9 3/4 8-9a 3/4 8-9b i
i
l ELECTRICAL POWER SYSTEMS 125-VOLT D.C.
DISTRIBUTION - OPERATING LIMITING CONDITION FOR OPERATION 3.8.2.3 The following D.C. bus trains shall be OPERABLE and energized:
i TRAIN 1A consisting of 125-volt D.C. bus No. lA, 125-volt D.C. battery No. 1A and battery charger 1A1.
l TRAIN 1B. consisting of 125-volt D.C. bus No.1B, 125-volt D.C. battery No. 1B and battery charger 1Bl.
l TRAIN 1C consisting of 125-volt D.C. bus No. 1C, 125-volt D.C. battery No. 1C and battery charge IC1.
l i
APPLICABILITY: MODES 1, 2, 3 and 4.
ACTION:
a.
With one 125-volt D.C. bus inoperable or not energized, restore the inoperable bus to OPERABLE and energized status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />, b.
With one 125-volt D.C. battery charger inoperable, restore the inoperable charger to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or connect the backup charger for no more than 7 days or be in at least HOT STANDBY l
within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
c.
With one or more 125-volt D.C. batteries with one or more battery cell parameters not within the Category A or B limits of Table 4.8.2.3-1:
1.
Verify within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, that the electrolyte level and float voltage for the pilot cell meets Table 4.8.2.3-1 Category C limits, and 2.
Verify within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, that the battery cell parameters of all connected cells meet Table 4.8.2.3-1 Category C limits, and 3.
Restore battery cell parameters to Category A and B limits of Table 4.8.2.3-1 within 31 days, and 4.
If any of the above listed requirements cannot be met, comply with the requirements of action f.
d.
With one or more 125-volt D.C. batteries with one or more battery cell parameters not within Table 4.8.2.3-1 Category C values, comply with the requirements of action f.
e.
With average electrolyte temperature of representative cells less than 65'F, comply with the requirements of action f.
f.
Restore the battery to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SALEM - UNIT 1 3/4 8-8 Amendment No.177 g
i w
1 l
ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS 4.8.2.3.1 Each D.C. bus train shall be determined OPERABLE and energized at I
least once per 7 days by verifying correct breaker alignment and power availability, j
4.8.2.3.2 Each 125-volt battery and above required charger shall be demonstrated OPERABLE:
a.
At least once per 7 days by verifying that:
1.
The parameters in Table 4.8.2.3-1 meet Category A limits.
2.
The overall battery voltage is greater than or equal to 125 volts on float charge.
b.
At least once per 92 days and once within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after a battery discharge < 110 V and once within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after a battery overcharge
> 150 V by verifying that the parameters in Table 4.8.2.3-1 meet the Category B limits.
c.
At least once per 92 days by verifying that:
1.
There is no visible corrosion at term'inals or connectors or the connection resistance is:
s150 micro ohms for inter-cell connections, s350 micro ohms for inter-rack connections, s350 micro ohms for inter-tier connections, s70 micro ohms for field cable terminal connections, and s2500 micro ohms for the total battery connection resistance which includes all inter-cell connections (including bus bars), all inter-rack connections (including cable resistance) all inter-tier connections (including cable resistance) and all field terminal connections at the battery.
2.
The average electrolyte temperature of the representative cells is above 65'F.
d.
At least once per 12 months by verifying that:
1.
The cells, cell plates and battery racks show no visual indication of physical damage or abnormal deterioration.
2.
Remove visible terminal corrosion and verify cell-to-cell and terminal connections are coated with anti-corrosion material.
1 i
SALEM - UNIT 1 3/4 8-9 Amendment No 177 l
= --
4 ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)
)
3.
The connection resistance is:
150 micro ohms for inter-cell connections, s 350 micro ohms for inter-rack connections, s 350 micro ohms for inter-tier connections, 4
s 70 micro ohms for field cable terminal connections, and K 2500 micro ohms for the total battery connection resistance which includes all inter-cell connections (including bus bars),
all inter-rack connections (including cable resistance), all inter-tier connections (including cable resistance), and all field terminal connections at the battery.
I e.
At least once per 18 months by verifying that the battery charger will supply at least 200 amperes at 125 volts for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
f.
At least once per 18 months, during shutdown, by verifying that the j
battery capacity is adequate to supply and maintain in OPERABLE status all of the actual or simulated emergency loads for the design 1
i duty cycle when the battery is subjected to a battery service test.
1 I
4 g.
At least once per 60 months, during shutdown, by verifying that the l
battery capacity is at least 80% of the manufacturer's rating when i
subjected to a performance discharge test.
Satisfactory completion a
of this performance discharge test shall also satisfy the requirements of Specification 4.8.2.3.2.f if the performance l
discharge test is conducted during a shutdown where that test and the battery service test would both be required.
l h.
At least once per 12' months, during shutdown, if the battery shows signs of degradation gg has reached 85% of the service life with a capacity less than 100% of manufacturers rating, by verifying that the battery capacity is at least 80% of the manufacturer's rating when subjected to a performance discharge test.
Degradation is indicated when the battery capacity drops more than 10% of rated capacity from its capacity the previous performance test, or is below 90% of the manufacturer's rating.
i 1.
At least once per 24 months, during shutdown, if the battery has j
reached 85% of the service life with capacity greater than or equal i
to 100% of manufacturers rating, by verifying that the battery j
capacity is at least 80% of the manufacturar's rating when subjected i
to a performance discharge test.
l l
SALEM - UNIT 1 3/4 8-9a Amendment No. 177
1 ELECTRICAL POWER SYSTEMS i
SURVEILLANCE REQUIREMENTS (Continued) i
........a.....................................................................
i Table 4.8.2.3-1
)
Battery Cell Parameters Requirements l
CATEGORY As CATEGORY C j
LIMITS FOR EACH CATEGORY B:
ALLOWABLE VALUE DESIGNATED PILOT LIMITS FOR EACH FOR EACH l
PARAMETER CELL CONNECTED CELL CONNECTED CELL 1
Electrolyte
> Minimum level
> Minimum level Above top of i
level indication mark, indication mark, plates, and not and s 1/4 inch and 5 1/4 inch overflowing above maximum above maximum j
level indication level indication mark (a) mark (a) a Float Voltage 2 2.13 V 2 2.13 V k 2.07 Y i
Specific 2 1.195 2 1.190 Not more than 0.020 Gravity AND below average of all 3
(b) (c)
Average of all connected cells connected cells AND 2 1.200 Average of all connected cells k 1.190 (a)
It is acceptable for the electrolyte level to temporarily increase above the specified maximum level during equalizing charge provided it is not overflowing.
(b)
Corrected for electrolyte temperature and level. Level correction is not i
required, however, when battery charging is < 3 amps when on float charge.
(c) Or battery charging current is < 3 amps when on float charge.
This is acceptable only during a maximum of 7 days following a battery recharge.
d 4
i i
i SALEM - UNIT 1 3/4 8-9b Amendment No.177
. c,# "%
p* _
4 UNITED STATES 3
S NUCLEAR REGULATORY COMMISSION f
WASHINGTON, D.C. 20546 4001
%...../
PUBLIC SERVICE ELECTRIC & GAS COMPANY PHILADELPHIA ELECTRIC COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-311 SALEM NUCLEAR GENERATING STATION. UNIT NO. 2 j
AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.158 4
License No. DPR-75 1.
The Nuclear Regulatory Comission (the Comission or the NRC) has found that:
A.
The application for amendment filed by the Public Service Electric &
Gas Company, Philadelphia Electric Company, Delmarva Power and Light Company and Atlantic City Electric Company (the licensees) dated January 21, 1994, as supplemented June 28 and September 13, 1994, and April 4,1995, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-75 is hereby amended to read as follows:
(2) Technical Soecifications and Environmental Protection Plan The Technical Specifications contained in Appendices A and B, as revised through Amendment No. ISS, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment'is effective as of its date of issuance, to be implemented within 60 days.
FOR THE NUCLEAR REGULATORY COMMISSION J n F Stolz, Directo Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: Septenber 19, 1995 i
i i
1 l
ATTACHMENT TO LICENSE AMENDMENT NO.158 FACILITY OPERATING LICENSE NO. DPR-75 l
DOCKET NO. 50-311 Revise Appendix A as follows:
Remove Paaes Insert Paoes 3/4 8-10 3/4 8-10 3/4 8-11 3/4 8-11 3/4 8-lla 3/4 8-11b t
J i
4 9
w e
e
kK
' ELECTRICAL POWER SYSTEMS 125 VOLT D.C; DISTRIBUTION - OPERATllN LIMITING CONDITION FOR OPERATION l ~
The following D.C. bus trains shall be OPERABLE and energized:
{
3.8.2.3-TRAIN'2A consisting of 125-volt D.C. bus No. 2A, 125-volt D.C.; battery
/
No. 2A and battery charger.2A1.
l i
TRAIN 2B consisting of 125-volt D.C. bus No. 2B, 125-volt D.C. battery i
No. 2B and battery charger 2Bl.
TRAIN 2C ' consisting of 125-volt D.C. bus No. 2C, 125-volt D.C. battery No. 2C and battery charger 2C1.
l
?
APPLICABILITY: ' MODES 1, 2, 3 and 4.
i ACTION:
i a.
With one 125-volt D.C. bus inoperable or not energized, restore the
{
inoperable bus to OPERABLE *and energized status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be l
in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />, j
i b.
With one 125-volt D.C. cattery. charger inoperable, restore the i
l' inoperable charger to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or connect the I
backup charger for no more than 7 days or be'in at least HOT STANDBY
{
within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTOOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
c.
With one or more 125-volt D.C. batteries with one or more battery cell parameters not within the Category A or B limits of Table 4.8.2.3-1:
.l 1.
Verify within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />,'that the electrolyte level and float l
voltage for the pilot cell meets Table 4.8.2.3-1 Category C-limits, and 2.
Verify within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, that the battery cell parameters of all connected cells meet Table 4.8.2.3-1 Category C limits, and 3.
Restore battery cell parameters to Category A and B limits of Table 4.8.2.3-1 within 31 days, and 4.
If any of the above listed requirements cannot be met, comply with the requirements of action f.
I d.
With one or more 125-volt D.C. batteries with one or more battery cell parameters not within Table 4.8.2.3-1 Category C values, comply
'with-the requirement's of action f.
.ei With average electrolyte temperature of representative cells less i
than 65'F, comply with the requirements of action f.
f.
Restore the battery to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6. hours and COLD SHUTDOWN within j
the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />'.
SALEM - UNIT 2-3/4'8-10 Amendment No.158 l
l 1
o
ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS 4.8.2.3.1 E&ch D.C. bus train shall be determined OPERABLE and energized at least once per 7 days by verifying correct breaker alignment and voltage on the bus.
4.8.2.3.2 Each required 125-volt battery and charger shall be demonstrated OPERABLE:
a.
At least once per 7 days by verifying that:
- 1. The parameters in Table 4.8.2.3-1 meet Category A limits.
- 2. The overall battery voltage is greater than or equal to 125 volts on float charge.
b.
At least once per 92 days and once within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after a battery discharge < 110 V and once within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after a battery overcharge 150 V by verifying that the parameters in Table 4.8.2.3-1 meet the Category B limits.
1 c.
At least once per 92 days by verifying that:
1.
There is no visible corrosion at terminals or connectors or the connection resistance ist s150 micro ohms for inter-cell connections, s350 micro ohms for inter-rack connections, s350 micro ohms for inter-tier connections, s70 micro ohms for field cable terminal connections, and s2500 micro ohms for the total battery connection resistance which includes all inter-cell connections (including bus bars), all inter-rack connections (including cable resistance) all inter-tier connections (including cable resistance) and all field terminal connections at the battery.
2.
The average electrolyte temperature of the representative cells is above 65'F.
J d.
At least once per 12 months by verifying that:
a 1.
The cells, cell plates and battery racks show no visual indication of physical damage or abnormal deterioration.
l 2.
Remove visible terminal corrosion and verify cell-to-cell and l
terminal connections are coated with anti-corrosion material, i
3 1
SALEM - UNIT 2 3/4 8-11 Amendment No 158 l
1, =
ELECTRICAL POWER SYSTEMS 1
- SURVEILLANCE REQUIREMENTS (Continued) l 3.
The connection resistance is:
l s
150 micro ohms for inter-cell connections, j
s 350 micro ohms for inter-rack connections, 5
350 micro ohms for inter-tier connections, 1
5 70 micro ohms for field cable terminal connections, and 5 2500 micro ohms for the total battery connection resistance which includes,all inter-cell connections (%ncluding bus bars),
all inter-rack connections (including cable resistance), all inter-tier connections (including cable resistance), and all l
field terminal connections at the battery.
i e.
At least once per 18 months by verifying that the battery charger d
will supply at least 200 amperes at 125 volts for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
f.
At least once per 18 months, during shutdown, by verifying that the battery capacity is adequate to supply and maintain in OPERABLE status all of the actual or simulated emergency loads for the design duty cycle when the battery is subjected to a battery service test.
l g.
At least once per 60 months, during shutdown, by verifying that the l
j battery capacity is at least 80% of the manufacturer's rating when i
subjected to a performance discharge test.
Satisfactory completion of this performance discharge test shall also satisfy ths j
requirements of Specification 4.8.2.3.2.f if the performance l
discharge test is conducted during a shutdown where that test and l
the battery service test would both be required.
1 h.
At least once per 12 months, during shutdown, if the battery shows j
signs of degradation QB has reached 85% of the service life with a j
capacity less than 100% of manufacturers rating, by verifying that l
the battery capacity is at least 80% of the manufacturer's rating when subjected to a performance discharge test.
Degradation is indicated when the battery capacity drops more than 10% of rated capacity from its capacity on the previous performance test, or is
}
below 90% of the manufacturer's rating.
i l
i.
At least once per 24 months, during shutdown, if the battery has l
reached 85% of the service life with capacity greater than or equal l
to 100% of manufacturers rating, by verifying that the battery l
j capacity is at least 80% of the manufacturer's rating when subjected j
to a performance discharge test.
I l
J i
i l
SALEM - UNIT 2 3/4 8-11a Amendment nu. 15R 1
ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)
Table 4.8.2.3-1 Battery Cell Parameters Requirements CATEGORY As CATEGORY C
- LIMITS FOR EACH CATEGORY B:
ALLOWABLE VALUE DESIGNATED PILOT LIMITS FOR EACH FOR EACH PARAMETER CELL CONNECTED CELL CONNECTED CELL Electrolyte
> Minimum level
> Minimum level Above top of level indication mark, indication mark, plates, and not and 5 1/4 inch and n 1/4 inch overflowing above maximum above maximum level indication level indication mark (a) mark (a) 1 Float Voltage 2 2.13 V 2 2.13 V 2 2.07 V l
1 Specific 2 1.195 2 1.190 Not more than 0.020 Gravity AND below average of all (b) (c)
Avernge of all connected cells j
connected cells AND 1
I 2 1.200 Average of all l
connected cells j
k 1.190 (a)
It is acceptable for the electrolyte level to temporarily increase above the specified maximum level during equalizing charge provided it is not overflowing.
I (b) Corrected for electrolyte temperature and level.
Level correction is not required, however, when battery charging is < 3 amps when on float charge.
i (c) or battery charging current is < 3 amps when on float charge. This is acceptable only during a maximum of 7 days following a battery recharge.
4 I
SALEM - UNIT 2 3/4 8-11b Amendment NO. 158 9
n
- -