ML20092E406

From kanterella
Jump to navigation Jump to search
Forwards Public & Central Files Versions of Revised Epips, Including Rev 14 to EPIP 1.1,Rev 6 to EPIP 1.1.1,Rev 3 to EPIP 1.1.2,Rev 22 to EPIP 1.2,Rev 20 to EPIP 1.3,Rev 7 to EPIP 2.1 & Rev 3 to EPIP 2.2.Central Files Version Withheld
ML20092E406
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/03/1992
From: Zach J
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19344C340 List:
References
CON-NRC-92-017, CON-NRC-92-17 VPNPD-92-062, VPNPD-92-62, NUDOCS 9202180109
Download: ML20092E406 (1)


Text

Wisconsin 1 Elecinc PONER COMPANY 231 w Mema n to a w 2m vwoee w15rm gun:;4 m VPNPD-92-062 NRC-92-017 February 3, 1992 U.

S.

NUCLEAR REGULATORY COMMISSION Document Control Desk Mail Station P1-137 Washington, D.

C.

20555 Gentlemen:

DOCKETS 50-2 66 A@ 50-3 01 EliGGENCY PLhN IMPLEMENTING PROCIDJJRES MANUAL POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 Enclosed are copies of revised procedures to the Point Beach Nuclear Plant Emergency Plan Implementing Procedures Manual.

The procedures consist of changes which should be filed in your copies of the subject document in accordance with the attached instructions.

by.

Please note that the procedures containing names and telephone numbers are stamped, "NRC ONLY, NOT FOR PUBLIC DISCLOSURE."

A copy of the affected procedures with names and numbers deleted is provided and is stamped, " NAMES AND TELEPHONE NUMBERS DELETED,"

to assure confidentiality and facilitate your distribution to the Public Documents Rooms.

Sincerely, N c ll

%n s'

h

-f~

c L%s )

J-.es J.

Zach Vice President Nuclear Power Enclosures Copics to NRC Incident Response Center, Region III (2)

[/j NRC Resident Inspector (without enc.)

P od (Of # '\\ #

,2021e010e e202m v%

PDR ADOCK O$000266 F

PDR gI

}h

\\b{

. I wbakin of Htun,xt? hterp {bqvra!nvt