GENERAL OFFICE P.O. Box 499. COLUMBUS, NEBRASKA 68602-0499 Nebraska Public Power District
" Taxi"#fes%'"
NLS950181 September 8,1995 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 4
Subject:
Withdrawal Request of Proposed Change No.s 66,119,120,121, and 123 to the CNS Technical Specifications Cooper Nuclear Station NRC Docket No. 50-298, DPR-46
References:
1)
Letter (NLS9000042) from L. G. Kuncl, NPPD, to USNFC Document Control Desk dated January 26,1990, Proposed Change No. 66 to CNS Technical Specifications; " Safety Valve and Safety Relief Valve Setpoint Tolerances."
2)
Letter (NSD930928) from G. R. Horn, NPPD, to USNRC Document Control Desk dated December 10,1993, Proposed Change No. I19 to CNS Technical Specifications; " Revision of Pressure Temperature Limitation Curves."
3)
Letter (NSD930992) from G. R. Horn, NPPD, to USNRC Document Control Desk dated August 31,1993, Proposed Change No.120 to CNS Technical Specifications; " Primary Containment Isolation Valve Tables."
4)
Letter (NSD930978) from G. R. Horn, NPPD, to USNRC Document Control Desk dated August 23,1993, Proposed Change No.121 to CNS Technical Specifications; " Administrative Controls Section Vice-President Nuclear."
5)
Letter (NSD931096) from G. R. Horn, NPPD, to USNRC Document Control Desk dated September 28,1993, Proposed Change No.123 to CNS Technical Specifications; " Administrative Controls Section Organizational Changes."
Gentlemen:
The Nebraska Public Power District (District) submitted to the Nuclear Regulatory Commission (NRC) the above referenced Proposed Changes to the Cooper Nuclear Station (CNS) Technical Specifications on the dates identified above. The District is now considering implementation of the Improved Technical Specifications (ITS) for CNS. The ITS follows the guidelines and format of the Standard Technical Specifications (NUREG 1433). However, the reference submittals do not follow the guidance or format provided in the Standard Technical Specifications and therefore, would require additional resources (time and money) from both parties (District and NRC) if approved and implemented.
1100EG
{,*
~ 9509120228 950908 s
PDR ADOCK 05000298 i
a P._______
.====._..-_.-
=_
s NLs950181 e' September 8,1995 Page 2 Accordingly, the District rer uests to withdraw from consideration Proposed Technical Specifications g
Change No.s 66,119,120.121, and 123, for CNS submitted in the above references. The revisions identified by these proposee changes will be reviewed and, where appropriate, incorporated into District submittals implementing the ITS.
Should you require additional informatica, or have any questions, please contact this office.
Sincerely, 1.11. Mueller Site Manager GRii\\tja-wsom Enclosure cc:
Regional Administrator U. S. Nuclear Regulatory Commission - Region IV Arlington, TX 1
NRC Resident inspector Cooper Nuclear Station Project Manager - Cooper Nuclear Station U. S. Nuclear Regulatory Commission Washington, DC NPG Distribution w/o encl.
i
)
l J
l i
l i
LIST OF NRC COMMITMENTS ATTACHMENT 3 Correspondence No: NLS950181 The following table identifies those actions committed to by the District in this document. Any other actions discussed in the submittal represent intended or planned actions by the District. They are described to the NRC for the NRC's information and are not regulatory commitments. Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.
COMMITTED DATE COMMITMENT OR OUTAGE None l