Monthly Operating Rept for Jan 1992 for Waterford 3
ML20092E847
Person / Time
Site: Waterford Entergy icon.png
Issue date: 01/31/1992
From: Burski R, Centolanzi P
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-92-0117, W3F1-92-117, NUDOCS 9202180285
Download: ML20092E847 (7)


Text

. -

r-g-

f.[
ENTERGY/

!"#T"*"*"'""*

KAya(A 700fs M 504 7JD 0771 H. F. DursLI.

own lid mrEggy

-y Uru S td 3 W3F1-02-0117 A4.05 QA-o

-February 113,:1992.

EU.S. Nuclear Regulatory Commission ATTN:-L Document Control Desk 6

Washington,- D.C.- 20555.

l

Subject:

Waterford 3 SES Docket No. 50-382 -

1a License No. NPF-38 Monthly Operating Report

' Gentlemen:

U Attached is the subject monthly report which covers the operating statistics for the month of January,1921. This report is submitted per Section G.9.1.0 of the

-Waterford 3 Technical Specifications for Facility Operating License No. NPP-38.

?

. _Very[trulyfyours,

.?

,-5 u

RFB /TJG/ssf-

- Attachment cc:-

iR.D. Martin, NRC Region IV t

- D.L. Wigginton, NRC-NRR =

' R.B'. McGehee a

N. S.i Reynolds

~ J.T; Wheelock (INPO Records Center)

NRC Resident Inspectors Office
9202180285 920131 PDR ADOCK~05000382

.PDR R

rERY

<//

,-..,. -,. -.. - _. _ - -., - -.. -.. -,.... - ~ - -.

p n

- c 4.

r,

-.NRC'MONTilLY OPERATING REPORT

SUMMARY

OF OPERATIONS-m WATERFORD 3-

.se JANUARY 1992 h

The= unit operated at an; average reactor power of 99.8% and experienced _no-forced outages or.significant power reductions during the period.

j

',i;_

.ly h

1 e

1

-W310204B-k

lq I} :

m PRESSURIZER SAFETY VALVE.

FAILURES AND CllALLENGES' WATERFORD 3 l

During the month.of January 1992, there were no pressurizer safety valve failures or challenges.

Y s

a R

f

W310204B

- - ~

.4 4

'7,

^

0PERATING DATALREPORT

. s.

i-LUNIT NAME: WATERFORD 3
CITY / STATE: KILLONA/LA-

'DATE: FEBRUARY, 1992 i

? OPERATING STATUS

-1.-Docket:-50-382 Notes L2. Reporting Period: -JANUARY 1992

3. Utility

Contact:

. PATRICK CENT 0LANZI

-Phone Number:-.'(504) 739-6683

~

~

4. Licensed Thermal Power (HWL): 3390
5. Nameplate Rating (Gross Hwe)::1200 t

. 6.IDesign Electrical Rating (Net NWe): 1104

~

-7. Maximum Dependable-Capacity (Gross inae): 1120

' 8.2 Maximum Dependable Capacity (Net MWe): 1075

9. !If. Changes _0ccur in Capacity Ratings '(Itemr,- Number 4 Through 8) Since Last Report,

=t

.Give. Reasons:

, 10, -Power: Level-To Which Restricted, if Any'(Net.MWe):

NONE

-11.EReasons'For: Restrictions, If Any: N/A I

This Month Yr.-to-Date Cumulative

' 12. -_ Hours-In Reporting Period-744 744 55,705 13.

Number Of Ilours Reactor Was Critical 744 744 45,830,4-

_14. - Reactor Reserve Shutdown Hours. 15L Hours Generator On-Line

_ 1744 744-45,124.8 p

16, Unit Reserve Shutdown Hours' :

W310204B

.. ~..

G-q.-

,y 4

.g i

'l OPERATING DATA REPORT---

(Continued)

-This Month Y r._ - to-Da te Cumulative

~

17. ' Gross Thermal Energy 2,517,213

_2,517,213 148,066,688 Generated'(MWH)

=i (18.- Gross. Electrical Energy 847,100' 847,100 49,718,520,

-Generated _(MVH)-

19. 'Fet. Electrical: Energy.

-813,288 813,288

-47,362,748 f

Generated (MWH)-

, 20.

Unit' Service Factor-100.0 100.0 81.0 f31. Unit 1 Availability Factor 100.0-100.0 81.0 1

22. -Unit Capacity _ Factor.

101.7-101.7-79.1-

-(Using MDC Net)

J23. Unit: Capacity Factor, 99 0-99.0-

' 77.0 '

(Using DER. Net).

~

24. Unii forced Outage Rate 0.0 0.0 4.2 125i Unit l Forced Outage Hours 1,984.8
26. Shutdowns Schedul'ed Over/Next'6 Months'(Type,;Date,'and Duration of Each):-

Maintenance,=2-17-92, 8' days 27.

If" Shut Down At End of' Report: Period, Estimated Date Of Startup:

'28. iUnits In Test Status-(Priorito Commercial Operation):

r 1

Forecast Achieved 1 INITIAL CRITICALITY 3/04/85'

?

INITIAL ELECTRICITY 3/18/85-

+

COMMERCIAL OPERATION 9/24/85 I

t, L

W310204B L:

-, _ _. _ ~

e

..:,.~,;

--.---s i g;. ' '

i r

AVERAGE DAILY UNIT POWERLLEVEL:

l-DOCKET NO. 50-382-UNIT WATERFORD 3 DATE-FEBRUARY, 1992 COMPLETED ~ BY PATRICK CENT 0 LANZ 1 TELEP}l0NE 504-739-6683 MONTil JANUARY 1992-DAY-AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEIT (NWe-Net)

(MWe-Net).

'l-1095 17 1093 2

1095-18 1093 13 1095 19 1094

~!

4-1095 20 1094

-8

-1094 21 1095 16.

1095 22-1093 7

1094 23 1094.

.8 :

-1094 24-

-1093 Lt 1'

1093 25 1070 9

,10: -

1094 26 1094 l11 5 109'3 27 1093

-12 1094 28

'1094 l

13-1094-29 1093' E

14' 1094 30 1094 15 :

1093 31 1094 16-1093 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each s

day in the reporting month.

Compute to the nearest whole megawatt.

LW310204B y

n q.4 1

DUNIT SHITEDOWNS : AND.. POWER.-REDUCTIONS -

  • REPORT: FOR JANUARY,.1992 :-l E-2

' DOCKET NO' 50-382 Vr 1

. UNIT NAME' WATERFORD 3 DATEL FEBRUARY-1992-

-COMPLETED'.BY PATRICK CENTOIANZI 1 TELEPHONE

'504-739-6683-v 4

Method of' Licensee'

'Cause & Corrective':

l

' 010URS)

REASON 2.

Shutting

" Event

' System Component.

LAction"to-Duration Down Reactor 3

' Report #

" Code 4' Code 5 No.

. Date Type Prevent Recurrence':

NONE l'

, i]

4 l-

-l E

i 1

2 3

F: Forced Reason:

Method S: Scheduled

'A-Equipment Failure (Explain)

.1-Manual

- B-Maintenance ' or-Test 2-Manual Scram.

C-Refueling 3-Automatic Scram.

D-Regulatory Restriction. Continuation:

4 E-Operator Training &

5-Load Reduction IEEE Std.- 805-1984 License Examination 9-Other

-5 F-Administrative IEEE Std. 803A-1983-G-Operational Error (Explain) 1 H-Other.(Explain) i W310204B 4

_.p-.,

,,9.3--

y

-.w+..

w.,

s.,y..,

..,_9.,_.og, y

c e,.7,.-i,y-.--.

.q. w w

,,%,.p,,

,,.,,,.,y i.i.

.~%..

.,ry,