Monthly Operating Rept for Jan 1992 for Joseph M Farley Nuclear Plant
ML20092F053
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 01/31/1992
From: Dennis Morey, Woodard J
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9202190065
Download: ML20092F053 (4)


Text

=

.. Southem Nuclear Operaung Company

.. Post Offce Dos 1295 Bamingham, Alabama 35201 7deptmo 205 808 5086 Southern Nudear Operating Company

. o. woooa,a Vaco President the southem electric systern rarey Progt February 14, 1992 Docket No. 50-348 i

U. S. Nuclear Regulatory Commission ATTN:

Document' control Desk Washington, D. C.

20555 Joseph M. Farley Nuclear Plant Unit 1-Monthly noeratina Data Report Gentlemen:

Attached is the January 1992' Monthly Operating ' Report for Joseph-M._.Farley Nuclear Plant Unit 1, as required by Section 6.9.1.10 of the Technical.

~

Specifications.

If you have any questions, please advise.

Respectfully submitted, Y

$s b

D. Woodard AEJ:edb3014 Attachments cc: Mr.:S. D. Ebneter Mr. S. T.:Hoffman Mr. G. F. Maxwell 190008 l

1 i

9202190065 920231-PDR-ADOCK 05000348 PDR a-eR:

g

ay

j JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 i

NARRATIVE

SUMMARY

OF OPERATIONS January 1992 There were no unit shutdowns or major power reductions during the month of January.

The following major safety-related maintenance was performed during the month:

1.

Miscellaneous corrective and preventive maintenance was performed on the diesel ger.erators.

L l

l

OPERATING DATA REPORT DOCKET No. 50-348 DATE ~ February 5, 1992 COMPLETED BY D. N. Morey TELEP110NE (205)B99-5156 OPERATING STATUS Notes

1. Unit Name:

Joseph M. Parley - Unit 1

1) Cumulative data since
2. Reporting Period:

January 1992 12-1-77, date of

3. Licensed Thermal Power ( W t):

2,652 commercial operation.

4. Nameplate Rating (Gross We):

860

5. Design Electrical Rating (Net We): 829
6. Maximum Dependable Capacity (Gross MWe):

555.7

7. Maximum Dependable Capacity (Net We):

812.0

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

Item numbers 6 and 7 changed to reflect current output capacities.

9. Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any:

N/A

'Ihis Month Yr-to-Date Cumulative

11. Ilours In Reporting Period 744 744 124,200
12. Number Of Hours Reactor Was Critical 744 744 96,654.9

~

13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
14. Ilours Generator On-Line 744 744 95,008.3
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1,971,348.3 1,971,348.3 243,375,972.5
17. Gross Electrical Energy Generated ( WH) 644,104 644,104

~78,428,866

18. Net Electrical Energy Generated (fMI)

N,700 611,700 74,026,498

19. Unit Service Factor 100 100 76.5
20. Unit Availability Factor 100.0 100 76.5
21. Unit Capacity Factor (Using MDC Net) 101.3 101.3 73.7
22. Unit Capacity Factor (Using DER Net) 99.2 99.2 71.9 l
23. Unit Forced Outhge Rate 0

0 7.1

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

23. If Shut Down At End Of Report Period,-Estimated Date of Startup: N/A
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 08/06/77 08/09/77 I

INITIAL ELECTRICITY 08/20/77 08/18/77 COMMERCIAL OPERATION 12/01/77 12/01/77 Form 2/34

DOCKET N0.,

50-348 UNIT 1

DATE February 5, 1992 COMPLETED BY D. N. Morey TELEPHONE (205)899-5156 HONTH January DAY AVERAGE DAILY POVER LEVEL DAY AVERAGE DAILY POVER LEVEL (HVe-Net)

(MVe-Net) 1 824 17 828 2

822 18 827 3

821 19 827 4

822 20 828 5

822 21 827 6

822 22 824 7

823 23 820 8

821 24 823 9

817 25 824 10 821 26 823 11 825 27 823 l

12 798 28' 822 13 817 29 821 14 822 30 821 15 826 31 821 16 827 INSTRUCTIONS On this format, list the average daily unit pover level in MVe-Net for each day in the reporting month. Compute to the nearest whole megavatt.

l Form 13/21

tfMIT SMUTDOWNS AND POWER REDUCTIONS DCIKET No.

50-349 UNIT MAME J. St. FARLEY - LMIT 1 DATE Februarv 5. 1992 5

COMPLETED BY D. N. " TREY REPORT MONTH JANUARY TELEPHONE (2053890-5156 l

l I

I I

I METHW OF ltlCENSEE l l

l CAUSE & CORRECTIVE l

l j

j l DURATION l l SHUTTING l EVENT l SYSTEM l COMPONENT l

ACTION TO l

I l TYPE -l(rouRS) l REASON 2lDOWNREACTOR3 S

lNO.

l DATE l REPORT # lCCOE l CODE l

PREVENT RECURRENCE l

lThere were no v.

  • shutdowns or major power reductions during the enth of January.

l l

l l

1 I

I l-1 I

I I

I I

I I

I I

I I

I i

l 1

i i

l i

i l

i I

I I

I i

i l

i I

i 1

I l

i I

I I

I I

I i

I I

I i

i i

I i

l I

i l

1 i

i l

i I

'l l

I I

I I

I I

I I

I I

I i

1 1

I I

I I

I I

I l

1 1

1 I

I I

I I

I I

I i

i I

I I

I I

I i

i l

i I

I I

I I

I I

I i

l 1

1 1

1 I

l l

l l

l l

1

-l I

l 1

1

'l i

I I

I I

I I

I I

I I

I i

1.

I I

i i

I i

l i

i i

l I

i i

i l

i i

i i

i l

i i

i I

'l l

I I

I I

I I

-l I.

I i

1 1

I I

I I

I l-l 1

I I

I I

I I

I I

I I

I I

i I

i i

i I

i i

l i

i i

l i

l I

I i

1 l

I I

i i

l I

l......___..__........................... _........___...........__.......................__............___.................

I: Forced 2 Reason:

3 Method:

' Exhibit G-Instructions F

S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administrative SExhibit' I -Same Source G-Operational Error (Explain)

H-Other (Explain)

Page 1

.