@ Consumers Dean L Quamme P0 vEp Site Afanager
{Q QQ Afidland Project Mdland Project: Po Box 1963, Mdiand. Mt 48640 e (517) C31-8650 June 7, 1984 Mr John J Harrison, Chief Midland Preject Section US Nuclear Regulatory Commission Region 111 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND ENERGY CENTE ROJEUI 3
MIDLAND DOCKET N 0-329, 50-3 W CCP MONTHLY RE RT-FOUR WEEK PERIOD ENDING MAY 25, 1984 File: 0655 Serial: CSC-7857 This report encompasses both Bechtel Status Assessment and MPQAD Quality Verification activities and results through May 25, 1984.
1.
INSTALLATION STATUS ASSESSMENT
SUMMARY
MANPOWER For the week ending May 25, Bechtel had 100 field engineers performing status assessment.
Forecast for upcoming weeks remair.s at or below 100 field engineers performing status assessment.
9406190127 840607 PDR ADOCK 05000329 R
PDR j@ ld OC0584-005A-CN04 p4
g 2
NONCONFORMANCES RESULTING FROM STATUS ASSESSMENT Since the last report, Bechtel completion teams wrote 494 NCRs as a result of status assessment. As of 5/25/84, 1110 NCR's have been validated from
'Bechtel's status-assessment activity.
INSTALLATION STATUS ASSESSMENT FOR MODULES RELEASED FOR PHASE 1 Module Description Percent Complete
- Actual Scheduled Actual Last Month 340 Reactor Bldg 2 areas outside 64%
100%
53 OTSG enlosures 800 Service Water Building 87%
56%
61 102
' Auxiliary Bldg Pipeway 56%
100%
60 120 Auxiliary Bldg Elev 614 55%
79%
44 410 Turbine Bldg Elev 614 Complete Complete 150 (151)
Auxiliary Bldg Elev 634 3%
73%
13 160 (161&l62)
Auxiliary Bldg Elev 645 0
50%
0 240 Main Control Room 36%
50%
30 320 Reactor Bldg 2 North D Ring 5%
90%
7 330 Reactor Bldg 2 South D Ring 5%
73%
4 820 Diesel Generator Bldg 21%
50%
11 0verall Plant 19%
33%
16%
- Actual completion values are based on earned manhours and trend forecast manhours. Schedule completion values are estimates based on original scheduled duration of SA activities in the corresponding module.
2.
QUALITY VERIFICATION PROGRAM
SUMMARY
The Quality Verification Program completed its sixth month of reinspection on May 25, 1984. Reinspection continued in modules 800 (Service Water Building), 340 (Unit 2 Containment), 120 (Elev 584 Aux Building) and 102 (East Pipe Way) this month.
Reinspection was initiated in modules 330 (RB Unit 2 South D-Ring), 240 (Elev 659 Aux Building) and 150 (Elev 634 Aux Building) during this period.
Reinspections were performed in modules 900 (Yard), 130 (Elev 599 Aux Building) and 110 (Elev 568 Aux Building) to 0C0584-005A-CN04
.2
i 3
complete reinspections statted in released modules. The Verification Program continues to support the module priorities while encountering no difficulties. The number of inspections completed and nonconformance reports issued for the period, and totals to date are shown in Attachment 1.
DISCUSSION BY MODUI-E
~
Module 800: At peak there were approximately three Civil, EJectrical and
-Mechanical inspectors reinspecting in module 800 during thic month. There.
were 34 Nonconformance Reports.(NCRs) initiated making a total to date of 441"NCRs. No new significant quality attribute problem was identified this month.
- Module '340: At peak there were approximately 26 Civil, Electrical and Mechanical inspectors reinspecting in module 340 during this month. There were.54 NCRs initiated making a total to date of 249 NCRs. No new signifi-cant quality attribute problem was identified this month.
Module 330: At peak there was approximately one Civil inspector reinspecting
=in module 330 during this month. There was no NCR written.
Module 240: At peak there were approximately 14 Civil, Electrical and Mechanical inspectors reinspecting in module.240 during this month. There were 10 NCRs inititated taking the total to date 10 NCRs. No significant quality attribute problem was identified this month.
Module 150: At peak there was approximately one Mechanical inspector reinspecting in module 150 during this month. There was no NCR written, Module 120: At peak there were approximately 22 Civil, Electrical and Mechanical inspectors reinspecting in module 120 during this month. There were 105 NCRs initiated making the total to date.232 NCRs. No new signifi-cant quality attribute problem was identified this month.
-Module 102: At peak there were approximately 26 Civil, Electrical and Mechanical inspectors reinspecting in module 102'during this month. There were 29 NCRs initiated making a total to date of 121 NCRs. No new signifi-cant quality nttribute problem was identified this month.
Module 900:- The Civil inspectors were reinspecting in module 900 to complete reinspections that were initiated in module 800. There was no NCR written.
Module-130: The Mechanical inspectors were reinspecting in module 130 to complete reinspections that were initiated in module 120. There was no new NCR written.
~ Module 110: The Electrical inspectors were reinspecting in module 110 to complete reinspections that were initiated in module 120. There was no
.NCR written.
4
)
OC0584-005A-CN04
. 3 4
-NCR REVIEW The-NCRs in the Civil discipline generally pertain to the soundness of placed concrete and grout. The NCRs in the Mechanical discipline generally relate'to workmanship (i.e., porosity, surface appearance and are strikes).
'The NCRs in the Electrical discipline generally relate to damage, incorrect dimensions and lack of inspection criterion.
DLQ/EME/ kip s.
CC: Administrator, Region III DSHood, NRR Project Manager, Washington Midland Project Manager, Region III Midland Resident Inspector, Midland
- 1 OC0584-005A-CN04
ATTACHMENT 1 INSPECTIONS COMPLETED AND NCR'S ISSUED TOTAL VIRs VIRs PERCENT NCRs MONTH ENDING MODULE VIRs NEEDED*
OPENED CLOSED OF TOTAL OPENED t
5/25/84 102 5422 600 341 6.3 29 l
120 6088 233 354 5.8 105 150 6571 2
1 0.0 0
240 1671 119 9
0.1 10 330 1530 1
1 0.0 0
340 4624 443 373 8.1 54 800 2494 29 64 2.6 34
- 110 2
2 0
- 130 12 3
0
- 900 4
0 0
Month Totals 1445 1148 232 Totals to Date 102 5422 1367 795 14.7 121 120 6088 886 699 11.5 232 L
150 6571 2
1 0.0 0
180 51 40 40 78.4 13 240 1671 119 9
0.1 10 330 1530 1
1 0.0 0
340 4624 1799 1185 25.6 249 800 2494 1039 882.
35.4 441
- 110 2
2 0
- 130 15 4
1
- 140 10 0
0
- 200 2
2 0
- 900 7
0 0
Overall Totals 5289 3620 1067 1
- Total VIRs needed based on the Schedule Model, Rev 4, 3/19/84.
- VIRs opened to complete reinspections started in released modules.
OC0584-005A-CN04 5
.