Discusses Application for Amend to License NPF-57,revising TS Section 3/4.6.1.8 Drywell & Suppression Chamber Purge Sys & Associated Bases
ML20092G823
Person / Time
Site: Hope Creek 
Issue date: 09/11/1995
From: Tosch K
NEW JERSEY, STATE OF
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9509200103
Download: ML20092G823 (2)


Text

t y

g6 tate of )Tefa 3creeg Christine Todd Whitman Department of Environmental Protection Robert C. Shinn, Jr.

Governor Commissioner Division of Environmental Safety, Health, Analytical Programs Radiation Protection Programs Bureau of Nuclear Engineering CN 415 i

Trenton, NJ 08625-0415 Tel: (609) 984-7700 FAX:

(609) 984-7513 September 11, 1995 U.S.

Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555 Gentlemen:

Subject:

Hope Creek Generating Station Docket No.

50-354 License Change Request LCR 94-32 3

Extension of Containment Vent and Purge Valve operation The subject request was submitted to the Nuclear Regulatory Commission by Public Service Electric and Gas Company on May 4, 1995.

This amendment revises Technical Specification Section 3/ 4. 6.1. 8 Drywell and Suppression Chamber Purge System and its associated Bases section by extending the annual 120 hour0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br /> operational limit to 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />.

The New Jersey Department of Environmental Protections Bureau of Nuclear Engineering (BNE) reviewed the above amendment in accordance with the requirements of 10 CFR 50.91(b), and has the

.following comments.

The BNE believes that since variances to the allowable j

operating limit for the containment purge system are based on plant specific equipment configurations, site meteorology,. radiological j

source term for reactor type, etc., the bases for extending this limit to 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> should be provided.

The NRC's Safety Evaluation for Amendment 16, which extended the annual 90 hour0.00104 days <br />0.025 hours <br />1.488095e-4 weeks <br />3.4245e-5 months <br /> limit to 120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br />, contains a detailed explanation and justification for the increase of 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> per year.

However, this request does not New Jersey is an Equal Opporturaty Employer O

9509200103 950911

      • P

PDR ADOCK 05000354 P

=,1DR _..,

O*

tr provide, a similar justification.

Also, PSE&G says that While the,re is a slight increase in the possibility of purge operations at the onset of a

LOCA, any resulting release would be insignificant and bounded by existing LOCA analysis. The BNE, F ever, suggests that although this resulting release could be issignificant, its radiological impact should be analyzed and discussed in this amendment request.

If you have any questions, please contact suren Singh at (609) 984-7575 or Rich Pinney at (609) 984-7558.

Sincerely, g[l% ',.

Kent Tosch, Manager Bureau of Nuclear Engineering c: Jill Lipoti, Ph.D.

Assistant Director, Radiation Protection Programs N.J.

DEP Dennis Zannoni Supervisor, BNE N.J.

DEP D.

Chawaga NRC Region I State Liaison Officer David H. Jaffe U.S. NRC Project Manager

.R.

Summers U.S.

NRC Hope Creek Senior Resident Inspector F. Thomson Manager, Licensing and Regulation PSE&G

3 3

e g.

CB0695K2 l'acility:

C.itawtyh clear Station NI't)l'S No -

SCOOO42 7tl

( 'o o n : y -. Yor k Samphng Pomt 002 (Conventional Waste Treat System) 1(ce:emnn Stream:

Lake Wytte 4

i.aboratory-Duke Power Biomonitoring Cert. No 99005 Exp I) ate:

12/31/9G

~

4 Test Orgarusm Coriodanhnia dubia Icmp 1(anne-24.5 to 25.2 "C

IWC: 100 %

I j

Test Type-(

) hr acute;

( 7 ) d chromc.

static

/

daily renewat j

Started (date/ time) 06 22 95 / 1044 Ended (date/ tune): 06 29 96 / 1059 i

l)3hetn_ Water Sourcs A_Ik L1ard Cond l

ModJlard_tlecrostituted_Miui O Watet DPC Lot # MHR- 034 54.1 76.9 285

]

S;.ple Type:

grab

( 24 ) hr comp Samole #

state / time collected 6 115 liar.d Cond Cl2

  1. renewalj CHOM501

_QG-21-95 / 1100 25.1 26.2 436 NM 2

Cf10 M 50!!

06 22-99 / 1200.

18.9 26.1 430 NM 5

5 Control Day 1

2 3

4 5

6 7

8 Temp

(*C) 24.9 25.0 24.9 24.7 24.8 24.6 25.0 24.5 4

D.O.

initial 8.3 8.4 8.1 8.1 8.1 8.0 8.2 final 8.3 7.9 8.0 7.9 7.9 8.1 8.2 p!!

initial 8.1 8.1 8.2 7.9 8.0 8.1 8.0 final 8.1 8.2 7.9 7.8 7.9 7.9 7.8

.jl00)%Eftluent Day 1

2 3

4 5

6 7

8 i

Temp

('C) 25.2 25.0 25.0 24.9 24.7 24.5 24.6 24.8

}

D.O.

initial 8.8 8.2 8.1 8.1 8.0 8.0 8.1 l

final 8.0 7.9 7.8 7.8 7.7 8.0 8.1 pli initial 7.4 7.G' 7.6 7.3 7.5 7.6 7.5 final 7.7 7.7 7.6 7.7 7.6 7.7 7.6 1

Comments:

Pnncipal Analyst 8,N.Youna Procedure Number. B10-260.0 (SC P/F Modification)

Organism Age at initiation 11 to 19 hours2.199074e-4 days <br />0.00528 hours <br />3.141534e-5 weeks <br />7.2295e-6 months <br /> Organism Source: Duke Power Culture (Tray P )

Sample CN069507 Temperature at Receipt 0.Q *C Test Solution Vdume: 15 mL Sample CN069508 Temperature at Receipt 0.8 *C Test Vessels: ymL oolystyrene Test conducted with < 3 samples as per NPDES permit (due to intemittent batch discharge)

No. Organisms per Test Vesset 1_ Feeding: Daily 0.1 mL ca. YTC and Selenastrum suso.

Aeration:,Ns g.g M = Male; NA=Not Applicable; NM:Not Measured; ND=Not Detected

,o Data checked by:

Ib, _

7/7/95

' Date:

Laboratory' Supervisor: _ / /4 fp..

Date:

N (over) n n.