ML20092J525

From kanterella
Jump to navigation Jump to search
Forwards Rept NIS-1-00011, ISI Summary Rept for Grand Gulf Nuclear Station Unit 1 for Period Ending W/Seventh Refueling Outage.Rept Contains Overall Summary of ISIs Performed Since 931204-950620
ML20092J525
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 09/18/1995
From: Hutchinson C
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20092J527 List:
References
GNRO-95-00107, GNRO-95-107, NUDOCS 9509220188
Download: ML20092J525 (2)


Text

.r 3

g Ent:r;y Operntlin?, ins.

1 e - ENTERGY eo e*x 758 Port G bson, MS 39150 Tei 601437 2800 C. R. Mutchinson vce hesnmt Orx Yons September 18, 1995 eam oe Nas aa*>n U.S. Nu lear Regulatory Commission Mail Station P1-37 Washington, D.C.

20555 Attention:

Document Control Desk

Subject:

Grand Gulf Nuclear Station Docket No. 50-416 License No. NPF-29 Inservice Inspection Summary Report GNRO-95/00107 Gentlemen:

The attached Report Number NIS-1-00011 provides the Inservice Inspection (ISI) Summary Report for the period ending with the seventh refueling outage (RF07) for Grand Gulf Nuclear Station (GGNS).

This report is provided in accordance with the requirements of ASME Section XI, Article IWA-6000, which is incorporated by reference into 10CFR50.55a(g).

Report Number NIS-1-00011 contains an overall summary of inservice inspections performed since December 4, 1993 to June 20, 1995 on the CGNS Unit 1 reactor pressure vessel, piping, components, and component supports.

NIS-2 Forms, which provide information concerning ASME Section XI repairs and replacements, are also included.

All open items identified in this report are listed on Pages 71 and 72.

The resolution of these items will be reported in NIS-1-00012 after RF08.

Please note that for the purpose of this report under ASME Section XI requirements, Entergy Operations, Inc. is considered to be the " Owner" of GGNS.

If additional information is required, please contact this office.

Yours truly, CRH/WBA/mtc attachment:

Inservice Inspection Summary Report cc:

(See Next Page) t hl/

I G9509121 9509220188 950918

/

PDR ADOCK 05000416

(

_Q_

.PDR

September 18, 1995-GNRO-95/D0107

.Page 2 of 3-F cc:-

Mr. J. E. Ted:.~ow (w/a) l Mr. H. W. Keiser (w/o)

Mr. R. B. McGehee (w/o)

Mr. N. S. Reynolds (w/o)

Mr. H. L. Thomas (w/o)

Mr. Stewart D. Ebneter (w/a)

Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta St.,

N.W., Suite 2900 Atlanta, Georgia 30323 Mt. P. W. O'Connor, Project Manager (w/2)

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 13H3 Washington, D.C.

20555 Mr. L. J. Callan-(w/a)

Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 l

'G9509121 1

.