Forwards LaSalle County Nuclear Power Station Unit 2 ISI Summary Rept for Spring 1995 ASME Section XI ISI
ML20092C870
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 09/08/1995
From: Burns J
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20092C872 List:
References
NUDOCS 9509130167
Download: ML20092C870 (2)


Text

_

Osmmonwcalth Ihnn Company 1.aNalle Generating Station 2601 North list Road Marwilles,11. 61.4 a 1-9757 Tel Hi s.45N>T61 September 8,1995 U. S. Nuclear Regulatory Commission Washington, D. C.

10555 Attention: Document Control Desk

Subject:

LaSalle County Unit 2 Inservice inspection Summary Report NRC Docket No. 50-374 Attached is a copy of the Commonwealth Edison Company LaSalle County Nuclear Power Station Unit 2 Inservice inspection (ISI) Summary Report for the Spring 1995 ASME Section XI inservice Inspection. This is the third period of the first ten-year interval, and this was 1.aSalle's sixth refueling outage for Unit 2.

LaSalle's malling address is:

LaSalle County Station 2601 North 21st Road Marsellies, Illinois 61341-9757 Unit 2 is owned and operated by Cwnmonwealth Edison Company, whose address is:

d One First National Plaza P. O. Box 767 1

Chicago,lilinois 60690 Unit 2 has a gross generating capacity of 3323 MWt and began commercial operation on October 17,1984.

The Unit 2 reactor vessel was supplied by Chicago Bridge & Iron, Oak Brook, lilinois. The reactor recirculation systems components were supplied by General Electric, San Jose, Califomia. All other piping examined during the sixth refueling outage was supplied by B. F. Shaw, Wilmington, Delaware.

4 130010 9509130167 950908

[

I U - -. _ _ ___.

..PDR,

,Ak>

PDR ADOCK 05000374 1

i

\\\\

A l!nicom Compan)

d

.g.

The inspections that were performed, the conditions that were observed, and the l

corrective measures that were taken are contained in the attached report.

We certify that the statements made in this report are correct and that the examinations and corrective measures taken conform to the rules of the 1980 Edition of ASME Section XI, including the Winter 1980 Addendum.

If there are any questions or comments regarding this matter, please contact this office.

Respectfully, giL-JoEllen Burns Regulatory Assurance Supervisor i

LaSalle County Station Attachment JEB/lja cc:

H. J. Miller, Regional Administration, Region 111 P. G. Brochman, Senior Resident inspector, LaSalle Station W. D. Reckley, Project Manager, NRR R. J. Zuffa, IDNS Resident inspector D. L Farrar, Nuclear Licensing i