Northem States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401-1927 Telephone (612) 330-5500 i
1, cy 11, 1992 Monticello Technical Specifiestions l
Section-6.7.A.3 VS Huclear Reginatory Commission Attn: Document control Desk Washington, DC 20555 MONTICELLO NUCIIAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report January. 1902 Attached is the Monthly Operating Report for January,1992 for the Monticello Nuclear Generating Plant.
/NM0 ' ic![W
' Thomas M Par er Manager Nuclear. Support Service TMP/
C:
Director, Office of.Resua:ce Management Regional Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector MPCA Attn: J W Ferman Attachment
[)S 92o21eo323 920:33 p
roa. aooCM osooo m R
OPERATING DATA REPORT 3.
a*
. DOCKET'NO. 263 DATE-2a 4-92 I
-COMPLETED BY H. H. PaustianI 7
TELEPHONE 612/295-5151-OPERATING-STATUS-
~I
] Notes
-)
- 1. ; Unit :Nameo ::
Monticello
)
)
! 2.J: Reporting period: -
- January
)
-)
.3.iLicensed Thermal Power (MWt):
1670
)
)
- 14. Nameplate Rating (Gross MWe):
569
).
)
4 5,. Design Electrical-_ Rating (Net MWe):=
545.4
-)
)-
-46? Maximum Dependable Capacity (Gross: MWe)
.,_._5 6 4
)
.]
L7._ Maximum Dependable' Capacity.(Net MWe):
536
)
J-
- 8. If Changes Occur-in Capacity Ratings (Items Number 3 Through 7) Since Last Report,:Give Reasons:
l
- 9. Power Level;To Which Restricted, If Any_(Net MWe):
N/A
- 10. Reasons-For Restriction's,- If Any:'
_N/A_
iO THIS MONTH-YR.-TO-DATE
-CUMULATIVE-744 744 180481
.~11.5 Hours In Reporting _ Period 675.1 675.1 144093.5-
- 12.LNuriber Of hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7-
- 14.tHours Generator On-Line 656.8 656.8 14140<' 7 15.-Unit Reserve Shutdown Hours O' 0 0.0
- 0. 0 -
- 16.-, Gross Thermal Energy Generated (MWH)-
_1078193 1078193 216611770
?17.-Gross Electrical Energy = Generated:(MWH) 362863-362863 73252708 2
118. Het Electrical Energy.' Generated (MWH)
-348400--
348400 70050618 19;-Unit-Service Factor:
-88.3%
88 3%
78.3%-
h 88.3%
88.3%
78.3%
- 20. Unit Availabil-ity Factor
~
21.iUnit1 Capacity Factor;(Using MDC Net) 87.4%
87.4%
72.4%
J22.sUnitz; Capacity; Factor-(UsingLDER Net) 85.9%-
85.9S 71.2%
23.iUnit Forced-Outage Rate 9.4%-
9.4%-
3.9%
24.s Shutdowns Scheduled Over Next 32 Months (Type,-Date, and' Duration of Each)
- Refueling; Outage
-1/6/93 - 56 days
'L25.olf Shut Down At End Of Report Period, Estimated Date Of Startup:N/A
^ 26.i Units :In Test f Status (Prior to Commerciak Operation) :- N/A Forecast Achieved-
, INITIAL CRITICALITY
-INITIAL ELECTRICITY COMMERCIAL OPERATTON s
4 y
,.,,2
.g...
_ay.,
,,m.
a.
~ NARRATIVE :
SUMMARY
iOF~. OPERATING EXPERIENCE DOCKET NO.
50-263-J DATE 2-4-92 COMPLETED-BY H. - li. Paustian:.
~'
TELEPHONE.'612/295-5151 MONTIl-JAN i1-1. to
. Power operation.
- 1-2-92.
- 1-2-92 to:
Outiage; to repair Safety Relief Valve Bellows Leak Test 1-6-92 System.
-1~-6-92 toL 1-9-92-_.
Power operationi
+
n J1-9-92 Power reduction'to-70% te backwash Condensate Demineralizer.
.1-9 to-Power operation.
- 1-24 L1-24 Power reduction to-80% due to ice in Intake Structure.
'1-24-92.-
to -
Power. operation.
1-31-92 I
i Note: Power operation defined as essentially 100% of
' rated power except for weekend load drops for 4
specified surveillance testing.
l
..m-.
.~.
a AVERAGE DAILY-UNIT-POWER LEVEL
~,y DOCKET NO.
50-263
.i
' UNIT-Monticello_.,_'
DATE~
'2-'4-92 COMPLETED BY H.-H.'Paustian j
L TELEPHONE 612/295-5151-p i
MONTH OF._ January
-DAY = -AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL.
P (MWe-Net)
(MWe-Net)
17 544.
-2
'313.
18 544.
L L3;
-6.
19 539.
4
- - 6 ~.
20 541.
5 -'
-7.
21 543.
-- 6 --
213.
22 540.
I'
- 7; 522.
23 543.
8?
- 543, 24 518.
o-
- 9:
514.
25 535.
l-
's b
10 ;-
540.
26 530.
11-.
'543.
27 549.
P
- 12'
- 542, 28 537.
13-
- 541, 29 549.
4 14' 543.
30 528.
~
e15 546.
~31 552.
216'-
539.
-INSTRUCTIONS
.On'this' format, list the average daily unit power level in MWe-Net-for each day:in_the~ reporting month.
Compute to the nearr.3t whole megawatt.
L l'
t-l l
~
UNIT SHUTDLNNS AND POVER REDUCTIONS DOCKET NO.
50-263 V
UNIT NAME Monticello DATE 02-0-92 COMFLETED BT 11. H. rauscian REPORT MONTH January-TELEPHONE _,612/295-5151-Duration Reason Method LER' System Cause & Col ective Ty(pe (hours)
(2) of
. No.
Code No.
.Date e-Action to-1)
Shutdown (4)
(5) I Prevent Recurrence
.(3)
{
1 01-02-92 F
87.2 A
'2 92-001 SB FSV I Shutdown required to re ir solenoid valves on Bellows Leak Detection oystem for 2 Safety Relief.
Valves.
2 01-09-92 F.
O H
4 N/A SF FDM
. Power reduction to 70% required to backvash..
Condensate Demineralizer.
3 01-24-92 F'
O H
4 N/A NN N/A Icing problems in Cire. Vater Intake Structure required power reduction to 80%.
t l
1 2
3 4
F: Forced Reason:
Method:
Draft IEEE Standard S: Scheduled A-Equipment Failure (Explain) 1-Manual 805-1984(F805-D5)
B-Maintenance or Test -
2-Mantal Scram C-Refueling 3-Automatic Scram 5
D-Regulator Restriction 4-Other (Explain)
IEEE Standard 803A-1983
.E-Operator Training & License Examination F-Administrative G-Operational Error.(Explain)
H4ther. (Explain)