Suppls Response to NRC Re Violations Noted in IE Insp Repts 50-327/83-25 & 50-328/83-25.Corrective Actions: Evaluation of Documented Calibr Checks/Standardization Check of Chemical Lab Equipment Completed
ML20092F538
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/15/1984
From: Kammer D
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20092F498 List:
References
NUDOCS 8406230496
Download: ML20092F538 (2)


Text

.

u.

~

TENNESSEE VALLEY AUTHORITY.

CHATTANOOGA. TENNESSEE 374ot 400 Chestnut Street Tower II May 15, 1984 U.S. Nuclear Regulatory Commission Region II Attn:

Mr. James P. O'Reilly, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 - NRC-0IE REGION II INSPECTION REPORT 50-327/83-25 AND 50-328/83 RESPONSE TO VIOLATION The subject 01E inspection report dated December 19, 1983 from D. M. Verrelli to H. G. Parris cited TVA with one Severity Level IV Violation. An initial report with the response to the item of violation in the subject inspection report was cubmitted to NRC on January 18, 1984. A revised response was submitted on February 28, 1984 by L. M. Mills' letter to you. Enclosed is a supplemental response which satisfies the commitment in item 4 of the revised response.

If you have any questions, please get in touch with R. H. Shell at FTS 858-2688.

To the best of Iqy knowledge, I declare the statements contained herein are complete and true.

Very truly yours, TENNESSEE VALLEY AUTHORITY ps%

D. S. Kammer Nuclear Engineer Enclosure co (Enclosure):

Mr. Richard C. DeYoung, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 8406230496 840605 PDR ADOCK 05000327 0

PDR 1983-TVA SOTH ANNIVERSARY An Equal Opportunity Employer O-

].

}

ENCLOSURE SUPPLEMENTAL RESPONSE - NRC INSPECTION REPORT NOS.

50-327/83-25 AND 50-328/83-25 D. M. VERRELLI'S LETTER TO H. G. PARRIS DATED DECEMBER 19, 1983 As a followup to our supplemental response, our evaluation of the need for documented calibration checks / standardization checks of chemical laboratory equipment has been completed. Based on this evaluation, Part III, Section 3.1, " Control of Measuring and Test Equipment," of the Operational Quality Assurance Manual is being revised to require documentation of performance of calibration checks and standa dizations of chemical laboratory equipment. This revision will be issued by June 15, 1984.

The program procedure that outlines the quality assurance requirements for the chemical and radiochemical laboratory activities to meet the requirements of Regulatory Guide 4.15 is being issued with guidelines outlining what instruments require calibration checks, along with. check frequency and necessary documentation. This procedure will be. issued by-May 31, 1984.