Withdraws 911011 one-time Request for Exemption from Need to Accelerate Schedule for Performing Addl Containment Integrated Leak Rate Test.Requests That Companion TS Amend for Surveillance Requirement 4.6.1.2 Be Processed
ML20092G517
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 02/10/1992
From: Piet P
COMMONWEALTH EDISON CO.
To: Murley T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
NUDOCS 9202200188
Download: ML20092G517 (1)


Text

_ _ _ _ _ _ - _ _ _ _ _ _

[

D C:mmonw:sith Edison

) 1400 Opus PI:ce

(

oown:rs Groo, lilinois 60515 3

February 10, 1992 Dr. Thomas E. Hurley, Director U.S. Nuclear Regulatory Commission Washington, D.C. 20555 i

ATTN: Document Control Desk

Subject:

LaSalle County Station Unit 2 Hithdrawal of Request for One-Time Exemption from Appendix J to 10 CFR 50. Accelerated Type A Testing Requirements HRC D2CLtLHoJD.3L4

Reference:

Letter from P Piet (CECO) to the U.S. NRC, dated October 11, 1991.

Dear Dr. Murley:

In the referenced letter, LaSalle County Station requested a one-time exemption from the need to accelerate the schedule for performing an ndditional containment integrated leak rate test (CILRT) at LaSalle County Station Unit 2 (LaSalle), as required by 10 CFR 50, Appendtx J,Section I!!.A.6(b). At this time, however, Commonwealth Edtson (Ceco) wishes to formally withdraw our exemption request from further consideration.

He regret any inconveniences this may have caused your staff.

However, CECO still wishes to pursue the companion Technical Specification Amendment for Surveillance Requirement 4.6.1.2, transmitted in the referenced document.

It is requested that the processing of this Amendment request proceed as normal, If there are any further questions or concerns regarding this matter, please direct them to this office.

Sincerely,

(

hv

.d Peter L, Piet Nuclear Licensing Administrator cc:

A.B. Davis - Regional Administrator, RIII Senior Resident Inspector - LSCS B.L. Siegel - NRR, Project Manager Office of Nuclear Facility Safety - IDNS e - e 00, 4,

I 3

u l