ML20092D710
| ML20092D710 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 01/31/1992 |
| From: | Haltiwanger J, Skolds J SOUTH CAROLINA ELECTRIC & GAS CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9202140199 | |
| Download: ML20092D710 (5) | |
Text
.
~.
.- - ~.
-10CFR50.36-u-
+ ",,
-- S uth Cartlins En:ctrie & Oes Comp ny J;hn L. Skilfs
- 1. "
P.O. Box 88 -
Vice Prsskient -.
Jenkinsvme, Sc 290$$ '
Nuclear Operations'
- (803) 345-4040.
.f mum February 10, 1992
- Mcument Control Desk
-U. S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Director, Office of Resource Management Gentlemen:
Subject:
VIRGIL' C. SUMMER NUCLEAR STATION DOCKET NO.-50/395 OPERATING LICENSE NO. NPF-12 JANUARY MONTHLY OPERATING REPORT Enclosed is the January-1992 Monthly Operating Report for the Virgil C.-
Summer Nuclear Station Unit'No. 1.- This-submittal is-made in accordance-with the requirements of Technical-Specifications,.Section 6.9.1.10..
1 If there are any questions.please call me at your convenience.
Very truly yours.
h!
' John L. Skolds
^
- JWH:RJB:JLS: Icd!
Attachments c:
0.-W.-Dixon Jr.
J.-W.' Flitter R.: R. Mahan
.F. Yost JR. J. White INP0 Records Center S.-D. Ebneter AH1' Library G. F. Wunder
-Marsh & McLennan General Managers NSRC G.-G. Soult RTS (MON 2000)
.HRC Resident Inspector File (818.03-1)
.J. B. Knotts Jr.
\\
\\
'9202140199 920131 1
PDR-ADOCK 05000395-1
)
n PDR l 'A U W ri)
NUCLEAR LXCELLENCE - A StM4ER TRADITION!
t Director, Office of Resource Management January Monthly Operating Report Page 1 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50/395 UNIT V. C. SUMMER I DATE 2/ 3/92 COMPLETED BY J. W.
IIALTIWANGER TELEP110NE (803) 345-4297 JANUARY 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1.
893 17.
893 2.
893 18, 894 3.
894 19, 895 4.
893 20.
894 5.
894 21.
895 6.
893 22.
893 7.
893 23.
894 8.
892 24.
894 9.
992 25, 893 10.
893 26, 893 11.
892 27.
893 12.
893 28.
893 13.
893 29.
893 14, 893 30.
893 15.
892 31, 893 16.
892
_m_
_.. ~
m.~._..
.e
.J
=r A
4; i
3,
- ?>
-Director, Office'of Resource Management i
- January' Monthly Operating-ReportL 7
- Page 2
]
ATTACHMENT II OPERATING DATA REPORT DOCKET No.
50/395
-UNIT V. C. SUMMER I DATE-
.2/ 3/92 COMPLETED BY J.
W.- HALTIWANGER TELEPil0NE -- (803) 345-4297 OPERATING STATUS-l.JReporting Period January 1992 Gross Hours in Reporting Period:
744
- 2. Currently Authorized Power Level-(MWL):
2775 Max. Depend. Capacity (MWe-Net):
-885 fDesign Electrical Rating-(MWe-Net):..
.900:
3." Power Level to.Which' Restricted (If Any)(MWe-Net): N/A-4.-Reasons:for' Restrictions N/A-THIS MONTH YR TO DATE CUMULATIVE T
- 5. Number:of Hours Reactor Critical-744.0 744.0.
55368,6
-6.-Reactor Reserve Shutdown Hours-0.0 0.0 0.0
-r 7.~ Hours Generatorion Line-744;0 744,0 54231.7
- 8. Unit.. Reserve Shutdown Hours 0.0 0.0' 90. 0
.9.-Gross' Thermal. Energy Generated.(MWH) 2062943 2062943 140631710 E10._GrossLElectrical Energy (MWH)
-692660
-692660 46578059
- 11.-Net Electrical'EnergyfGeneratedL(MWH) 664536 664536 44211818
- 12. Reactor Service Factor-100.0-100.0 78.1
=13. Reactor Availability. Factor' 100.0 100.0 78.1-14." Unit Service Factor '
100.0 100.0
'76.5
,15.(Unit Availability Factor 100.0 100.0 76.5 16.fUnit. Capacity' Factor (Using MDC)=
100.9 100.9 70.5-
- 17.-; Unit 1 Capacity Factor (Design MWe) 99.2
_ 99. 2:
69.3 4
L
- 18. Unit Forced Outage Rate 0.0-0.0 6.7 19/ Shutdowns Scheduled Over Next 6 Months (Type, Date & Duration of Each):
P
-N/A' r
- 20. If-Shut Down at End'of Report Period, Estimated Date of Startup N/A.
"21.; Units in Test Status (Prior'to Commercial Operation): N/A l,-
K
!~
- e Director, Office of Resource Management i
January Monthly Operating Report Page 3 ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50/395 UNIT V. C. SUMMER I DATE 2/ 3/92 COMPI.ETED BY J.
W.
HALTIWANGER TELEPHONE (803) 345-4297 JANUARY 1992
.NO.
DATE TYPE DURATION REASON METHOD CORRECTIVE ACTION / COMMENTS HONE 1.0 REASON A: Equipment Failurc B: Maintenance or Test C: Refueling D Regulatory Mestriction E Operator Training and License Examination F: Administrative G: Operational Error H: Other (Explain) i I
2.0 METHOD 1: Manual 2: Manual Scram 3: Automatic Scram 4: Continuation (Use initial Date) 5: Power Reduction (Duration 0.0)
- 9. Other (Explain) l l
.?
Director, Office of Resource Management January Monthly Operating Report Page 4 i
ATTACHNENT IV.
NARRATIVE SUHMARY OF OPERATING EXPERIENCE DOCKET NO.
.50/395 UNIT V. C. SUMMER I DATE 2/ 3/92 COMPLETED BY J.
W. - IIALTIWANGER 1
TELEPHONE (803) 345-4297 j
JANUARY 1992 1
V.
C. Summer Nuclear Station operated at approximately 100% power for the entire month of January.
H l
!