ML20092E406
| ML20092E406 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 02/03/1992 |
| From: | Zach J WISCONSIN ELECTRIC POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML19344C340 | List: |
| References | |
| CON-NRC-92-017, CON-NRC-92-17 VPNPD-92-062, VPNPD-92-62, NUDOCS 9202180109 | |
| Download: ML20092E406 (1) | |
Text
Wisconsin 1 Elecinc PONER COMPANY 231 w Mema n to a w 2m vwoee w15rm gun:;4 m VPNPD-92-062 NRC-92-017 February 3, 1992 U.
S.
NUCLEAR REGULATORY COMMISSION Document Control Desk Mail Station P1-137 Washington, D.
C.
20555 Gentlemen:
DOCKETS 50-2 66 A@ 50-3 01 EliGGENCY PLhN IMPLEMENTING PROCIDJJRES MANUAL POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 Enclosed are copies of revised procedures to the Point Beach Nuclear Plant Emergency Plan Implementing Procedures Manual.
The procedures consist of changes which should be filed in your copies of the subject document in accordance with the attached instructions.
by.
Please note that the procedures containing names and telephone numbers are stamped, "NRC ONLY, NOT FOR PUBLIC DISCLOSURE."
A copy of the affected procedures with names and numbers deleted is provided and is stamped, " NAMES AND TELEPHONE NUMBERS DELETED,"
to assure confidentiality and facilitate your distribution to the Public Documents Rooms.
Sincerely, N c ll
%n s'
h
-f~
c L%s )
J-.es J.
Zach Vice President Nuclear Power Enclosures Copics to NRC Incident Response Center, Region III (2)
[/j NRC Resident Inspector (without enc.)
P od (Of # '\\ #
,2021e010e e202m v%
PDR ADOCK O$000266 F
PDR gI
}h
\\b{
. I wbakin of Htun,xt? hterp {bqvra!nvt