Forwards Application for Amend to License NPF-86 Re Revs to Main Steam Safety Valve Setpoints & Max Allowable Power Range Neutron Flux High Setpoints W/Inoperable Main Steam Safety Valves
ML20092A610
Person / Time
Site: Seabrook 
Issue date: 09/05/1995
From: Feigenbaum T
NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20092A613 List:
References
NYN-95069, NUDOCS 9509110108
Download: ML20092A610 (2)


Text

_ _ _.

a I

.g%

North Atlantic Energy Service Corporation A

3 Nor(L11 y.o. Soa 300 Mg(y Seabrook, N1103874 i

(603) 474-9521, Fax (603) 474-2987 The Northeast Utilities System Ted C. Feigenbaum NYN-95069 Senior Vice president &

Chief Nuclear Officer September 5,1995 i

United States Nuclear Regulatory Commission Washington, D.C. 20555 Attention:

Document Control Desk

Reference:

Facility Operating License No. NPF-86, Docket No. 50-443

Subject:

License Amendment Request 95-04: Revisionsto Main Steam Safety Valve Setpoints and Maximum Allowable Power Range Neutron Flux High Setpoints with Inoperable Main Steam Safety Valves Gentlemen:

North Atlantic Energy Service Corporation (North Atlantic) has enclosed herein License Amendment Request 95-04. This License Amendment Request (LAR) is submitted pursuant to the requirements of 10CFR50.90 and 10CFR50.4.

i i

The purpose of LAR 95-04 is to propose changes to the Seabrook Station Technical Specifications j

to reduce the setpoints of the Main Steam Safety Valves (MSSVs) and to reduce the maximum allowable Power Range Neutron Flux - liigh setpoint with inoperable MSSVs. The proposed changes will enhance the capability of MSSVs to limit the consequences of postulated overpressure events in compliance with the requirements of the ASME Boiler & Pressure Vessel Code (1974 Edition, including the Summer 1975 Addenda).

LAR 95-04 has been reviewed and approved by the Station Operation Review Committee and the Nuclear Safety Audit Review Committee.

- As discussed in the enclosed LAR Section IV, the proposed changes do not involve a significant hazard consideration pursuant to 10CFR50.92. A copy of this letter and the enclosed LAR have been forwarded to the New llampshire State Liaison Officer pursuant to 10CFR50.91(b). In addition, North Atlantic has determined that LAR 95-04 meets the criteria of 10CFR51.22(c) for a categorical exclusion from the requirements for an Environmental Impact Statement (see Section VI enclosed).

North Atlantic requests NRC review of LAR 95-04 and issuance of a license amendment by October 27,1995 with an effectivness by approximately November 3,1995 (see Section V enclosed).

110043 0

950911010s 950905 T\\

DR ADOCK 05000443 ppg __,__ _

V-

~

United States Nuclear Regulatory Commission September 5,1995 Attention:

Document Control Desk Page two Should you have any questions regarding this letter, please contact Mr. James M. Peschel, Regulatory Compliance Manager, at (603) 474-9521, extension 3772.

Very truly yours, hA Ted C. Feigenbgm TCF:JMPjr/act Enclosure cc:

Mr. Thomas T. Martin Regional Administrator United States Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia, PA 19406 Mr. Albert W. De Agazio, Sr. Project Macager Project Directorate 1-4 Division of Reactor Projects U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. John Macdonald NRC Senior Resident inspector P.O. Box 1149 Seabrook, Nil 03874 Mr. George L. Iverson, Director New Ilampshire Office of Emergency Management 107 Pleasant Street Concord, Nil 03301 1

.