.V
.. a x.
':0 PSEG Public Service Electric and Gas Company P.O. Box 236 _ Hancocks Bridge, New Jersey 08038 Nuclear Department
_May 24,-1984
. Regional Administrator, Region 1 U.
S.
Nuclear Regulatory Commission 631 Park Avenue-
~ King of-Prussia,' Pennsylvania 19406 Attention:-
Mr. Richard W.
Starostecki, Director Division of Project and Resident Programs
Dear Mr.'Starostecki:
NRC COMBINED INSPECTION 50-272/84-13 AND 50-3'11/84-13
~
JALEM GENERATING STATION UNITS NO. 1 AND 2 DOCKET NOS. 50-272.AND 50-311' During the subject inspection, conducted on March 7 through April 11, 1984, two violations were observed including failure-to post and_ control access to a high radiation area and
_ failure to_take prompt corrective action involving the removal of~ combustibles identified in the auxiliary building.
The following are'PSE&G's responses to this Notice of Violation.
Item A Criteria.XVI of 10 CPR 50 Appendix B requires that the
' licensee's Ouality Assurance Program (OAP) establish measures to-assure that conditions adverse to quality be promptly identified and corrected.
Section-17.2.16 of the SGS-UFSAR, the licensee.OAP,' requires that administrative procedures (AP) which govern station activities covered by the OAP provide for
-timely discovery and correction of nonconformances.
AP 25, 8406150236 840611 PDR ADOCK 05000272 G
PDR The Energy People
% 2168 (75 % i2 83 a
C:
% s.
' Mr._ Richard W.
Starostecki
. 5/24/84-
's>
Station Fire Protection Program, requires timely correction of L
- identified deficiencies and requires removal of packing materials and other combustibles from work areas immediately following work completion or at the end of each shift, whichever comes.first.
Contrary To The Above:
E Cardboard boxes-of MSA ventilation filters in an area without fixed suppression on the 122' elevation of the-Unit-2 auxiliary building were identified as a deficiency in the-licensee Management Cleanliness and Material-Inspection Report dated March 2, 1984 and the deficiency was not corrected as of March 22, 1984.
Reply to Item A a.
' Corrective Steps Which Have Been Taken And The Results Achieved:
The.Operstions Department responsed by immediately removing.the combustible packing material from the building aad moving the filters to an area protected by a fixed suppression system until installation could be.
-completed.
b.
Corrective Steps which Will Be Taken To Avoid Further violations The Operations Manager has directed his staff and shift personnel to aggressively enforce-the station combustible material control program.
Discrepanci9s noted on the OD-34 log will be promptly, corrected if in the opinion of the Shift-Support Supervisor, these are violations of AP-25, Station Fire Protection Program.
All operating personnel responsible for implementation of the combustibles control program have been advised that action must be taken immediately when violations occur, and their responsibilities in this area have been reemphasized.
c.
Date When Full Compliance Will Be Taken We are in full compliance.
/
m y
1 1.
>.0
- [ 4.
Mr. Richard W..Starostecki-5/24/84 Item B
- Technical Specification 6.'12 requires that high radiation areas n(greater. than 100 mrem / hour) be barricaded and conspicuously; posted as a High Radiaton Area and that areas accessible Lto : personnel with : radiation levels euch that a smajorsportion of 'the. body could receive a dose greater than
- 1000 mrem in one hour be locked to. prevent unauthorized access.
Contrary _To The Above:
Oin March'26, 1984, a zone survey of the Unit 2 Skimmer Filter Room identified aLhigh radiation area in which
-a-person could receive greater than 1000 mrem to a
. maj o' portion of the body in one hour.
As of March 30, 1984, the area was.neither-conspicuously posted-as a High Radiation Area nor locked to prevent unauthorized Access.
Reply To Item B
.a.-
Corrective Steps-Ehich Have Been Taken And The Results Achieved
.The Radiation Protection Department responded by-immediately blocking all doors leading to the Unit 2 Spent FuelLPool Skimmer. Filter Room.
Personnel responsible for failing to take action to properly control this area were disciplined._ Meetings were held with Radiation Protection Department personnel to inform them of the incident:and to emphasize the.importance of conducting : thorough surveys and questioning'. abnormal conditions'and the need for proper posting of area._
Department personnel have been instructed to document (on the survey map) all postings
.within an area when c'onducting a zone survey.
A trending mechanism is being utilized to provide early warning to Radiation Protection personnel of:the need to take corrective action due to changing dose rates for this and-other areas where changing dose rates exist.
An instruction was-placed in the night order book for
. Radiation Protection Technicians giving instructions regarding the-identification of High Radiation or High ConLamination readings on Radiation-Contamination survey forms.
The filter survey form was modified to include the Unit 1 and Unit 2 Spent Fuel Pool Skimmer Filter.
p
..:, f v: c:-
j
- Mr.-Richard W.-Starostecki 5/24/84 Lockable gates:have been installed at the entrance to the
. room for purposes of controlling personnel access.
- Also, a Design ' Change Request has been initiated to lower the setpoints on IR29.and 2R29 to provide additional warning of increasing dose rates.
b.
Corrective Steps Which Have Been Taken To Avoid Further Violations
-A_ review of the practice of having Radiation workers performing " Zone" surveys will be conducted to determine if these persons possess-the required skills-to perform an adequate " Zone" survey.
c.
.Date When-Full Compliance Will be Achieved We are in full compliance.
Sincerely, E.
A.- Liden Manager - Nuclear
-Licensing and Regulation C
Mr. Donald C..Fischer Licensing Project Manager Mr. James Linville Senior Resident Inspector
/
9 64.
l i d,,..
- 53
- +
y
.