ML20092E847
| ML20092E847 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 01/31/1992 |
| From: | Burski R, Centolanzi P ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| W3F1-92-0117, W3F1-92-117, NUDOCS 9202180285 | |
| Download: ML20092E847 (7) | |
Text
. -
r-g-
- f.[
- ENTERGY/
!"#T"*"*"'""*
KAya(A 700fs M 504 7JD 0771 H. F. DursLI.
own lid mrEggy
-y Uru S td 3 W3F1-02-0117 A4.05 QA-o
-February 113,:1992.
EU.S. Nuclear Regulatory Commission ATTN:-L Document Control Desk 6
Washington,- D.C.- 20555.
l
Subject:
Waterford 3 SES Docket No. 50-382 -
1a License No. NPF-38 Monthly Operating Report
' Gentlemen:
U Attached is the subject monthly report which covers the operating statistics for the month of January,1921. This report is submitted per Section G.9.1.0 of the
-Waterford 3 Technical Specifications for Facility Operating License No. NPP-38.
?
. _Very[trulyfyours,
.?
,-5 u
- RFB /TJG/ssf-
- Attachment cc:-
iR.D. Martin, NRC Region IV t
- D.L. Wigginton, NRC-NRR =
' R.B'. McGehee a
N. S.i Reynolds
~ J.T; Wheelock (INPO Records Center)
- NRC Resident Inspectors Office
- 9202180285 920131 PDR ADOCK~05000382
.PDR R
rERY
<//
,-..,. -,. -.. - _. _ - -., - -.. -.. -,.... - ~ - -.
p n
- - c 4.
r,
-.NRC'MONTilLY OPERATING REPORT
SUMMARY
OF OPERATIONS-m WATERFORD 3-
.se JANUARY 1992 h
The= unit operated at an; average reactor power of 99.8% and experienced _no-forced outages or.significant power reductions during the period.
j
',i;_
.ly h
1 e
1
-W310204B-k
lq I} :
m PRESSURIZER SAFETY VALVE.
FAILURES AND CllALLENGES' WATERFORD 3 l
During the month.of January 1992, there were no pressurizer safety valve failures or challenges.
Y s
a R
f
- W310204B
- - ~
.4 4
'7,
^
0PERATING DATALREPORT
. s.
- i-LUNIT NAME: WATERFORD 3
- CITY / STATE: KILLONA/LA-
'DATE: FEBRUARY, 1992 i
? OPERATING STATUS
-1.-Docket:-50-382 Notes L2. Reporting Period: -JANUARY 1992
- 3. Utility
Contact:
. PATRICK CENT 0LANZI
-Phone Number:-.'(504) 739-6683
~
~
- 4. Licensed Thermal Power (HWL): 3390
- 5. Nameplate Rating (Gross Hwe)::1200 t
. 6.IDesign Electrical Rating (Net NWe): 1104
~
-7. Maximum Dependable-Capacity (Gross inae): 1120
' 8.2 Maximum Dependable Capacity (Net MWe): 1075
- 9. !If. Changes _0ccur in Capacity Ratings '(Itemr,- Number 4 Through 8) Since Last Report,
=t
.Give. Reasons:
, 10, -Power: Level-To Which Restricted, if Any'(Net.MWe):
NONE
-11.EReasons'For: Restrictions, If Any: N/A I
This Month Yr.-to-Date Cumulative
' 12. -_ Hours-In Reporting Period-744 744 55,705 13.
Number Of Ilours Reactor Was Critical 744 744 45,830,4-
_14. - Reactor Reserve Shutdown Hours. 15L Hours Generator On-Line
_ 1744 744-45,124.8 p
16, Unit Reserve Shutdown Hours' :
W310204B
.. ~..
G-q.-
,y 4
.g i
'l OPERATING DATA REPORT---
(Continued)
-This Month Y r._ - to-Da te Cumulative
~
- 17. ' Gross Thermal Energy 2,517,213
_2,517,213 148,066,688 Generated'(MWH)
=i (18.- Gross. Electrical Energy 847,100' 847,100 49,718,520,
-Generated _(MVH)-
- 19. 'Fet. Electrical: Energy.
-813,288 813,288
-47,362,748 f
Generated (MWH)-
, 20.
Unit' Service Factor-100.0 100.0 81.0 f31. Unit 1 Availability Factor 100.0-100.0 81.0 1
- 22. -Unit Capacity _ Factor.
101.7-101.7-79.1-
-(Using MDC Net)
J23. Unit: Capacity Factor, 99 0-99.0-
' 77.0 '
(Using DER. Net).
~
- 24. Unii forced Outage Rate 0.0 0.0 4.2 125i Unit l Forced Outage Hours 1,984.8
- 26. Shutdowns Schedul'ed Over/Next'6 Months'(Type,;Date,'and Duration of Each):-
Maintenance,=2-17-92, 8' days 27.
If" Shut Down At End of' Report: Period, Estimated Date Of Startup:
'28. iUnits In Test Status-(Priorito Commercial Operation):
r 1
Forecast Achieved 1 INITIAL CRITICALITY 3/04/85'
?
INITIAL ELECTRICITY 3/18/85-
+
COMMERCIAL OPERATION 9/24/85 I
t, L
W310204B L:
-, _ _. _ ~
e
..:,.~,;
--.---s i g;. ' '
i r
AVERAGE DAILY UNIT POWERLLEVEL:
l-DOCKET NO. 50-382-UNIT WATERFORD 3 DATE-FEBRUARY, 1992 COMPLETED ~ BY PATRICK CENT 0 LANZ 1 TELEP}l0NE 504-739-6683 MONTil JANUARY 1992-DAY-AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEIT (NWe-Net)
(MWe-Net).
'l-1095 17 1093 2
1095-18 1093 13 1095 19 1094
~!
4-1095 20 1094
-8
-1094 21 1095 16.
1095 22-1093 7
1094 23 1094.
.8 :
-1094 24-
-1093 Lt 1'
1093 25 1070 9
,10: -
1094 26 1094 l11 5 109'3 27 1093
-12 1094 28
'1094 l
13-1094-29 1093' E
14' 1094 30 1094 15 :
1093 31 1094 16-1093 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each s
day in the reporting month.
Compute to the nearest whole megawatt.
LW310204B y
n q.4 1
DUNIT SHITEDOWNS : AND.. POWER.-REDUCTIONS -
- REPORT: FOR JANUARY,.1992 :-l E-2
' DOCKET NO' 50-382 Vr 1
. UNIT NAME' WATERFORD 3 DATEL FEBRUARY-1992-
-COMPLETED'.BY PATRICK CENTOIANZI 1 TELEPHONE
'504-739-6683-v 4
Method of' Licensee'
'Cause & Corrective':
l
' 010URS)
REASON 2.
Shutting
" Event
' System Component.
LAction"to-Duration Down Reactor 3
' Report #
" Code 4' Code 5 No.
. Date Type Prevent Recurrence':
NONE l'
, i]
4 l-
-l E
i 1
2 3
F: Forced Reason:
Method S: Scheduled
'A-Equipment Failure (Explain)
.1-Manual
- B-Maintenance ' or-Test 2-Manual Scram.
C-Refueling 3-Automatic Scram.
D-Regulatory Restriction. Continuation:
4 E-Operator Training &
5-Load Reduction IEEE Std.- 805-1984 License Examination 9-Other
-5 F-Administrative IEEE Std. 803A-1983-G-Operational Error (Explain) 1 H-Other.(Explain) i W310204B 4
_.p-.,
,,9.3--
y
-.w+..
w.,
s.,y..,
..,_9.,_.og, y
c e,.7,.-i,y-.--.
.q. w w
,,%,.p,,
,,.,,,.,y i.i.
.~%..
.,ry,