Provides Overall Plan & Schedule for Hydrogen Water Chemistry Control Sys to Be Installed Based on EPRI Guidelines for Permanent BWR Hydrogen Chemistry Installation-1987 Rev, EPRI NO-5238-SR-A,during Cycle 7
ML20092B868
Person / Time
Site: Browns Ferry 
Issue date: 01/31/1992
From: Zeringue O
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9202110162
Download: ML20092B868 (3)


Text

-.

nn ter,eun wm Asat, sw wa w,, n o t ui tww n un t

O J *W 2mingso we 5%unt o.c.es e ry cram JM 311992 U.S. Nuclear Regulatory Comminolon ATTH: Document Contri Desk Washington, D.C.

205W Gentlemen In the Matter of

)

Docket Hos. 50-259 Tennecaec Valley Authority

)

50-260 50-296 BROWNS PERRY NUCLEAR PhANT (BFN) - IMPLEMENTATION PLANS FOR llYDROCEN WATER i

CllEMIS1RY CONTR0h firWCC)

References TVA letter dated September 20, 1991, Browns Ferry Nuclear Plant (BFN) - States and Schedule for Completion of Unit 2 Post-Restart Issues os part of the referenced letter, TVA committed to provide NRC staff with an action plan describing the prostr.:n for INCC. This letter provides the overall plan and schedule for INCC Program.

BPN will complete the installation of a INCC system during Unit 2 Cycle 7.

The system will be installed in accordance with the Electric Power Research Institute (EPRI) " Guidelines for Permanent BWR !!ydrogen Water Chemistry Installations - 1987 Revision", EPRI NO-5238-SR-A.

Prior to the !!WCC system startup and operation, TVA will complete further evaluation of the potential impact and benefits of' chemical decontamination, eine injection, stellite removal, and projected dose level. TVA will ' = luate the operating expe 'lence of INCC on Unit 2 prior tc impleme ~ stion of INCC on Units 1 and 3.

i n.

PDR ADOCK 05000259 r7gd[

./J 9202110162 920131 P

PDR glg

2 U.S. Nue) ear Regulatory Commission JAll 31 1992 A summary list of commitments contained in this lotter is provided as the enclosure.

If you have any questions, please telephone R. R. Baron at (205) 729-7566.

i Sincerely, i

/

~,l' dOh?'{fl 0.

r ringue.

i Enclosure cc (Enclosure):

NRC Resident inspect or Browns Ferry Nucles: Plant.

Rout

  • 12, Box 637 Athens, Alabama 3$6.',1 Mr. Thierry M. Ross, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11b55 Rockville Pike Rockville, Maryland 20852 Mr. B. A. Wilson, Project Chief U.S. Nuclear Regulatory Commission Region II 101 Marietta Street,, NW, Suite 2900 Atlanta, Georgia 30323 e

y s

.%_4 m7.

r o

ie

a ENCLOSURE Brovnt Ferry Nuclear Plant Summary of Commitment BrN will complete the installation for a Unit 2 !!WCC system based on EPRI

" Guidelines for Permanent BWR !!ydrogen Chemistry Installation-1987 Revision,"

EPRI NP-528 bSR-A, during the Unit 2 Cycle 7.

,