ML20092C325
| ML20092C325 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 08/09/1995 |
| From: | AFFILIATION NOT ASSIGNED |
| To: | |
| References | |
| OLA-3-I-MOS-180, NUDOCS 9509120349 | |
| Download: ML20092C325 (1) | |
Text
__
tvit LT - # 30 f- /l{C3/3A -/fd DOCKETED Whereyouwere--whattypeoflogswarhb 1
Q.
2 reviewing?
95 SEP -8 P4 :07 3
A.
I reviewed.
OFFICE OF SECRETARY 4
Q.
What type of data?
00CKETING & SERVICE BRANCH 5
A.
I reviewed the unit control logs and the shift 6
supervisor's logs.
7 Q.
When was that information compiled?
i 8
A.
It was -- I don't remember the date, but it was the 9
day before, I believe, the confirmation meeting in Atlanta.
10 Q.
Uh-hum (yes).
Other than the operator logs, were 11 there any other sources used to gather information on the 12 diesel generator?
13 A.
I did not use any other sources.
14 Q.
Just the logs?
15 A.
Yes', sir.
16 Q.
What type of information would be in those logs with l,i 17 respects to starts, successful starts, type of information that
- a 8
18 you would find in those logs?
19 A.
For these starts in general -- and like I say, most 20 of these starts were maintenance troubleshooting starts -- the s
ll 21 information that would be logged would be, " Started diesel
>g 22 generator 1-A for maintenance troubleshooting, tripped diesel j
j 23 generator 1-A per over speed trip," you know.
That wa's the l
24 type of log entries that I was looking att very short, very 25 brief.
9509120349 950809 DR ADOCK 050004g4 PDR 4
NUCLEAR REGULATORY COMMISSION M#
(
i Docket No ~,4"v 4 /f 39tE#- 3 EXHIBIT NQM-In the matter of M.fYw/w//M7dE e-O St N O Applicant @ fit @venor O Other b \\ '/
dentified heceived O Rejected Reporter _ /]I4 4/
Date 8-bff Witness ///f8MS#
.