a VERMONT YANKEE NUCLEAR POWER CORPORATION FVY 84-61 RD 5, Box 169, Ferry Road, Brattleboro, VT 05301 ENGINEERING OFFICE 1671 WORCESTER ROAD FRAMINGHAM, MASSACHUSETTS 01701 e
TELEPHONE 617-872-8100
~
June 12, 1984 U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Attention:
Office of Nuclear Reactor Regulation Mr. Domenic B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing
References:
a License No. DPR-28 (Docket No. 50-271) b Letter, USNRC to VYNPC, FVY 83-30, dated 4/19/83 c
Letter, USNRC to All Operating Licensees, Generic Letter 82-33, dated 12/17/82
Dear Sir:
Subject:
NUREG 0737, Supplement I - Regulatory Guide 1.97, Application to Emergency Response Facilities By letter dated April 19, 1983 (Reference b), we provided you with our integrated program plan and schedule for addressing NUREG 0737, Supplement 1, Requirements for Emergency Response Capability.
The purpose of this letter is to notify you of an extension to our schedule for completing our engineering assessment of Regulatory Guide 1.97 variables. The revised schedule is as follows:
1)
The engineering assessment of the Regulatory Guide 1.97 Type A, B, C, D, and E variables will be complete in September 1984.
2)
A final report detailing the results of our assessment will be sub-mitted in October 1984 This report will include our justification for deviation from the Regulatory Guide, as well as our proposed sche-dule for implementing any necessary modifications.
It should be noted that our engineering assessment will be performed using Revision 3 of Regulatory Guide 1.97 8406180304 840612 DR ADOCK 0500027}
ll0
' U.S. Nuclear R::gulatory Commission June 12, 1984 Page 2 VERMONT YANKEE NUCLEAR POWER COMPORATION Our schedular extension reflects the need to concentrate our engineering resources on efforts associated with the 1984 refueling outage, scheduled to commence on June 16, 1984.
Numerous significant and extensive engineering modi-
'fications, including those required by the NRC (e.g., environmental qualifica-tion of safety-related electrical components in accordance with the provisions of 10CFR50.49) are scheduled to be installed during this outage.
Deferring the endneering associated with Regulatory Guide 1.97 will allow us to continue to concentrate our resources on outage-related activities.
We trust that the revised schedule is acceptable; however, should you have any questions in this matter, please contact us.
Very truly yours, VERMONT YANXEE NUCLEAR POWER CORPORATION nA&f Y
WarrenP.[ Murphy U Vice President and Manager of Operations
.c WPM /dm STATE OF VERMONT)
)ss WINDHAM COUNTY )
c Then personally appeared before me, Warren P. Murohy, who, being duly
_' sworn, did state that he is Vice President and IN wer of Operations of Vermont Ycnkee Nuclear Power Corporation, that he is 6'sy ath2rized to execute and file g
the foregoing document in the name and on W abc of Vermont Yankee Nuclear Posier n and that the statements th ;:6 3 e true to the best of his kn Nn S$