Responds to NRC Re Violations Noted in IE Insp Rept 50-293/84-06.Corrective Actions:Supervisor Reprimanded & Admitted Error in Allowing Workers to Enter High Radiation Area on 840215.Incident Described at Meeting W/Bechtel
ML20092H968
Person / Time
Site: Pilgrim
Issue date: 05/16/1984
From: Harrington W
BOSTON EDISON CO.
To: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20092H958 List:
References
NUDOCS 8406260321
Download: ML20092H968 (2)


Text

--

BOSTON EOisON C OM PANY 800 BovLaTON STREET BOSTON. MASSACHUSETTS 02199 WILLIAM D. HARRINGTON May 16,1984 -

e............,

BECo Ltr. #84-071

  • =^"

Mr. Thomas T. Martin Division of Engineering and Technical Programs Region I U.S. Nuclear Regulatory Consnission 631 Park Avenue King of Prussia, PA 19406 License No. DPR-35 Docket No. 50-293

Subject:

Inspection 84-06

References:

(a) NRC Letter to Boston Edison, dated April 27, 1984

Dear Sir:

This letter responds to a violation identified during a routine safety inspection conducted between February 13 and February 17, 1984 and-consnunicated to Boston Edison Company in Appendix A of the above-referenced letter.

Notice of Violation "A" (VIO 84-06-02)

Technical Specification 6.8, " Procedures," states in part:

" Written procedures...shall be established, implemented, and maintained that meet or exceed the requirements...of Appendix 'A' of USNRC Regulatory Guide 1.33,"

which identified typical safety-related activities to be covered by written procedures; specifically, access control to radiation areas including a Radiation Work Permit System..

Pilgrim Nuclear Power Station Procedure No. 6.1-022, Revision 12, dated November 23, 1983, " Radiation Work Permits" states, "All persons who are to enter the work area shall be briefed by an HP representative on the physical and radiological conditions in the work area.

Once briefed, each individual shall sign in on the RWP sign-in sheet...The HP Technician will... sign the RWP sign-in sheet to document the briefing and authr'rization."

Contrary to the above, on February 15, 1984, two individuals entered into a radiation area (Condenser Bay A) to perform work without the required authorization and briefing by an HP representative on the physical and radiological conditions in the work area. The individuals did not sign in on the appropriate RWP which controls access to this radiation area.

8406260321 840618 PDR ADOCK 05000 0

r m

BOSTON EDISON COMPANY Mr. Thomas T. Martin, Director U.S. Nuclear Regulatory Commission May 16,1984 Page Two

Response

Based on our investigation of the incident, it was concluded that two individuals had entered Condenser Bay "A" to perform work without the required authorization and briefing by an HP representative solely on the direction of their supervisor.

The corrective step taken was that the supervisor in questian was reprimanded for his actions on 2/15/84 (the date of the incident), and the result achieved is that he admitted his error in judgement in instructing the workers to enter the area. We are confident that he will correctly adhere to Station policies and procedures in any future situations of a similar nature. The corrective step taken to avoid further violations was that on February 17, 1984 a meeting was held with Bechtel field supervision. The subject occurrence was described to all present and instructions given as to how to avoid similar situations from occurring in the future.

Full compliance was achieved on February 17, 1984, the date when the above-mentioned instruction was completed.

i If you have any questions or concerns regarding the above response, you are requested to direct them to the undersigned.