. _ . _ _ - - . . _ . _ _ _ _

  • . OPERATING DATA REPORT  ;

DOCKET NO: 50-313 DATE: Echruary 4. 1992 COMPLETED BY: K . R ._Liale s TbLEPil0NE: 1501) 964-5535 OPERATING STATUS

1. Unit Name: Arkanoas Nuclear _One - Unit 1 __

s

2. Reporting Period: January 1-31, 1992
3. Licensed Thermal Power (HWt): 22568 ,
4. Nameplate Rating (Gross HWo): 902.74 i
5. Design Electrical Rating (Not HWe): 850
6. Maximum Dependable Capacity (Gross HWe): 883
7. Maximum Dependable Capacity (Not HWe): 836
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Pensons:
9. Power Level To Which Restricted. If Any (Not HWe): Eone
10. Reasons For Restrictions. If Any: None HQNIH YR-TO-DATE CUMULATIVE
11. slours in Reporting Period .... 744.0 744.0 150,067.0
12. Number of Ilours Raactor was Critical ..................... 744.0 744.0 106,605.2
13. Reactor Reserve Shutdown ll o u r s . . . . . . . . . . . . . . . . . . . . . . . . 0.0 0.0 5,044.0 14 . _ llours Generator On-Line ...... 744.0 744.0 104,476.8
15. Unit Reserve Shutdown llours... 0.0 0. 0 - 817.5
16. - Gross Thermal Energy Generated

- ( H Wil ) . . . . . . . . . . . . . . . . . . . . . . . . 1,887,411.0 1,887,411.0 237,068,849.0 17.. Gross Electrical Energy Generated (HWil) . . . . . . . . . . . . . . 649,055.0 649,055.0 78,927,595.0

18. Not Electrical Energy Generated (HWil) . . . . . . . . . . . . . . 621,976.0 621,976.0 74.997,224.0
19. Unit Service Facter .......... 100.0 100.0 69.6 20._ Unit Availability Factor ..... 100.0 100.0 70.2
21. . Unit Capacity Factor (Using HDC Net) .............. 100.0 100.0 59.8
22. Unit Capacity Factor (Using DEC Not) .............. 98.4 98.4 $8.d
23. - Unit Forced Outaga Rate . . . . . . 0.0 0.0 12.4
24. Shutdowns Scheduled Over Next 6 Honths (Type, Date, and Duration of Each):

1R10 Refueling Outege is scheduled to begin February 29. 1,992 and the unit +

-is scheduled to restart April 27. 1992.

-- 2 5 . If Shut- Down At End of Report Period. Estimated Date of  ;

Startup __

26. : Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 08/06/74 INITIAL ELECTRICITY 08L17/74 COMMERCIAL OPERATION 12/19/74 9202210164 920214 PDR R-

ADOCK 05000313 PDR

. AVEKAGE DAILY UNIT POWER LEVEL DOCKET NO: $0-313 UNIT: one DATE: February 4, 1992  :

COMPLETED BY: K. R. liayes TELEPil0NE: L501) 964-5535 HONTil 2pnuary.__1992 ,

i DAY AVERAGE LAILY POWER I.EVEL ,

(MWe-Net) I 1 .............. 847 2 .............. 847 3 .............. 679 4 .............. 716 5 .............. 840 6 .............. 846 7 .............. 847 ,

8 .............. 847 9 .............. 847 10 ............. 848 11 ............. 846 12 ..'........... 846

-13 ............. 847

  • 14 ............. 847-15 ............. 848 16 ............. 847 ,

17 ............. 846

  • 18 ............. 846 19 ............. 846 20 ............. 836 ,

'21 ............. 846 22 ............. 846 ,

231 . . . . . . . . . . . . . . 843 24 ............. 843 25 ............. 846 26 ............. 846-27 ............. 846 28 ............. 845 t 846 l 29 .............

30.............-- 846 31 ............. 845 AVOS t - '836 INSTRUCTION ,

On'this format, list the average daily unit power level in NWe-Net for each day in reporting month. Compute to the nearest whole megawatt.

4

- . MONTHbY OPERATING REPORT OPERATING

SUMMARY

JANUARY, 1992 UNIT ONE 1

Unit Ono began the month operating at full power. On the third at 10:00 hours, the unit load was decreanod to 60% to repair a tube leak in the E8A Feedwater lleater. As the unit returned to full power, the scheduled monthly turbino valvo surveillance was performed, starting at 21:46 hours.

During the turbine valvo surveillance, at 22:25 hours..the plant lohd was decreased to 65% power to stabilize oscillations in the 1B Hain Feodwater pump. by 04:45 hourn on tha foutth, the unit. het returned to 91% power to allow completion of the turbine valve surveillance. During the ramp back to full power, after completion of the turbino valvo test (at 05:04 hours),

the plant experienced another erratic control cond4. tion on the 1B Hain Feedwater Pump. The plant reduced power to 85% to stabilize the pump. At 16:55 hours on the same day, power was incrnamed and the unit reached full power at 0'0:48 hours on the fifth. At 13:28 hours on the fifth, power was decreased to 90% to investigato the control oscillations on the 1B Hain Feedwater Pump. The unit was returned to full power at 16:05 hours on the same day. On the seventeenth at 08:40 hours, power was reduced to 98% to allow operation with only two Circulating Water Pumps due to a fish run at the intake screenhouse. This condition ended at 09:55 hours on the same day. Power was reduced to 95% on the twentieth at 08: 15 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br /> to again allow operation with only two Circulating Water pumps due to a fish run.

The unit-returned to full power on the same day at 12:15 hours. On the twenty-third at 14:05 hours, power.was reduced to 98% to allow the isolation of a waterbox due to indication of a condenser tubo leak. The unit was returned to full power at 19:00 hours on the same day. The unit

- operated at full power for the; remainder of January, i-

UNIT SHUTD0h'NS AND POWER xwvv110NS REPuxi FDR JANUART, 1992 ,

DOCKET NO. 50-313 UNIT NAME ANO Unit 1 DATE February 4 1992 COMPLETED BY K. R. Haves TELEPHONE (501) 964-5535 i

Y Method of Licensee Cause & Corrective  :

Duration Shutting Event System Component Action to No. Date ' Type (Hours) Reason * . Down Reactor' Report # Code' Code' Prevent Recurrence

[

None i

l i

l l

i 2 s =

F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explaf3) 1-Manual for Preparation of Da*a  ;

B-Maintenance or Test 2-hanual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (STEEG-D-Regulatory Restriction 4-Continuation 1022)

E-Operator Training & 5-Load Reduction .;

s License Examination 9-Other .

. F- Administrative Exhibit I - Same Sourca G-Operational Error. (Explain) l H-Other (Explain)

, ,p. w- r ee - -w, - w-. ,,wr +,----w- m~w+,+-r, r -r-,. -  % 4 - -

l

  • l DATE: January, 1992 i

i REFUEI.ING INFORMATION

1. Name of facility: Arkansas Nuclear One - Unit 1 ,
2. Scheduled date for next refueling shutdown. February 29. 1992 3.- Schedulod date for restart following refueling. April 27. 1992  !
4. Will refueling or resumption of operation thereafter require a technical epociff ention chango er other licence amendment? If answer la yes, what, in general, will there be? If answer is no, has the ,

reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CFR Section 50.59)? ,

Y Yes. TS changes _per GL 88-16 incorporatin.g use of a Core Operating Limits Report __(COI,R)_was submitted to the NRC.

5. Scheduled date(s) for submitting proposed licensing action and supporting information. C0hR was submitted to the NRC November 7. 1991.,_
6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating -

procedures. -

Hono.

7. The number of. fuel assemblies (a) in the core and (b) in the spent fuel storage pool._ a) 177 b) 565
8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been-requested or is I

planned, in number.of fuel assemblies.

present 968 increase size by 0

[

9. .The projected date of the last tefueling that can be discharged to the spent fuel pool assuming the present licensed capacity.

DATE: 1995 (Loss of fu11 core offload capability)

,