Applicant Exhibit A-154,consisting of Procedure 22332-C, Temperature Switch Calibration
ML20092C193
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/22/1995
From:
GEORGIA POWER CO.
To:
References
OLA-3-A-154, NUDOCS 9509120291
Download: ML20092C193 (10)


Text

BRINEY EXH B

-/g GPC EXH. II __-/#[ProCeoute NO.

J I

Appt Jval Vogtla Electric Generating Plant 22332-C fil'Sa I- [. 4 NUCLEAR OPERAT9H}CKETED R m.on no.

USNRC L

2 o,,,

Georgia Power enino,gg p yo. fp unit common

'95 SFP -A P4:01

\\toj9 g

TEMPERATURE SWITCH CALIBRATION NUCLEAR REGULATORY COdMISSION M6 Docket No $2. /2/' + Y2s fd'] EXHlBfT NO. $-/5/

in the rnatter of_,4 Mw&//hae L[Apphcant 0 intervenor 'O otner

/

O staff O identified Miteceived O Rejecte Reporter _ //2 4)

Date $2ZJI5 witness Ruve v 9509120291 950822 PDR ADOCK 05000424 G

PDR I

tg3 @ A utM

.$.I.

.6 PRoCEoVRE No REVIStoN PAGE No.

VEGP 22332-C 2

2 of 10 1.0 PURPOSE The purpose of this procedure is to provide instructions for Calibration of a Temperature Switch.

2.0 PRECAUTIONS AND LIMITATIONS 2.1 All steps in this procedure are to be performed in i

sequence except as noted.

[]

I 2.2 Performance of procedure step, as identified by a double asterisk (*/*),

shall be initialed on

" Checklist" except when recording data on Data Sheet.[]

i 2.3 The instrument may be located in a radiation area, service a contaminated process fluid, or be contaminated.

If so, follow instructions on " Radiation J.

Work Permit".

()

2.4 For Safety-Related Systems, an Independent Restorati'on Verification shall be performed after completion of Test / Calibration and initialed in " Restoration l

Verification" section of " Checklist".

[]

]

2.5 Any calculations necessary for the performance of this procedure shall be shown on " Calculation Sheet".

[]

I 2.6 Ensure that each lead (wire) to be lifted is marked with a completed and installed jumper and lif ted wire L

tag.

Instead of " Control No.", the " Procedure No."

should be identified on the tag.

[]

1 2.7 If this procedure is completed and temporary jumper (s) must remain installed and/or lifted wire (s) cannot be i

reconnected, a Jumper and Lifted Wire Clearance must be obtained per Procedure 00306-C, " Temporary Jumper And Lifted Wire Control".

[]

2.8 Minimize entry of foreign materials or dirt into the j.

working parts of the instrument.

[]

i 2.9 If, during performance of this procedure, any of the 4

following occur, immediately notify I&C Foreman.

2.9.1 Any personnel error, procedure inadequacy, or malfunction is identified which could prevent a

fulfillment of " Acceptance Criteria".

[]

2.9.2 Any test exceeds specified limits.

[]

  • J)44%

C=

EoCEouRE Odo-REVIStoN PAGE No.

VEGP 22332-C 2

3 of 10 2.10 This procedure may be performed in any plant operational mode.

[]

3.0 PREREQUISITES OR INITIAL CONDITIONS 3.1 Notify Shift Suaervisor, or designee, of work to be

  • /*

performed and obtain signature authorization.

[]

l l

3.2 Notify Reactor Operator (RO) that instruments

  • /*

associated with switch may be erratic or inoperable during performance of this procedure and obtain RO signature.

[]

3.3 TEST EQUIPMENT REQUIRED i

3.3.1 Temperature Bath

[]

3.3.2 Fluke 2175A Digital Thermemeter or equivalent

[]

3.3.3 Triplett Model 630 VOM or equivalent

[]

3.4 Verify all Prerequisities or Initial Conditions are

[]

  • /*

met.

4.0 MAIN BODY 4.1 CALCULATIONS 4.1.1 Obtain instrument setpoint Data from appropriate

  • /*

controlled document (s) and record document number (s) in

" Comments" section of " Data Sheet".

[]

~~-

i 4.1.2 Calculate and record input and expected values in

  • /*

" Input" and " Expected" sections of " Data Sheet".

[]

4.1.3 Calculate Hi and to Limits and record in "Hi Limit" and

  • /*

"Lo Limit" sections of " Data Sheet".

[]

4.2 REMOVAL FROM SERVICE NOTE The length of capillary immersed in temperature bath must be the same as length of j

capillary immersed in process.

l f

4.2.1 Close isolation valve (if applicable).

[]

k$$h k.

)

i

PROCEDURE NO.

RE VISlote PAGE No.

VECP 22332-C 2

4 of 10 l

4.2.2 Disconnect lead wires from switch as required.

[]

  • /*

(Independent Verification required for safety-related systems) 4.2.3 Remove temperature sensing element from thermowell

[]

and/or holding apparatus as necessary.

4.3 CALIBRATION 4.3.1 Place temperature sensing element and Fluke digital

[]

thermometer in temperature bath.

4.3.2 Connect VOM across appropriate terminals to monitor

[]

contact action of switch under test.

4.3.3 Adj us t temperature bath to a point at which VOM indicates contacts are in reset condition.

[]

NOTE As setpoint is approached temperature bath should be adjusted in smaller increments, allowing temperature to stabilize j

after each adjustment of temperature bath and prior to obtaining data and switch conditions.

4.3.4 Adj us t temperature oath to point at which required trip

  • /*

point is indicated by VOM and record temperature bath value in "As Found" section of " Data Sheet".

[]

4.3.5 Adj us t temperature bath to point at which required action is indicated by' VOM and record

  • /*

reset contact temperature bath value in "As Found section of " Data Sheet".

[]

4.3.6 If required, connect VOM to additional switch contacts and repeat steps 4.3.3 thru 4.3.5.

[]

4.3.7 If As Found readings are within limits specified on

  • /*

" Data Sheet" and more accurate readings are not desired, record readings in "As Left" section of " Data Sheet" and proceed to appropriate subsection.

(1 90 M4S

i-PROCEDURE No.

REVISION PAGE Mo.

VECP 22332-C 2

5 of 10 4.3.8 If As Found readings are not within limits specified on

" Data Sheet", or more accurate readings are desired, proceed as follows:

I Ensure that V0M is connected across correct switch a.

terminal.

[]

erature bath to setpoint value as b.

Adj us t temp' Data Sheet".

[]

listed on c.

Adj us t switch as required to.obtain correct contact action as indicated by VOM.

[]

j l

d.

Adjust temperature bath to point at which VOM indicates contact trip action and note temperature value.

[]

e.

Adjust temperature bath t.' point at which VOM indicates contact reset action and note temperature value.

[]

f.

Repeat steps 4.3.8b thru 4.3.8e until no further adjustments are necessary.

[]

g.

Reco.d final values obtained in "As Left" section

  • /*

of " Data Sheet".

[]

4.3.9 If temperature switch has more than one contact, repeat steps 4.3.8a thru 4.3.8g if appropriate until all contacts have been calibrated.

[]

4.4 RESTORE TO SERVICE 4.4.1 Disconnect all test equipment used in performance of

  • /*

this procedure.

[]

4.4.2 Reinstall temperature sensing element in thermowell

  • /*

and/or holding apparatus as required.

[]

4.4.3 Reconnect switch leads as required.

[]

  • /*

4.4.4 Open isolation valve (if applicable).

[]

  • /*

4.4.5 Verify instrument reflects current plant conditions

  • /*

after it is returned to service.

[]

?

ti,644 C.

~

f I

i PROCEDURE No.

REVISION PAGE Wo.

VEGP 22332-C 2

6 of 10 l

1 4.4.6 For Safety-Related systems, have an Independent j

  • /*

Restoration Verification performed by designated personnel.

[]

4.4.7 Notify RO that instrument has been returned to service.

[]

I 4.4.8 Notify Shift Supervisor, or designee, of completion of l

  • /*

work including test results and obtain signature on

" Completion Sheet".

[]

i 5.0 ACCEPTANCE CRITERIA 5.1 The Acceptance Criteria for this procedure is that the temperature switch is within limits specified on " Data Sheet".

5.2 Satisfactory completion of this procedure has been met when I&C Foreman has evaluated data obtained per Acceptance Criteria of this procedure, reviewed, and signed " Data Sheet" provided.

6.0 REFERENCES

i 6.1 Instruction Manual for switch under test.

6.2 Procedurc 00306-C, " Temporary Jumper And Lifted Wire Control" END OF FROCEDURE TEXT i

l

'C e44'e L

T T

T F

F F

E E

E L

L L

0 1

S S

S 1

A A

A f

f o

E E

E o

T T

T 1

A A

A 7

D D

D D

D D

t N

N N

e U

U U

e O

O O

h F

F F

S S

S S

A A

A o

N oN l

l l

a l

i e

r d

T T

T o

e o

I I

I N

S M

M M

M eg I

I I

a L

L L

P I

I I

H H

H Y

B Y

Y B

B D

T T

T E

D D

I I

I M

E E

M M

M R

W V

I I

I O

E O

L L

L F

I R

T R

V P

E O

O O

E E

P E

L L

L P

R A

H 2

S A

E T

r D

D.

D T

A e

E r

E A

D r

T T

T D

u C

C C

n t

E E

E E

o c

P P

P U

i a

X X

X D

t f

E E

E a

u N

c n

O o

a I

n L

M T

o A

is m

S S

S R

e T

T T

B R

I I

I I

N N

N L

h U

U U

A c

C t

T i

N w

E S

M P

e I

r U

C u

QO t

E N 2

a 3

r T L 3

e S E 2

p E D 2

m T O e

M T

d d

d e

e e

p t

p t p t n

p e p e p e o

A i

s i

s i

s P

.,i

/

r e r e r e G

o t

N TR T R T R S

.E N

p T

O oV i

n h h n h h n h h N N

N r

S o c c o c c o c c E e

t c

E i

t t

i t

t i

t t M ru d

s s

T t i i

t i

i t

i i

M D.

e n

e O

c w w c w w c w w O O

co I

D N

A S S A S S A S S C I

rP

~, w 1

l 9

PROCEDURE NO.

REVISION PAGE NO.

VEGP 22332-C 2

8 of 10 l

Sheet 1 of 1 CALCULATION SHEET Show all calculations performed during course of this procedure in the space below.

Completed by:

Date:

Reviewed by:

Date:

Approved by:

Date:

J$.

m

/

t.l", '. * $ $

PROCEDURE No.

REVISloN PAGE No.

VEGP 22332-C 2

9 of 10 l

Sheet 1 of 1 CHECKLIST 3.1 Shift Supervisor Authorization

/

Signature Date 3.2 Reactor Operator (RO) Notified

/

Signature Date STEP VERIFICATION Step /Substep Initial Step /Substep Initial 3.4 Prerequisites met 4.4.4 Isolation valve open l

4.2.2 Leads disconnected 4.4.5 Reflects plant l

4.2.2 Independent conditions Verification 4.4.1 Test equipment removed 4.4.2 Element installed l

4.4.3 Leads connected RESTORATION VERIFICATION Initial Initial 1.

Element installed

3. Isolation valve open 2.

Leads connected t

Performed by:

Date

~~

Reviewed by:

Date

,, p.

m 1,N.

PROCEDURE NO.

REVISIOM PAGE NO.

VECP 22332-C 2

10 of 10 l

Sheet 1 of 1 I

COMPLETION SHEET PROCEDURE TITLE TEMPERATURE SWITCH CALIBRATION TIME TEST STARTED BY DATE DEFICIENCIES OCCURRED AND ACTIONS TAKEN l

l l

l TEST RESULTS:

ACCEPTABLE [ ]

UNACCEPTABLE [ ]

TEMPERATURE SWITCH RESTORED TO SERVICE [ ]

TEMPERATURE SWITCH COMMITTED TO REPAIR [ ]

TEST COHPLETED BY TIME DATE l

SHIFT SUPERVISOR NOTIFIED

/

Signature Time Date

~~

REVIEWED BY:

DATE:

)

APPROVED BY:

DATE: